Planning application
Land To Rear of 127 To 128 And 127 To 128 High Street Eton Windsor
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Part single part two storey extension on the West elevation with an external staircase on the South elevation, new first floor with office use (use class E(g)ii), replacement and enlargement of the existing bin store and associated works.
As published by the council, reference 22/01700/FULL
Application record
- Reference
- 22/01700/FULL
- Type
- Full
- Status
- Decided
- Decision
- Application Permitted
- Received
- 22 Jun 2022
- Validated
- 23 Jun 2022
- Decided
- 30 Jan 2023
- Ward
- Eton And Castle
- Parish
- Eton Town Council
- Decision by
- Delegated
Timeline
Dates from the published record
-
22 Jun 2022
Received by Windsor and Maidenhead
-
23 Jun 2022
Validated
Checked as complete and ready for consideration.
-
30 Jan 2023
Decision issued: Application Permitted
-
4 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
30 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Land To Rear of 127 To 128 And 127 To 128 High Street Eton Windsor
Consent for a part single part two storey extension on the West elevation with an external staircase on the South elevation, new first floor with office use (use class E(g)ii), replacement and enlargement of the existing bin store, internal alterations and associated works.
Granted Heritage and listed buildings Extension 25 docs -
127 - 128 High Street Eton Windsor
Removal of the existing rear extensions to No. 127-128, inclusive of the staircase from the ground floor and lean-to up to the first floor, construction of a new rear extension to the end of the plot to increase the area of the existing retail unit on ground floor level, x1 two-bedroom apartment proposed on first floor, 2 private terrace spaces, new external staircase, 3 car park spaces, cycle storage and refuse and recycling provision. .
Refused Full applications Extension 27 docs -
127 - 128 High Street Eton Windsor
Consent for internal alterations, removal of the existing rear extensions to No. 127-128, inclusive of the staircase from the ground floor and lean-to up to the first floor, construction of a new rear extension to the end of the plot to increase the area of the existing retail unit on ground floor level, x1 two-bedroom apartment proposed on first floor, 2 private terrace spaces, new external staircase, 3 car park spaces, cycle storage and refuse and recycling provision. .
Granted Heritage and listed buildings Extension 23 docs -
129 High Street Eton Windsor SL4 6AR
07FT Acer - Reduce crown away from building extremities to create final clearance of up to 0.8m.
Granted Trees 5 docs -
Cobblers Cottage Sun Close Eton Windsor SL4 6AR
Details required by condition 4 (Flood warning and Evacuation plan) of planning permission 17/03688 (allowed on appeal) for Change of use of two-storey ancillary retail storeroom to B1 (Office).
Granted Conditions 7 docs -
Eton PreSchool St Johns Church Hall High Street Eton Windsor SL4 6AR
97% historically approved · decision due ~5 Oct
00UL Ash - Reduce lateral limbs on the east, south and west side by 3-4m up to 12m above ground level, 00UE, 00UD Sycamore - Remove deadwood over 50mm, 00UG Sycamore - Remove damaged branch in the upper crown on the northern side and second damaged branch at 12m on eastern side, 00U9 Sycamore - Fell, 00UA Ash - Remove deadwood over 50mm, 00U5, 00UO, 00TX Sycamore - Remove deadwood over 50mm, 07GW Sycamore - Remove deadwood over 50mm and remove split branch in the upper crown on the south side, 00TY Sycamore - Remove deadwood over 50mm, reduce canopy away from utility services/wall/fence to give a clearance of 2m, reduce stem with major cavity by up to 5m vertically and up to 3m laterally, 07GY Sycamore - Remove deadwood over 50mm, reduce canopy away from utility services to give a clearance of 2m, 00U8 Sycamore - Remove deadwood over 50mm and remove defective stem, 07GZ Willow - Pollard at 1.5-2m above ground level, 06AF Ash - Fell, 06AE, 00V5 Cherry - Fell, 00TV Willow - Pollard at 1.5-2m above ground level (main scaffolds), 00TS Sycamore - Remove deadwood over 50mm, reduce decayed laterals by 3m.
Awaiting decision Trees 3 docsSmall domestic
Other full applications applications
In Windsor and Maidenhead
-
26/01628/FULL Granted
25 Bannard Road Maidenhead SL6 4NP
Single storey rear extension following the demolition of the existing conservatory.
-
26/01384/FULL Granted
Stoney Vere Farm House Butchers Lane White Waltham Maidenhead SL6 3SD
Single storey side extension
-
26/01674/FULL Granted
50 Welley Road Wraysbury Staines TW19 5DJ
Detached annexe to be used ancillary to the main dwelling.
-
26/01312/FULL Refused
16 Whyteladyes Lane Cookham Maidenhead SL6 9NA
Hip to gable, 1no. front dormer, 1no. rear dormer and alterations to fenestration and relocation of PV panels.
-
26/01379/FULL Granted
Lotus Cottage Holyport Street Holyport Maidenhead SL6 2JR
Part single part two storey part first floor rear/side extension and alterations to fenestration.