Planning application

Morrisons 82 Goldsworth Road Woking Surrey GU21 6LJ

Granted Woking PLAN/2024/0459 Full Planning Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Creation of an electric vehicle (EV) charging zone including the erection of a canopy, substation, LV enclosure and associated works.

As published by the council, reference PLAN/2024/0459

Application record

Reference
PLAN/2024/0459
Type
Full Planning Application
Status
Decided
Decision
Permitted
Received
3 Jul 2024
Validated
3 Jul 2024
Decided
6 Dec 2024
Ward
Canalside
Decision by
Delegated
Postcode
GU21 6LJ

Timeline

Dates from the published record

  1. 3 Jul 2024

    Received by Woking

  2. 6 Dec 2024

    Decision issued: Permitted

  3. 21 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Farnham

433 applications on PlanIndex · across 90 councils · 95% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

20 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Morrisons 82 Goldsworth Road Woking Surrey GU21 6LJ

    COND/2026/0033 Submitted 17 Apr 2026 10m away

    Approval of details pursuant to conditions 05 (Details of floodlighting) and 06 (Details of a scheme for disposing of surface water by means of a sustainable drainage system) of planning permission PLAN/2025/0027, dated 13.05.2026 for the Installation of 3no jet wash bays and associated infrastructure including plant room. Installation of 2no air water and vac units and associated relocation of existing trolley bay (amended description and location plan).

    Granted Conditions 18 docs
  • 62 Kingsway Woking Surrey GU21 6NT

    PLAN/2025/0795 Submitted 17 Oct 2025 76m away

    Erection of a single storey rear extension.

    Granted Householder Extension 14 docs
    Small domestic
  • Morrisons 82 Goldsworth Road Woking Surrey GU21 6LJ

    PLAN/2025/0753 Submitted 29 Sep 2025 106m away

    Retrospective application for partial change of use of existing car park to water filling station including the erection of the structure.

    Granted Full applications 7 docs
  • 18 Kingsway Woking Surrey GU21 6NU

    PLAN/2025/0696 Submitted 2 Sep 2025 112m away

    Erection of a two storey and part first floor rear extension and alterations to existing dormer window. Proposed conversion of garage into habitable accommodation.

    Granted Householder Extension Loft or dormer +1 14 docs
    Domestic
  • 84 Kingsway Woking Surrey GU21 6NS

    PLAN/2023/0039 Submitted 16 Jan 2023 173m away

    Proposed part garage conversion, replacement roof (ridge increase by 1.2m) and fenestration changes.

    Granted Householder Roofing Windows or glazing 10 docs
    Small domestic
  • Speldhurst Kingsway Avenue Woking Surrey GU21 6NX

    PLAN/2026/0456 Submitted 23 Jun 2026 189m away

    72% historically approved · decision due ~18 Aug

    Certificate of Proposed Lawful Development for a hip-to-gable roof extension with rear dormer window, insertion of front roof light, removal of chimney and insertion of a new side window.

    Awaiting decision Lawful development Extension Loft or dormer +1 4 docs

In Woking

  • PLAN/2026/0114 Granted

    3 Abbot House Onslow Crescent Woking Surrey GU22 7AX

    Proposed loft conversion with rear dormer. Insertion of front and side rooflights.

    24 Feb 2026 Full applications
  • PLAN/2026/0167 Granted

    St Edward Orthodox Church Cyprians Avenue Cemetery Pales Brookwood Woking Surrey GU24 0BL

    Erection of a single storey side extension to accommodate disabled access and lift.

    10 Mar 2026 Full applications
  • PLAN/2026/0163 Granted

    Land Adjacent To White Walls Bracken Close Woking Surrey

    Erection of a two-storey detached house.

    10 Mar 2026 Full applications
  • PLAN/2025/0917 Granted

    Gorse Hill Hook Heath Road Woking Surrey GU22 0QF

    Demolition of existing single storey structure and erection of new two-storey hotel accommodation building (Use Class C1), with associated hard and soft landscaping.

    23 Dec 2025 Full applications
  • PLAN/2026/0230 Granted

    Land At Pumping Station Bonners Close Westfield Woking Surrey

    Erection of 2no 2-bedroom semi-detached dwellings and associated parking and landscaping.

    1 May 2026 Full applications