Skip to content
PlanIndex Get alerts
Menu

Planning application

59 Tyninghame Avenue Aldersley Wolverhampton West Midlands WV6 9PP

Granted Wolverhampton 07/00304/FUL Full Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Two storey and single storey rear extension including a pitched roof over existing front flat roof.

As published by the council, reference 07/00304/FUL

Application record

Reference
07/00304/FUL
Type
Full Application
Status
Decided
Decision
Grant
Received
27 Feb 2007
Validated
27 Feb 2007
Decided
24 Apr 2007
Ward
Tettenhall Regis
Decision by
Delegated Decision
Postcode
WV6 9PP

Timeline

Dates from the published record

  1. 27 Feb 2007

    Received by Wolverhampton

  2. 24 Apr 2007

    Decision issued: Grant

  3. 15 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 71 Tyninghame Avenue Wolverhampton West Midlands WV6 9PP

    21/00552/TR Submitted 1 Apr 2021 52m away

    06/00039/TPO (T35) - Lime - Prune back to previous pruning points

    Granted Trees 2 docs
  • 92 Tyninghame Avenue Wolverhampton West Midlands WV6 9PW

    TREE/0016/08/TR Submitted 7 Feb 2008 120m away

    Lime Tree: Dead Wood & 20% crown thin. A1 (T10)

    Granted Trees 1 doc
  • 20 Lothians Road Wolverhampton West Midlands WV6 9PN

    21/00931/TR Submitted 24 May 2021 132m away

    06/00039/TPO (A1) - Cherry - Crown reduce by up to one third of existing canopy volume. Reason(s): Ongoing maintenance to manage the tree.

    Granted Trees 2 docs
  • Grass Verge At Junction Of Lothians Road And Codsall Road, Claregate, Wolverhampton, WV6 9PR

    26/00861/TEL Submitted 7 Aug 2026 149m away

    89% historically approved · decision due ~2 Oct

    Proposed 20m high 5G telecommunications streetworks Orion monopole mast and antennas, with ground cabinets and associated ancillary development.

    Awaiting decision Telecoms
  • 21 Tyninghame Avenue Wolverhampton West Midlands WV6 9PP

    22/01315/FUL Submitted 21 Nov 2022 162m away

    Single storey rear extension and change front elevation to render finish

    Withdrawn Full applications Extension 3 docs
    Small domestic
  • 8 Lothians Road Wolverhampton West Midlands WV6 9PR

    21/00436/TR Submitted 17 Mar 2021 166m away

    06/00529/TPO (T5 & T7) - Pine - Crown clean, by the removal of any crossing, rubbing, duplicated or otherwise poorly formed branches, up to a maximum of 15% of crown volume and crown lift easternmost pine tree (T7) by the removal of the downward facing growing secondary branches off the lowest main limb on the roadside (Indicated by dashed red line on attached photo) . Reason(s) Reduce issues with bird mess and sap on the. N.B. Alteration to work proposal were agreed with the Agent on 6th May 2021.

    Granted Trees 2 docs

In Wolverhampton

  • 26/00370/FUL Refused

    146 Probert Road Wolverhampton West Midlands WV10 6UA

    Proposed single storey rear extension, roof alterations and loft conversion

    14 Apr 2026 Full applications
  • 25/00406/FUL Granted

    Garage Site Behind 6 To 20 Pace Crescent Wolverhampton West Midlands

    Five new dwellings.

    1 Apr 2025 Full applications
  • 26/00621/FUL Granted

    43 Marshall Road Wolverhampton West Midlands WV13 3PB

    Single storey side and rear extension with loft conversion and new dormer. (Amended description)

    4 Jun 2026 Full applications
  • 26/00536/FUL Granted

    24 Springfield Lane Wolverhampton West Midlands WV10 6PX

    Two storey side extension

    14 May 2026 Full applications
  • 26/00740/FUL Granted

    32 Danescourt Road Wolverhampton West Midlands WV6 9BG

    Single storey rear extension

    6 Jul 2026 Full applications