Planning application
93 And 95 And Land At 93 And 95 Stompits Road Holyport Maidenhead
Works: Extension Demolition Several homes
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
2no. dwellings following the demolition of the existing side extensions.
As published by the council, reference 25/02699/PIP
Application record
- Reference
- 25/02699/PIP
- Type
- Permission in Principle
- Status
- Decided
- Decision
- Granted As published: Application Permitted
- Received
- 9 Oct 2025
- Validated
- 17 Oct 2025
- Decided
- 20 Nov 2025
- Ward
- Bray
- Parish
- Bray Parish
- Decision by
- Delegated
Timeline
Dates from the published record
-
9 Oct 2025
Received by Windsor and Maidenhead
-
17 Oct 2025
Validated
Checked as complete and ready for consideration.
-
20 Nov 2025
Decision issued: Application Permitted
-
11 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Windsor and Maidenhead granted permission on 20 November 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
95 Stompits Road Holyport Maidenhead SL6 2LD
Single storey rear extension no greater than 6m in depth, 3.3m high with an eaves height of 2.9m.
Refused Prior approval Extension 11 docsSmall domestic -
95 Stompits Road Holyport Maidenhead SL6 2LD
1 no. front dormer to facilitate a loft conversion
Granted Full applications Loft or dormer 11 docs -
95 Stompits Road Holyport Maidenhead SL6 2LD
Single storey rear extension no greater than 6m in depth, 4m high with an eaves height of 3m.
Refused Prior approval Extension 8 docsSmall domestic -
93 Stompits Road Holyport Maidenhead SL6 2LD
Part single, part two storey rear extension, 1no. front dormer to facilitate a loft conversion and alterations to fenestration following the demolition of the existing element.
Granted Full applications Extension Loft or dormer +2 13 docs -
93 Stompits Road Holyport Maidenhead SL6 2LD
Single storey rear extension no greater than 6.00m in depth, 2.8m high with an eaves height of 2.5m.
Granted Prior approval Extension 11 docsSmall domestic -
93 Stompits Road Holyport Maidenhead SL6 2LD
Single storey rear extension no greater than 6.00m in depth, 2.99m high with an eaves height of 2.95m.
Refused Prior approval Extension 9 docsSmall domestic
Other outline applications
In Windsor and Maidenhead
-
26/02453/PIP Awaiting decision
Wych Elms Oakley Green Road Oakley Green Windsor SL4 4QF
Erection of dwellinghouse.
-
26/02369/EIASCR Awaiting decision
Land On The East Side of Royal Windsor Way Eton Windsor SL4 6DU
Screening Opinion from the Council under Regulation 6 of the Environmental Impact Assessment Regulations 2017 ("the EIA Regulations"), to confirm whether or not there is a requirement for an Environmental Impact Assessment ("EIA") in relation to the Construction and operation of an agri-photovoltaics facility up to 5 MWp capacity with associated works, equipment and infrastructure.
-
26/01966/PIP Refused
Snapper Holyport Road Maidenhead SL6 2HA
3 no. dwellings with landscaping and hardstanding following demolition of existing dwelling
-
26/02219/OUT Awaiting decision
Land Adjacent To Morland House Hungerford Lane Shurlock Row Reading
Outline application for Access only to be considered at this stage with all other matters to be reserved for the construction of 8 no. dwellings.
-
26/01442/EIASCO Decided
Horton Quarry And Landfill Horton Road Horton Slough
EIA Scoping Opinion Request letter and supporting EIA Scoping Report under Regulation 15 of The Town and Country Planning (Environmental Impact Assessment) Regulations 2017 in respect for further development of Horton Quarry and Landfill.