Planning application
Convent Court Hatch Lane Windsor
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Consent for the routing of a replacement media cable externally to building between existing junction box on west side of the building and Apartment 29 on the south side of the building.
As published by the council, reference 21/00101/LBC
Application record
- Reference
- 21/00101/LBC
- Type
- Listed Building Consent
- Status
- Decided
- Decision
- Application Permitted
- Received
- 14 Jan 2021
- Validated
- 18 Jan 2021
- Decided
- 6 May 2021
- Ward
- Clewer East
- Parish
- Windsor Unparished
- Decision by
- Delegated
Timeline
Dates from the published record
-
14 Jan 2021
Received by Windsor and Maidenhead
-
18 Jan 2021
Validated
Checked as complete and ready for consideration.
-
6 May 2021
Decision issued: Application Permitted
-
12 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Windsor and Maidenhead granted permission on 6 May 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
1 Bailey Close Windsor SL4 3RD
Single storey side and front extension, new mono pitched roof over existing front element and alterations to fenestration.
Granted Full applications Extension Windows or glazing 9 docsSmall domestic -
3 Bailey Close Windsor SL4 3RD
71% historically approved · decision due ~16 Sep
Garage conversion with mono pitched roof and 1 no. front rooflight
Awaiting decision Full applications Loft or dormer 6 docs -
Farm Cottage Hatch Lane Windsor SL4 3QY
Two storey rear extension and alterations to fenestration.
Granted Full applications Extension Windows or glazing 14 docs -
19 Convent Road Windsor SL4 3RB
New front bay window to include a new entrance canopy, single storey rear extension, new external finishes and alterations to fenestration.
Granted Full applications Extension Windows or glazing 12 docsSmall domestic -
19 Convent Road Windsor SL4 3RB
Non material amendments to planning permission 21/00625/FULL for the replacement of the pitched roof with a flat roof.
Refused Amendments 6 docs -
19 Convent Road Windsor SL4 3RB
Singly storey front extension with new entrance canopy, single storey rear extension, new external finishes and alterations to fenestration.
Granted Full applications Extension Windows or glazing 11 docsSmall domestic
Other heritage and listed building applications
In Windsor and Maidenhead
-
26/01805/LBC Granted
CAFFÈ NERO Unit 58-59 Windsor Royal Railway Station Jubilee Arch Windsor SL4 1PJ
Consent for the demolition of the existing free-standing Caffe Nero unit.
-
26/02188/LBC Awaiting decision
The Queen Charlotte Church Lane Windsor SL4 1PA
Consent for new signage,1no. lantern, 2no. cowl lights and alterations to external finish.
-
26/01211/LBC Granted
Ann Duels House Holyport Street Holyport Maidenhead SL6 2JR
Consent to replace 8 No. casements in 3 windows on the front elevation
-
26/01557/LBC Granted
Wiggington House High Street Eton Windsor
Consent for roof works to include the following replacements to the existing roof: roof tiles, 4no. dormer lead roof coverings, timber facing boards, fascia and soffits, rainwater goods and 1no. chimney pot for 1- 5 and 12 -13 Wiggington House.
-
26/01084/LBC Refused
St Marks Hospital 112 St Marks Road Maidenhead SL6 6DU
Consent for the retention of works to Blocks 6 and 8, including replacement of internal doors, erection of subdividing walls, installation of new DDA-compliant toilet, replacement of external DDA ramp, installation of window opening to internal partition and proposed replaced of external double doors to Block 6.