Skip to content
PlanIndex Get alerts
Menu

Planning application

42 Waterhead Drive Low Hill Wolverhampton West Midlands WV10 8NY

Granted Wolverhampton 06/01416/FUL Full Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey side extension and front canopy

As published by the council, reference 06/01416/FUL

Application record

Reference
06/01416/FUL
Type
Full Application
Status
Decided
Decision
Grant
Received
17 Oct 2006
Validated
13 Nov 2006
Decided
8 Jan 2007
Ward
Fallings Park
Decision by
Delegated Decision
Postcode
WV10 8NY

Timeline

Dates from the published record

  1. 17 Oct 2006

    Received by Wolverhampton

  2. 13 Nov 2006

    Validated

    Checked as complete and ready for consideration.

  3. 8 Jan 2007

    Decision issued: Grant

  4. 6 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 46 Underhill Lane Wolverhampton West Midlands WV10 8NS

    26/00394/PDPA Submitted 20 Apr 2026 102m away

    Single storey rear extension: 6.00m beyond the rear wall of the original dwellinghouse, 3.60m maximum height and 3.10m height at the eaves.

    Granted Prior approval Extension 6 docs
    Small domestic
  • 46 Underhill Lane Wolverhampton West Midlands WV10 8NS

    26/00570/FUL Submitted 22 May 2026 102m away

    Single storey side extension

    Granted Full applications Extension 8 docs
    Small domestic
  • 79 Waterhead Drive Wolverhampton West Midlands WV10 8NU

    24/00248/FUL Submitted 28 Feb 2024 151m away

    Two storey side extension, single storey utility to rear to be re-built to match existing layout.

    Granted Full applications Extension 13 docs
    Small domestic
  • Westcroft Farm Cannock Road Westcroft Staffordshire WV10 8QW

    21/00353/COU Submitted 2 Apr 2021 212m away

    Change of use of farm grassland to horse grazing paddocks (Retrospective)

    Granted Full applications 7 docs
  • Westcroft School Greenacres Avenue Wolverhampton WV10 8NZ

    24/01255/FUL Submitted 25 Nov 2024 243m away

    Infill of courtyard area with new roof over and extension of overspill car park by 10 extra car parking spaces.

    Granted Full applications Extension Roofing 10 docs
  • Wulfrun Rose Nursing Home Underhill Lane Wolverhampton West Midlands WV10 8LP

    22/01551/TPO Submitted 16 Dec 2022 250m away

    13/00013/TPO (T1) - Ash - Reduce lower horizontal limb extending toward adjacent bungalow back to appropriate growing point at approx 1/2 - 2/3 overall length from tips, whilst leaving suitable secondary branches to form reduced canopy. crown clean to remove deadwood, and previously 'stubbed' branches and prune to provide clearance of up to 1.5 metres clearance form top of adjacent lighting column. Crown lift by the removal of secondary branches to ensure a 4 metres clearance over the access drive of the adjacent nursing home. Reason(s): Appropriate maintenance given location of tree. - amended specification agreed on site with Agent on 18th Jan 2023.

    Granted Trees 2 docs

In Wolverhampton

  • 26/00370/FUL Refused

    146 Probert Road Wolverhampton West Midlands WV10 6UA

    Proposed single storey rear extension, roof alterations and loft conversion

    14 Apr 2026 Full applications
  • 25/00406/FUL Granted

    Garage Site Behind 6 To 20 Pace Crescent Wolverhampton West Midlands

    Five new dwellings.

    1 Apr 2025 Full applications
  • 26/00621/FUL Granted

    43 Marshall Road Wolverhampton West Midlands WV13 3PB

    Single storey side and rear extension with loft conversion and new dormer. (Amended description)

    4 Jun 2026 Full applications
  • 26/00536/FUL Granted

    24 Springfield Lane Wolverhampton West Midlands WV10 6PX

    Two storey side extension

    14 May 2026 Full applications
  • 26/00740/FUL Granted

    32 Danescourt Road Wolverhampton West Midlands WV6 9BG

    Single storey rear extension

    6 Jul 2026 Full applications