Planning application
136 Coppermill Road Wraysbury Staines TW19 5NR
Works: Demolition Small domestic
Read from the description, not a valuation. How we read the register
Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.
Proposal
1no. outbuilding ancillary to the main dwelling, hardstanding and boundary wall following demolition of existing element (retrospective).
As published by the council, reference 26/00024/FULL
Application record
- Reference
- 26/00024/FULL
- Type
- Full
- Status
- Decided
- Decision
- Application Withdrawn
- Received
- 7 Jan 2026
- Validated
- 19 Jan 2026
- Decided
- 10 Mar 2026
- Ward
- Datchet Horton And Wraysbury
- Parish
- Horton Parish
- Decision by
- Delegated
- Postcode
- TW19 5NR
Timeline
Dates from the published record
-
7 Jan 2026
Received by Windsor and Maidenhead
-
19 Jan 2026
Validated
Checked as complete and ready for consideration.
-
10 Mar 2026
Decision issued: Application Withdrawn
-
11 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat withdrawal means
The process from here
The applicant withdrew this application before the council decided it, so it carries no planning weight and no fee refund is automatic. Withdrawal often follows officer feedback that a refusal was likely.
The applicant is free to submit a revised application at any time, and many withdrawn schemes return in amended form, so the site is worth watching if the proposal affected you.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
144 Coppermill Road Wraysbury Staines TW19 5NR
Single storey rear extension no greater than 5m in depth, 4m high with an eaves height of 2.829m.
Granted Prior approval Extension 13 docsSmall domestic -
-
124 Coppermill Road Wraysbury Staines TW19 5NR
Detached garage ancillary to the main dwelling.
Refused Full applications 13 docsDomestic -
120 Coppermill Road Wraysbury Staines TW19 5NR
Part first floor rear extension.
Granted Full applications Extension 9 docs -
124 Coppermill Road Wraysbury Staines TW19 5NR
New dropped kerb with vehicular entrance gates and x1 detached garage.
Withdrawn Full applications 6 docs -
169 Coppermill Road Wraysbury Staines TW19 5NX
Single storey side/rear extension and alterations to fenestration, following demolition of the existing detached garage.
Granted Full applications Extension Demolition +1 11 docsSmall domestic
Other full applications applications
In Windsor and Maidenhead
-
26/01628/FULL Granted
25 Bannard Road Maidenhead SL6 4NP
Single storey rear extension following the demolition of the existing conservatory.
-
26/01384/FULL Granted
Stoney Vere Farm House Butchers Lane White Waltham Maidenhead SL6 3SD
Single storey side extension
-
26/01674/FULL Granted
50 Welley Road Wraysbury Staines TW19 5DJ
Detached annexe to be used ancillary to the main dwelling.
-
26/01312/FULL Refused
16 Whyteladyes Lane Cookham Maidenhead SL6 9NA
Hip to gable, 1no. front dormer, 1no. rear dormer and alterations to fenestration and relocation of PV panels.
-
26/01379/FULL Granted
Lotus Cottage Holyport Street Holyport Maidenhead SL6 2JR
Part single part two storey part first floor rear/side extension and alterations to fenestration.