Skip to content
PlanIndex Get alerts
Menu

Planning application

Fern Bank 23 Larches Lane Finchfield Wolverhampton West Midlands WV3 9PX

Granted Wolverhampton 06/01669/FUL Full Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey rear extension

As published by the council, reference 06/01669/FUL

Application record

Reference
06/01669/FUL
Type
Full Application
Status
Decided
Decision
Grant
Received
4 Dec 2006
Validated
8 Dec 2006
Decided
2 Feb 2007
Ward
Park
Decision by
Delegated Decision
Postcode
WV3 9PX

Timeline

Dates from the published record

  1. 4 Dec 2006

    Received by Wolverhampton

  2. 8 Dec 2006

    Validated

    Checked as complete and ready for consideration.

  3. 2 Feb 2007

    Decision issued: Grant

  4. 6 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 85-87 Tettenhall Road Wolverhampton West Midlands WV3 9NE

    08/00038/FUL Submitted 8 Jan 2008 24m away

    Conversion of offices to 8 no. flats.

    Granted Full applications New dwelling 6 docs
    Several homes
  • 89 Tettenhall Road Wolverhampton West Midlands

    23/00159/TN Submitted 17 Feb 2023 37m away

    1. Scots Pine - Fell due to poor form and previous branch failures; 2. Yew - Crown lift to provide 2.5 metres clearance above garden level; 3. Yew - Crown lift to provide 2.5 metres clearance above garden level; 4. Yew - Crown lift to provide 2.5 metres clearance above garden level; 5. Laburnum - Remove due to poor form; 6. Laburnum - Remove due to poor form; 7. Birch - Crown lift to provide 2.5 metres clearance over pavement and footpath within property; 8. Beech - Prune to provide a 2.5 metre locus of clearance from any part of the building, and crown reduce the remaining canopy by no more than 2 metres; 9. Lime - Re-pollard to previous pollard point; 10. Lime - Re-pollard to previous pollard point; 11. Lime - Re-pollard to previous pollard point; 12. Pine - Reshape on building side by up to 3 metres to improve visual appearance and provide greater clearance for building.

    Granted Trees 1 doc
  • 89 Tettenhall Road Wolverhampton West Midlands

    24/00789/TN Submitted 23 Jul 2024 37m away

    T2 Beech of the MWA Arboricultural Report Works: Remove (fell) to near ground level and treat stump to inhibit regrowth. TG3 Lime Group (x3) of the MWA Arboricultural Report Works: Re-pollard all 3x trees to original points at approx. 5.0m and re-pollard thereafter on a triennial cycle to maintain at broadly reduced dimensions. Reason: Clay shrinkage subsidence damage at the property.

    Refused Trees 2 docs
  • Weston 21B Larches Lane Wolverhampton West Midlands WV3 9PX

    21/00206/PDPA Submitted 9 Feb 2021 51m away

    Single storey rear extension (6.00m projection beyond the rear wall of the original dwelling, maximum height 3.50m and 2.25m height at the eaves)

    Granted Prior approval Extension 6 docs
    Small domestic
  • 21A Larches Lane Wolverhampton West Midlands WV3 9PX

    24/00914/CPE Submitted 27 Aug 2024 53m away

    Certificate of existing use as a five person house in multiple occupation

    Granted Lawful development 8 docs
  • Best Western Connaught Hotel 40-50 Tettenhall Road Wolverhampton West Midlands WV1 4SW

    08/00413/ADV Submitted 26 Mar 2008 74m away

    Installation of new signage comprising an internally illuminated projecting sign and illuminated individual lettering applied to the fascia.

    Split decision Advertising 6 docs

In Wolverhampton

  • 26/00958/FUL Awaiting decision

    144 Penn Road Wolverhampton West Midlands WV3 0EE

    Change of us from C2 residential care facility to C3 residential dwellinghouse.

    7 Sep 2026 Full applications
  • 26/00370/FUL Refused

    146 Probert Road Wolverhampton West Midlands WV10 6UA

    Proposed single storey rear extension, roof alterations and loft conversion

    14 Apr 2026 Full applications
  • 26/00951/FUL Awaiting decision

    158 Warstones Road Wolverhampton West Midlands WV4 4LH

    First floor side extension.

    4 Sep 2026 Full applications
  • 25/00406/FUL Granted

    Garage Site Behind 6 To 20 Pace Crescent Wolverhampton West Midlands

    Five new dwellings.

    1 Apr 2025 Full applications
  • 26/00621/FUL Granted

    43 Marshall Road Wolverhampton West Midlands WV13 3PB

    Single storey side and rear extension with loft conversion and new dormer. (Amended description)

    4 Jun 2026 Full applications