Planning application
Unit 16 Kestrel Way Woking Surrey GU21 3BA
Works: Loft or dormer Roofing Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Alterations to existing north elevation including removal of windows, reconfiguration and replacement of rooflights, replacement of existing entrance and loading bay doors, respraying of cladding, removal of the existing roof and installation of a new roof and associated works.
As published by the council, reference PLAN/2025/0791
Application record
- Reference
- PLAN/2025/0791
- Type
- Full Planning Application
- Status
- Decided
- Decision
- Permitted
- Received
- 16 Oct 2025
- Validated
- 16 Oct 2025
- Decided
- 9 Dec 2025
- Ward
- Horsell
- Decision by
- Delegated
- Postcode
- GU21 3BA
Timeline
Dates from the published record
-
16 Oct 2025
Received by Woking
-
9 Dec 2025
Decision issued: Permitted
-
12 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in London
1,743 applications on PlanIndex · across 173 councils · 92% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Land To The North Of Cedar Court Sythwood Woking Surrey
English Oak: Cut back to boundary by 2.5m to reduce overhang (Works subject to TPO/0046/2008)
Granted Trees 6 docs -
2 Birch Cottages Horsell Birch Horsell Woking Surrey GU21 4XB
Gleditsia - Crown lift to 7.5 metres from ground level. Liriodendron - Crown lift to 6 metres from ground level. Works required to open up the garden which is now overpoweringly shaded by very mature trees. (Works within Horsell Birch Conservation Area).
Granted Trees 9 docs -
4 The Orchard Bullbeggars Lane Horsell Woking Surrey GU21 4SH
T1- Oak Tree: Reduce by approx. 2.5-3m. Remove deadwood. (Permission not required for deadwood) (Works subject to TPO 626/0545/1998)
Granted Trees 7 docs -
The Salvation Army Sythwood Woking Surrey GU21 3BE
(T1) : Oak Tree - Remove lowest branches (NW to SE face; overhanging allotments) to lift canopy to 6m. Branches less than 50mm diameter (T2) : Oak Tree - Remove lowest NE limb (c. 50mm diameter) overhanging allotments. (T3) : Oak Tree - Remove lowest secondary limb overhanging allotments. Reduce branches above by upto 3m (upto a height of approx 15m). (T4) : Oak Tree - Crown lift to approx 8m (cut back to suitable growth points) Reduce branches above by upto 3m (upto a height of approx 15m). (Works subject to TPO/0028/2007).
Granted Trees 7 docs -
2 High Street Horsell Woking Surrey GU21 4XA
86% historically approved · decision due ~15 Sep
Mature Cherry tree - Fell to ground level and replace with similar Cherry at location (B). (Works within Horsell Birch Conservation Area).
Decided Trees -
Digital Realty Unit 21 Kestrel Way Woking Surrey GU21 3BA
Non Material Amendment to planning permission PLAN/2022/0347 for The demolition of an existing redundant single-storey brick gate house and replacement with fully accessible, step free landscaped access, including planting, new security fencing, altered parking arrangements and a new lighting scheme.
Refused Amendments Demolition 15 docsSmall domestic
Other full applications applications
In Woking
-
PLAN/2026/0114 Granted
3 Abbot House Onslow Crescent Woking Surrey GU22 7AX
Proposed loft conversion with rear dormer. Insertion of front and side rooflights.
-
PLAN/2026/0167 Granted
St Edward Orthodox Church Cyprians Avenue Cemetery Pales Brookwood Woking Surrey GU24 0BL
Erection of a single storey side extension to accommodate disabled access and lift.
-
PLAN/2026/0163 Granted
Land Adjacent To White Walls Bracken Close Woking Surrey
Erection of a two-storey detached house.
-
PLAN/2025/0917 Granted
Gorse Hill Hook Heath Road Woking Surrey GU22 0QF
Demolition of existing single storey structure and erection of new two-storey hotel accommodation building (Use Class C1), with associated hard and soft landscaping.
-
PLAN/2026/0230 Granted
Land At Pumping Station Bonners Close Westfield Woking Surrey
Erection of 2no 2-bedroom semi-detached dwellings and associated parking and landscaping.