Planning application
Land South Of Hoe Valley School And East Of Railway Tracks Egley Road Woking Surrey GU22 0NH
Works: Demolition Major scheme
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Redevelopment of the land for the erection of 74 dwellings (37 market dwellings and 37 affordable dwellings) (C3 Use Class) together with vehicular access, public open space, landscaping and Sustainable urban Drainage Systems (SuDS) and other associated works following demolition of the existing gymnastics building (Amended Plans).
As published by the council, reference PLAN/2025/0896
Application record
- Reference
- PLAN/2025/0896
- Type
- Full Planning Application
- Status
- Awaiting decision
- Decision
- Permitted
- Received
- 25 Nov 2025
- Validated
- 25 Nov 2025
- Decided
- 16 Jun 2026
- Ward
- Heathlands
- Postcode
- GU22 0NH
Timeline
Dates from the published record
-
25 Nov 2025
Received by Woking
-
16 Jun 2026
Decision issued: Permitted
-
12 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
197 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Land To The Rear Of 2 Chiltern Close Mayford Woking Surrey GU22 0PL
Large Oaks : Reduce over boundary by up to 2m to suitable growth points. (Works subject to TPO 626/0154/1973)
Granted Trees 5 docs -
Willow Green Hook Hill Lane Mayford Woking Surrey GU22 0PS
Certificate of Proposed Lawful Development for the erection of a single storey rear extension, alterations to fenestration and insertion of 1no rooflight to front (south-east) roof plane.
Granted Lawful development Extension Loft or dormer +1 17 docsSmall domestic -
Land Adjacent To 3 Chiltern Close Mayford Woking Surrey GU22 0PL
3 x Oaks - cut back branches overhanging property by 2m (Works Subject to TPO 626/0154/1973)
Granted Trees 5 docs -
Lisa Hook Hill Lane Mayford Woking Surrey GU22 0PS
Certificate of Proposed Lawful Development for single storey side extensions and rear outbuilding.
Refused Lawful development Extension 7 docsSmall domestic -
Lisa Hook Hill Lane Mayford Woking Surrey GU22 0PS
Certificate of Proposed Lawful Development for single storey side extensions, enlargement of existing rear dormer and rear outbuilding.
Granted Lawful development Extension Loft or dormer 7 docsSmall domestic -
Lisa Hook Hill Lane Mayford Woking Surrey GU22 0PS
85% historically approved · decision due ~5 May
Erection of a one-and-a-half-storey front and side extension and a single-storey rear extension following demolition of existing garage.
Awaiting decision Householder Extension Demolition 13 docsSmall domestic
Other full applications applications
In Woking
-
PLAN/2026/0114 Granted
3 Abbot House Onslow Crescent Woking Surrey GU22 7AX
Proposed loft conversion with rear dormer. Insertion of front and side rooflights.
-
PLAN/2026/0167 Granted
St Edward Orthodox Church Cyprians Avenue Cemetery Pales Brookwood Woking Surrey GU24 0BL
Erection of a single storey side extension to accommodate disabled access and lift.
-
PLAN/2026/0163 Granted
Land Adjacent To White Walls Bracken Close Woking Surrey
Erection of a two-storey detached house.
-
PLAN/2025/0917 Granted
Gorse Hill Hook Heath Road Woking Surrey GU22 0QF
Demolition of existing single storey structure and erection of new two-storey hotel accommodation building (Use Class C1), with associated hard and soft landscaping.
-
PLAN/2026/0230 Granted
Land At Pumping Station Bonners Close Westfield Woking Surrey
Erection of 2no 2-bedroom semi-detached dwellings and associated parking and landscaping.