Skip to content
PlanIndex Get alerts
Menu

Planning application

Copper Beech House 37A Llanvair Drive Ascot SL5 9LW

Granted Windsor and Maidenhead 24/01971/FULL Full

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Part garage conversion, single storey rear extension and new raised patio with steps.

As published by the council, reference 24/01971/FULL

Application record

Reference
24/01971/FULL
Type
Full
Status
Decided
Decision
Granted As published: Application Permitted
Received
14 Aug 2024
Validated
14 Aug 2024
Decided
9 Oct 2024
Ward
Ascot & Sunninghill
Parish
Sunninghill And Ascot Parish
Decision by
Delegated
Postcode
SL5 9LW

Site history

Applications at this address on the Windsor and Maidenhead register

This site has had 3 applications since 2022: 2 approved, 1 refused.

  • 23/02531/TPO Granted

    Copper Beech House 37A Llanvair Drive Ascot SL5 9LW

    (T1) Cedar - fell to ground level leaving stump (011/2014/TPO)

    Decided 14 Nov 2023 Trees
  • 22/01508/FULL Refused

    Copper Beech House 37A Llanvair Drive Ascot SL5 9LW

    Part garage conversion, single storey rear extension, rear raised terrace and detached double garage.

    Decided 25 Aug 2022 Full applications

Timeline

Dates from the published record

  1. 14 Aug 2024

    Received by Windsor and Maidenhead

  2. 9 Oct 2024

    Decision issued: Application Permitted

  3. 8 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

19 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Windsor and Maidenhead granted permission on 9 October 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Copper Beech House 37A Llanvair Drive Ascot SL5 9LW

    22/01508/FULL Submitted 6 Jun 2022 50 yards away

    Part garage conversion, single storey rear extension, rear raised terrace and detached double garage.

    Refused Full applications Extension 14 docs
    Small domestic
  • 35 Llanvair Drive Ascot SL5 9HS

    21/02926/FULL Submitted 30 Sep 2021 50 yards away

    New entrance gates and piers, enlargement of the existing rear patio, new entrance canopy, single storey front/side extension, two storey side/rear extension, first floor front extension, x3 front rooflights, x2 side rooflights to both side elevations, x2 rear gables with juliet balconies and alterations to fenestration and to external finishes.

    Granted Full applications Extension Loft or dormer +1 32 docs
    Small domestic
  • Copper Beech House 37A Llanvair Drive Ascot SL5 9LW

    23/02531/TPO Submitted 12 Oct 2023 50 yards away

    (T1) Cedar - fell to ground level leaving stump (011/2014/TPO)

    Granted Trees 7 docs
  • 35 Llanvair Drive Ascot SL5 9HS

    22/02504/VAR Submitted 13 Sep 2022 50 yards away

    Variation (under Section 73) of Condition 5 (Approved Plans) to substitute those plans approved under 21/02926/FULL for a new entrance gates and piers, enlargement of the existing rear patio, new entrance canopy, single storey front/side extension, two storey side/rear extension, first floor front extension, x3 front rooflights, x2 side rooflights to both side elevations, x2 rear gables with juliet balconies and alterations to fenestration and to external finishes. with amended plans.

    Granted Amendments Extension Loft or dormer +1 28 docs
    Small domestic
  • 37 Llanvair Drive Ascot SL5 9LW

    22/02246/TPO Submitted 15 Aug 2022 50 yards away

    T2 - Turkey Oak - fell (011/2014/TPO)

    Granted Trees 9 docs
  • 37 Llanvair Drive Ascot SL5 9LW

    22/01686/TPO Submitted 20 Jun 2022 50 yards away

    T1 - Turkey Oak - reduce canopy overall by 2.5m to give a final height of 20m and spread of 8m. (11/2014/TPO)

    Split decision Trees 8 docs

In Windsor and Maidenhead

  • 26/02029/FULL Granted

    5 Kimber Close Windsor SL4 4BJ

    Single storey rear extension.

    Received 17 Aug, published by the council 27 Aug 2026 Full applications
  • 26/01955/FULL Granted

    2 Holmlea Road Datchet Slough SL3 9HQ

    Change of use from a dwellinghouse (Use Class C3) to a children's home (Use Class C2) for up to three children, together with conversion of the garage to an office with an en-suite facilities and alterations to fenestration.

    Received 7 Aug, published by the council 27 Aug 2026 Full applications
  • 26/01121/FULL Granted

    Zain House 15 Wilton Crescent Windsor SL4 4YJ

    Single storey side/front extension, first floor extension over existing side element with 1no. Juliet balcony and 1no. Juliet balcony to existing rear elevation.

    Received 6 May, published by the council 11 Aug 2026 Full applications
  • 26/01977/FULL Granted

    9 St Marks Place Windsor SL4 3BG

    Garage conversion and alterations to fenestration.

    Received 11 Aug, published by the council 24 Aug 2026 Full applications
  • 26/01804/FULL Granted

    16 Devereux Road Windsor SL4 1JJ

    Installation of air conditioning compressor unit to the first floor side elevation.

    Received 23 Jul, published by the council 24 Aug 2026 Full applications