Planning application
Monks Wood Monks Close Ascot SL5 9BA
Works: New dwelling Demolition Domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Construction of 2 no. detached dwellings (self build), widening of the existing access, landscaping and hardstanding following demolition of existing dwelling and outbuildings.
As published by the council, reference 26/01799/FULL
Application record
- Reference
- 26/01799/FULL
- Type
- Full
- Status
- Awaiting decision
- Received
- 22 Jul 2026
- Validated
- 5 Aug 2026
- Ward
- Ascot & Sunninghill
- Parish
- Sunninghill And Ascot Parish
- Postcode
- SL5 9BA
Timeline
Dates from the published record
-
22 Jul 2026
Received by Windsor and Maidenhead
-
5 Aug 2026
Validated
Checked as complete and ready for consideration.
-
16 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 30 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Windsor and Maidenhead took a median of 55 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
54 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Windsor and Maidenhead for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Kerrywood Horse Gate Ride Ascot SL5 9LS
(T1) Silver Birch - Fell . (T8) Silver Birch - Fell. (TPO 13 of 2015)
Granted Trees 9 docs -
The Belfry Monks Walk Ascot SL5 9AZ
(T1) Cherry tree - Remove 2 branches which are rubbing against telegraph pole, approximately 1 metre of each branch will be removed. (TPO 50 of 1997).
Granted Trees 9 docs -
Cardinals Ride Monks Walk Ascot SL5 9AZ
Two storey front extension, part single/part two storey part first floor side/rear extension, first floor rear balcony with under croft, new roof with front and rear dormers, new parapet wall to front, both sides and rear elevation, alterations to existing chimney to include increased height, alterations to fenestration to include x2 first floor rear Juliette balconies and to finishes and materials following part demolition of existing front elevation.
Granted Full applications Extension Loft or dormer +3 16 docs -
Cardinals Ride Monks Walk Ascot SL5 9AZ
Two storey front extension with new entrance canopy, part single part two storey part first floor side/rear extension, new first floor rear balcony with undercroft, alterations to the main roof to include a new parapet wall, x2 front dormers, x3 rear dormers and alterations to fenestration and to the existing chimney.
Refused Full applications Extension Loft or dormer +1 25 docs -
Cardinals Ride Monks Walk Ascot SL5 9AZ
Replacement dwelling ((self-build) (Part Retropective))
Granted Full applications New dwelling 34 docsDomestic -
Cardinals Ride Monks Walk Ascot SL5 9AZ
Details required by Condition 3 (Materials); Condition 5 (PV Panels); Condition 6 (Air Sourced Heat Pump); Condition 7 (Sustainable drainage); Condition 8 (Landscaping); Condition 11 (Biodiversity Enhancements) and Condition 12 (External Lighting) of planning permission 25/02123/FULL for a replacement dwelling (self-build). (Part Retropective).
Granted Conditions New dwelling 19 docsDomestic
Other full applications applications
In Windsor and Maidenhead
-
26/01628/FULL Granted
25 Bannard Road Maidenhead SL6 4NP
Single storey rear extension following the demolition of the existing conservatory.
-
26/01384/FULL Granted
Stoney Vere Farm House Butchers Lane White Waltham Maidenhead SL6 3SD
Single storey side extension
-
26/01674/FULL Granted
50 Welley Road Wraysbury Staines TW19 5DJ
Detached annexe to be used ancillary to the main dwelling.
-
26/01312/FULL Refused
16 Whyteladyes Lane Cookham Maidenhead SL6 9NA
Hip to gable, 1no. front dormer, 1no. rear dormer and alterations to fenestration and relocation of PV panels.
-
26/01379/FULL Granted
Lotus Cottage Holyport Street Holyport Maidenhead SL6 2JR
Part single part two storey part first floor rear/side extension and alterations to fenestration.