Planning application
15 Pinecote Drive Sunningdale Ascot SL5 9PS
Works: Extension Windows or glazing Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Relocation of the front entrance, two storey front extension with new canopy, single storey side/rear extension, single storey rear extension, replacement bay window, 1no. rear first floor Juliet balcony, alterations to fenestration and enlargement of the existing terrace following the removal of the existing elements.
As published by the council, reference 25/03387/FULL
Application record
- Reference
- 25/03387/FULL
- Type
- Full
- Status
- Decided
- Decision
- Application Permitted
- Received
- 23 Dec 2025
- Validated
- 23 Dec 2025
- Decided
- 3 Mar 2026
- Ward
- Sunningdale And Cheapside
- Parish
- Sunningdale Parish
- Decision by
- Delegated
- Postcode
- SL5 9PS
Timeline
Dates from the published record
-
23 Dec 2025
Received by Windsor and Maidenhead
-
3 Mar 2026
Decision issued: Application Permitted
-
11 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
16 Pinecote Drive Sunningdale Ascot SL5 9PS
Single storey rear extension, part two storey part first floor front/side extension and alterations to fenestration.
Refused Full applications Extension Windows or glazing 14 docsSmall domestic -
10 Hamilton Drive Sunningdale Ascot SL5 9PP
Details required by Condition (10) (Sustainable Construction)) of planning permission (25/02723/FULL) for (1no. replacement detached dwelling with associated parking, landscaping and EV charger following the demolition of the existing dwelling. (Self Build)).
Granted Conditions New dwelling Demolition 6 docsDomestic -
10 Hamilton Drive Sunningdale Ascot SL5 9PP
1no. replacement detached dwelling with associated parking, landscaping and EV charger following the demolition of the existing dwelling. (Self Build).
Granted Full applications New dwelling Demolition 48 docsDomestic -
8 And 9 Pinecote Drive Sunningdale Ascot
G1(A) Beech - reduce overall by 2m to leave a finished height of 15m and finished spread of 8m and remove crossing branches. Raise canopy over road by 5m; G1 (B) Liquidambar - (marked as Tulip Tree on TPO document) reduce overall by 3m to leave finished height of 14m and finished spread of 6m; G1 (C) Red Oak - reduce overall by 3m to leave finished height of 14m and finished spread of 10m; G2 (A) Beech - reduce overall by 2m to leave finished height of 17m and finished spread of 13m; G2 (B) Oak - reduce east sector towards house by 2m to leave a finished spread of 7m; (T2) Oak - reduce overall by 2.5m to leave finished height of 12m and finished spread of 7m; (T3) Horse Chestnut - reduce overall by 3m to leave finished height of 15m and finished spread of 9m and (T4) Horse Chestnut - reduce overall by 3m to leave finished height of 15m and finished spread of 9m.(116/2002/TPO).
Split decision Trees 7 docs -
12 Pinecote Drive Sunningdale Ascot SL5 9PS
Single storey rear extension following demolition of existing rear conservatory.
Granted Full applications Extension Demolition 17 docsSmall domestic -
12 Pinecote Drive Sunningdale Ascot SL5 9PS
Enlargement of existing terrace on first floor, part raising of the ridge, alterations to roof to include enlargement of the existing roofspace, 2no. rear Juliet balconies and alterations to fenestration.
Refused Full applications Windows or glazing 13 docs
Other full applications applications
In Windsor and Maidenhead
-
26/01628/FULL Granted
25 Bannard Road Maidenhead SL6 4NP
Single storey rear extension following the demolition of the existing conservatory.
-
26/01384/FULL Granted
Stoney Vere Farm House Butchers Lane White Waltham Maidenhead SL6 3SD
Single storey side extension
-
26/01674/FULL Granted
50 Welley Road Wraysbury Staines TW19 5DJ
Detached annexe to be used ancillary to the main dwelling.
-
26/01312/FULL Refused
16 Whyteladyes Lane Cookham Maidenhead SL6 9NA
Hip to gable, 1no. front dormer, 1no. rear dormer and alterations to fenestration and relocation of PV panels.
-
26/01379/FULL Granted
Lotus Cottage Holyport Street Holyport Maidenhead SL6 2JR
Part single part two storey part first floor rear/side extension and alterations to fenestration.