Skip to content
PlanIndex Get alerts
Menu

Planning application

97 Victoria Road Ascot SL5 9DR

Granted Windsor and Maidenhead 21/03665/FULL Full

Works: Extension Loft or dormer Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Two storey side extension, x1 side rooflight, new rear pitched roof, x3 rooflights to the existing single storey rear element and alterations to fenestration.

As published by the council, reference 21/03665/FULL

Application record

Reference
21/03665/FULL
Type
Full
Status
Decided
Decision
Application Permitted
Received
16 Dec 2021
Validated
16 Dec 2021
Decided
8 Feb 2022
Ward
Ascot & Sunninghill
Parish
Sunninghill And Ascot Parish
Decision by
Delegated
Postcode
SL5 9DR

Timeline

Dates from the published record

  1. 16 Dec 2021

    Received by Windsor and Maidenhead

  2. 8 Feb 2022

    Decision issued: Application Permitted

  3. 16 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 97 Victoria Road Ascot SL5 9DR

    22/00569/FULL Submitted 2 Mar 2022 0m away

    Two storey front/side extension, new rear pitched roof, 1no. side rooflight, 3no. rooflights to the existing single storey rear element and alterations to fenestration.

    Granted Full applications Extension Loft or dormer +1 11 docs
    Small domestic
  • 91 Victoria Road Ascot SL5 9DR

    21/03521/CPD Submitted 29 Nov 2021 18m away

    Certificate of lawfulness to determine whether the proposed x2 front rooflights and x1 rear L-shaped dormer to facilitate a loft conversion is lawful.

    Granted Lawful development Loft or dormer 8 docs
  • Birch House Church Road Ascot SL5 9DP

    21/01224/FULL Submitted 20 Apr 2021 37m away

    Hip to gable loft conversion with x2 dormers to front elevation and x1 dormer to rear elevation, second floor rear extension, x2 windows to side elevations following demolition of existing chimneys.

    Withdrawn Full applications Extension Loft or dormer +2 18 docs
  • Birch House Church Road Ascot SL5 9DP

    22/01742/FULL Submitted 28 Jun 2022 39m away

    Hip to Gable to accommodate a loft conversion, first floor side/rear extension and alterations to fenestration.

    Granted Full applications Extension Loft or dormer +1 22 docs
  • South Ascot Recreation Ground Victoria Road Ascot

    25/02473/CPD Submitted 19 Sep 2025 58m away

    Certificate of lawfulness to determine whether the proposed resurfacing of the existing playground and replacement play equipment is lawful.

    Granted Lawful development 10 docs
  • Land At 5 Vicarage Gardens Ascot

    21/02630/VAR Submitted 26 Aug 2021 81m away

    Variation (under Section 73A) of Condition 11 (Approved Plans) to substitute those plans approved under 19/00624/VAR for the Variation (under section 73) of Condition 6 (Access), Condition 7 (Construction Management Plan), Condition 8 (Slab levels) and Condition 12 (Approved Plans) to planning permission 18/00480/FULL (Detached dwelling with integral garage) to amend the slab levels and reduce the gradient of the vehicular access with amended plans.

    Granted Amendments New dwelling 18 docs
    Domestic

In Windsor and Maidenhead

  • 26/01628/FULL Granted

    25 Bannard Road Maidenhead SL6 4NP

    Single storey rear extension following the demolition of the existing conservatory.

    3 Jul 2026 Full applications
  • 26/01384/FULL Granted

    Stoney Vere Farm House Butchers Lane White Waltham Maidenhead SL6 3SD

    Single storey side extension

    4 Jun 2026 Full applications
  • 26/01674/FULL Granted

    50 Welley Road Wraysbury Staines TW19 5DJ

    Detached annexe to be used ancillary to the main dwelling.

    9 Jul 2026 Full applications
  • 26/01312/FULL Refused

    16 Whyteladyes Lane Cookham Maidenhead SL6 9NA

    Hip to gable, 1no. front dormer, 1no. rear dormer and alterations to fenestration and relocation of PV panels.

    27 May 2026 Full applications
  • 26/01379/FULL Granted

    Lotus Cottage Holyport Street Holyport Maidenhead SL6 2JR

    Part single part two storey part first floor rear/side extension and alterations to fenestration.

    4 Jun 2026 Full applications