Planning application
Almora Station Road Cookham Maidenhead SL6 9BU
Works: Extension Demolition Windows or glazing Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Details required by Condition 4 (Biodiversity Enhancements) of planning permission 24/01906/FULL for a Single storey side/rear extension and alterations to fenestration following the demolition of the existing elements.
As published by the council, reference 24/02966/CONDIT
Application record
- Reference
- 24/02966/CONDIT
- Type
- Discharge of Condition
- Status
- Decided
- Decision
- Granted As published: Approve Discharge of Condition
- Received
- 4 Dec 2024
- Validated
- 4 Dec 2024
- Decided
- 22 Jan 2025
- Ward
- Bisham And Cookham
- Parish
- Cookham Parish
- Decision by
- Delegated
- Postcode
- SL6 9BU
Site history
Applications at this address on the Windsor and Maidenhead register
This site has had 3 applications since 2024: 2 approved, 1 refused.
-
24/02805/CPD Granted
Almora Station Road Cookham Maidenhead SL6 9BU
Certificate of lawfulness to determine whether the proposed hip to gable roof alteration, 2 no. front rooflights and 1 no. rear dormer is lawful.
-
24/02392/CPD Refused
Almora Station Road Cookham Maidenhead SL6 9BU
Certificate of lawfulness to determine whether the proposed hip to gable roof alteration, 2 no. front rooflights and 1 no. rear dormer to facilitate a loft conversion is lawful.
Timeline
Dates from the published record
-
4 Dec 2024
Received by Windsor and Maidenhead
-
22 Jan 2025
Decision issued: Approve Discharge of Condition
-
4 Oct 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Windsor and Maidenhead granted permission on 22 January 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Almora Station Road Cookham Maidenhead SL6 9BU
Certificate of lawfulness to determine whether the proposed hip to gable roof alteration, 2 no. front rooflights and 1 no. rear dormer is lawful.
Granted Lawful development Loft or dormer 8 docs -
Almora Station Road Cookham Maidenhead SL6 9BU
Certificate of lawfulness to determine whether the proposed hip to gable roof alteration, 2 no. front rooflights and 1 no. rear dormer to facilitate a loft conversion is lawful.
Refused Lawful development Loft or dormer 8 docs -
Maple Cottage Station Road Cookham Maidenhead SL6 9BU
Garage conversion.
Granted Full applications 13 docs -
Westleigh Station Road Cookham Maidenhead SL6 9BU
Single storey side/rear extension following the demolition of the existing conservatory.
Granted Full applications Extension Demolition 11 docsSmall domestic -
4 Hedsor View Cottages Station Road Cookham Maidenhead SL6 9BX
Single storey side/rear extension no greater than 3.52m in depth, 3.30m high with an eaves height of 2.70m.
Granted Prior approval Extension 10 docsSmall domestic -
Land Rear of Station Road And At Poundfield Pound Field Open Space Poundfield Lane Cookham Maidenhead
T1 Species unknown - remove all overhanging branches back to boundary line.
Granted Trees 7 docs
Other condition discharge and variation applications
In Windsor and Maidenhead
-
26/02463/CONDIT Awaiting decision
Land Adjacent To 4 Block D Cavalry Crescent Windsor
Details required by Condition 2 (Contaminated Land) of planning permission 23/01817/FULL for 2no. three bedroom dwellings with associated parking and landscaping following the demolition of the existing garage block.
-
26/02232/CONDIT Granted
Riverside Gibraltar Lane Cookham Maidenhead SL6 9TR
Details required by Condition 3 (Bat Licence) of planning permission 23/03099/FULL for the enlargement of existing lower ground floor, two storey front extension with front gable, single storey rear extension with balustrade, 2no. proposed rear dormers, , 3no. chimneys, raised terrace with balustrade, steps and conversion of existing garage to an annex ancillary to main dwelling with new roof, alterations to fenestration and external finishes, replacement garage, new EV charger, hardstanding, landscaping, retaining wall and boundary treatment to front, following demolition of existing elements.
-
26/02217/CONDIT Granted
Land South of Kimbers Lane Maidenhead
Details required by Condition 25 (Bat Licence confirmation) of planning permission 24/02786/FULL for a Full planning application for 225 dwellings together with access, landscaping, open space, parking and associated infrastructure.
-
26/02209/CONDIT Granted
Southleigh & Willianns High Street Cookham Maidenhead
Details required by Condition 4 (Roof tiles) and 8 (Biodiversity enhancements) of planning permission 25/03339/FULL for a Two storey rear extensions with 1no. Juliet balcony. A loft conversion with 2no. rear rooflights to Southleigh.
-
26/02455/CONDIT Awaiting decision
Bisham Abbey Bisham Village Marlow Road Bisham Marlow SL7 1RR
Details required by Condition 2 (Ecology) of listed building consent 26/01697/LBC for roof repairs including renewal of the lead coverings to Roofs O1, O2 and O3, replacement of the modern Roof M with a new lead roof, localised repairs to other lead and felt roofs, and replacement of defective clay roof tiles. Localised repairs to masonry, windows, joinery, rainwater goods and soil pipes. Replacement of the external fire escape stair and installation of new roof access hatches and permanent mansafe systems to facilitate future inspection and maintenance.