Planning application
Horsell Rise Cottage Horsell Rise Horsell Woking Surrey GU21 4AY
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of front entry gates with brick pillars and metal railing fence and alterations to existing vehicular access.
As published by the council, reference PLAN/2025/0755
Application record
- Reference
- PLAN/2025/0755
- Type
- Full Planning Application
- Status
- Decided
- Decision
- Permitted
- Received
- 22 Oct 2025
- Validated
- 22 Oct 2025
- Decided
- 16 Dec 2025
- Ward
- Horsell
- Decision by
- Delegated
- Postcode
- GU21 4AY
Timeline
Dates from the published record
-
22 Oct 2025
Received by Woking
-
16 Dec 2025
Decision issued: Permitted
-
12 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Bingley
46 applications on PlanIndex · across 4 councils · 79% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Horsell Rise Cottage Horsell Rise Horsell Woking Surrey GU21 4AY
Variation of condition 2 (approved Plans) and condition 3 (materials) of Planning Permission PLAN/2025/0755 (Erection of front entry gates with brick pillars and metal railing fence and alterations to existing vehicular access) to change the materials of the piers and boundary walls from brick to render
Granted Conditions 9 docsSmall domestic -
Horsell Rise Cottage Horsell Rise Horsell Woking Surrey GU21 4AY
Variation of Condition 2 (Approved Plans) of Planning Permission PLAN/2024/0548 (The demolition of a detached, two-storey dwelling house, followed by the erection of a detached, three-storey dwelling house, extensions to two existing detached outbuildings including installation 3x air source heat pumps, 24x ground-mounted solar panels and proposed widening of the dropped kerb. (Amended description)) to amend the position of the extension to one of the outbuildings and 3x air source heat pumps.
Granted Conditions Extension Demolition 13 docsSmall domestic -
Horsell Rise Cottage Horsell Rise Horsell Woking Surrey GU21 4AY
Approval of details pursuant to condition 6 (external lighting) of planning permission PLAN/2024/0548 dated 26.11.2024 for The demolition of a detached, two-storey dwelling house, followed by the erection of a detached, three-storey dwelling house, extensions to two existing detached outbuildings including installation 3x air source heat pumps, 24x ground-mounted solar panels and proposed widening of the dropped kerb. (Amended description).
Granted Conditions Extension Demolition 8 docsSmall domestic -
Horsell Rise Cottage Horsell Rise Horsell Woking Surrey GU21 4AY
The demolition of a detached, two-storey dwelling house, followed by the erection of a detached, three-storey dwelling house, extensions to two existing detached outbuildings including installation 3x air source heat pumps, 24x ground-mounted solar panels and proposed widening of the dropped kerb. (Amended description).
Granted Full applications Extension Demolition 29 docsSmall domestic -
22 Fenns Way Horsell Woking Surrey GU21 4BJ
Certificate of Proposed Lawful Development for erection of a front porch.
Refused Lawful development Extension 7 docsSmall domestic -
9 Fenns Way Horsell Woking Surrey GU21 4BJ
T1 - Willow: Fell to ground level and remove all arisings, grind out stump. Basal decay and severe decay throughout. (Works subject to TPO 626/0035/1963)
Granted Trees 7 docs
Other full applications applications
In Woking
-
PLAN/2026/0114 Granted
3 Abbot House Onslow Crescent Woking Surrey GU22 7AX
Proposed loft conversion with rear dormer. Insertion of front and side rooflights.
-
PLAN/2026/0167 Granted
St Edward Orthodox Church Cyprians Avenue Cemetery Pales Brookwood Woking Surrey GU24 0BL
Erection of a single storey side extension to accommodate disabled access and lift.
-
PLAN/2026/0163 Granted
Land Adjacent To White Walls Bracken Close Woking Surrey
Erection of a two-storey detached house.
-
PLAN/2025/0917 Granted
Gorse Hill Hook Heath Road Woking Surrey GU22 0QF
Demolition of existing single storey structure and erection of new two-storey hotel accommodation building (Use Class C1), with associated hard and soft landscaping.
-
PLAN/2026/0230 Granted
Land At Pumping Station Bonners Close Westfield Woking Surrey
Erection of 2no 2-bedroom semi-detached dwellings and associated parking and landscaping.