Planning application
22/02235/FULL
17 Ray Mill Road East Maidenhead SL6 8SW
Proposal
Installation of an air source heat pump.
As published by the council, reference 22/02235/FULL
Timeline
Dates from the published record
-
16 Aug 2022
Received by Windsor and Maidenhead
-
18 Aug 2022
Validated
Checked as complete and ready for consideration.
-
11 Oct 2022
Decision issued: Application Permitted
-
27 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
21/02004/NMA Granted
Mill House Family Centre 18 - 20 Ray Mill Road East Maidenhead
Non-material amendments to planning permission 21/00544/FULL to vary the wording of Condition 2 (means of enclosure) and 5 (flood measures).
-
22/02870/FULL Granted
31 Ray Mill Road East Maidenhead SL6 8SW
Garage conversion into habitable accommodation, new stairs to side elevation, new detached garage and alterations to fenestration. (Part Retrospective).
-
26/00203/FULL Granted
158 Blackamoor Lane Maidenhead SL6 8RN
Minor alterations to existing building comprising insertion of rooflights, installation of 1 no x bin and 1 no x bike store, and stepped access plus changes to fenestration
-
26/00937/CLAMA Refused
158 Blackamoor Lane Maidenhead SL6 8RN
Prior approval for the change of use from Commercial, Business and Service (Use Class E) to create 8no. dwellings (Use Class C3).
-
22/02779/CPD Granted
168 Blackamoor Lane Maidenhead SL6 8RT
Certificate of lawfulness to determine whether the loft conversion is lawful.
-
22/02290/FULL Granted
176 Blackamoor Lane Maidenhead SL6 8RT
Single storey front infill extension, new side trellis, new side entrance steps, single storey rear extension, first floor side extension with undercroft, first floor side/rear extension, alterations to fenestration and new bin store.
Other full applications applications
In Windsor and Maidenhead
-
26/00962/FULL Granted
Bonnicut Barn Bonnicut Court 14 High Street Sunningdale Ascot SL5 0NB
2no. front dormers, part raising of the front elevation to form a parapet wall and terrace, 3no. front rooflights, 3no. rear dormers and alterations to fenestration. (Part Retrospective).
-
26/01310/FULL Granted
6 Gilman Crescent Windsor SL4 4YN
Single storey front/side extension, relocated front door, two storey rear extension, alterations to fenestration and hardstanding, new steps, 1 no. dropped kerb, following demolition of existing elements
-
25/03313/FULL Refused
Land To The South of Lower Mount Farm Long Lane Cookham Maidenhead
Erection of a crematorium with ceremony hall and memorial arboretum, associated use of land, PV array, vehicular access, parking, landscaping, pavement and road widening along Long Lane.
-
26/01387/FULL Granted
7 Elm Road Windsor SL4 3NB
Single storey rear/side extension
-
26/00877/FULL Granted
45 Queens Close Old Windsor Windsor SL4 2PR
Two storey front/side extension.