Skip to content
PlanIndex Get alerts
Menu

Planning application

Land South Of Chertsey Road Bridge Chertsey Road Woking Surrey

Granted Woking TREE/2026/8126

Works: Trees

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

English Oak : WBC Open Spaces - Crown Reduction 3m to good growth, 5.3m clearance over the road, significant deadwood removal. (Works within Basingstoke Canal Conservation Area). Note : permission not required for deadwood.

As published by the council, reference TREE/2026/8126

Application record

Reference
TREE/2026/8126
Status
Decided
Decision
No Objection
Validated
3 Jun 2026
Decided
7 Jul 2026

Site history

Applications at this address on the Woking register

This site has had 2 applications since 2026: 2 approved, 0 refused.

  • TREE/2026/8071 Granted

    Land South Of Chertsey Road Bridge Chertsey Road Woking Surrey

    #770033476 - Oak Crown Reduction (Meters 3m) ~3m reduction to good growth where possible. Aim to rebalance the crown against the lean. Tree overhangs 50mph single carriageway. Deadwood Removal (Degree Moderate) All deadwood over 25mm diameter and hangers. Clean ground vegetation / climbing plant Sever ivy and pull as much as possible. #770033473 - Oak Crown Reduction (Meters 3m) 1-2m reduction of height. 2-3m reduction of spread in all directions, cut to good growth where possible. Deadwood Removal (Degree Moderate) All deadwood over 25mm diameter. Retain the one piece that's becoming welded into the stems. (Works within Basingstoke Canal (East And West) (Permission not required for deadwood)

    Decided 5 May 2026 Trees

Timeline

Dates from the published record

  1. 3 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  2. 7 Jul 2026

    Decision issued: No Objection

  3. 31 Jul 2026

    Added to PlanIndex

What this grant of permission means

Woking granted permission on 7 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Woking's portal will say. Our guide explains the common types.