Planning application
Tamarisk Golf Club Road Woking Surrey GU22 0LS
Works: Demolition Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Construction of 2 x detached 2 storey dwellings with attached double garages and associated landscaping following the demolition of the existing detached 2 storey dwelling and detached garage.
As published by the council, reference PLAN/2025/0805
Application record
- Reference
- PLAN/2025/0805
- Type
- Full Planning Application
- Status
- Awaiting decision
- Decision
- Permitted
- Received
- 12 Nov 2025
- Validated
- 12 Nov 2025
- Decided
- 7 May 2026
- Ward
- Heathlands
- Postcode
- GU22 0LS
Timeline
Dates from the published record
-
12 Nov 2025
Received by Woking
-
7 May 2026
Decision issued: Permitted
-
12 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a planning consultancy registered in Wokingham
23 applications on PlanIndex · across 9 councils · 64% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
38 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
1 Hereford Copse Woking Surrey GU22 0LX
T1 - Oak: Raise canopy by removing 2 x lowest branches. Remove secondary lateral branch back to fork. Reduce remaining upright leader by 2m to leave at 3m. Work required to reduce growth back from roof of property. T2 - Oak: Raise canopy by removing 2 x branches, hanging very low over garden. (Works subject to TPO 626/0076/1964)
Granted Trees 6 docs -
5 High Gardens Hook Heath Woking Surrey GU22 0JN
T1 - Beech Tree: Crown lift approx height of 6m from ground level, there are no substantial low level limbs (Works subject to TPO 626/0076/1964)
Granted Trees 9 docs -
Pembroke Lodge Holly Bank Road Woking Surrey GU22 0JN
Oak tree x 2 : (T1) (large) - Reduce by 2-3 meters leaving 19 meters in height and 5 meters in spread. Outgrown space and letting in light. (T2) - (smaller one) Reduce by 2-3 meters leaving 16 meters in height and 3 meters in spread. Outgrown its space and lack of light. (Works subject to TPO 626/0076/1964).
Granted Trees 8 docs -
Whitelands Fairway Close Woking Surrey GU22 0LT
5 x Scots Pines beside garage - Fell to ground level, too close to property - to prevent future damage to foundation and future damage to property. Replant 5 x Silver Birch within close proximity to above pines once removed. (Works subject to TPO 626/0076/1964).
Refused Trees 6 docs -
Blantyre Hook Heath Avenue Woking Surrey GU22 0HN
Approval of details pursuant to condition 03 (tree protection details) of planning permission ref: PLAN/2022/0983 dated 21.12.2022 (Erection of a part two storey, part first floor, part single storey rear extension and first floor side extension. Partial conversion of garage into habitable space and 1No side rooflight).
Granted Conditions Extension Loft or dormer +1 7 docsSmall domestic -
Comeragh House 1 Comeragh Close Woking Surrey GU22 0LZ
T1 - Oak Tree: Reduce crown back to the previous points by 3-4m off top and 2-3m off sides. Tree is close to and overhanging buildings (Works subject to TPO 626/0076/1964)
Granted Trees 9 docs
Other full applications applications
In Woking
-
PLAN/2026/0114 Granted
3 Abbot House Onslow Crescent Woking Surrey GU22 7AX
Proposed loft conversion with rear dormer. Insertion of front and side rooflights.
-
PLAN/2026/0167 Granted
St Edward Orthodox Church Cyprians Avenue Cemetery Pales Brookwood Woking Surrey GU24 0BL
Erection of a single storey side extension to accommodate disabled access and lift.
-
PLAN/2026/0163 Granted
Land Adjacent To White Walls Bracken Close Woking Surrey
Erection of a two-storey detached house.
-
PLAN/2025/0917 Granted
Gorse Hill Hook Heath Road Woking Surrey GU22 0QF
Demolition of existing single storey structure and erection of new two-storey hotel accommodation building (Use Class C1), with associated hard and soft landscaping.
-
PLAN/2026/0230 Granted
Land At Pumping Station Bonners Close Westfield Woking Surrey
Erection of 2no 2-bedroom semi-detached dwellings and associated parking and landscaping.