Skip to content
PlanIndex Get alerts
Menu

Planning application

Land From Pumping Station At Junction of River Gardens Old Mill Lane To Pumping Station Upper Bray Road Bray Maidenhead

Granted Windsor and Maidenhead 20/01359/EIASCR EIA Screening

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

EIA screening request for construction of new water main from Bray Water Treatment Works to Upper Bray Road.

As published by the council, reference 20/01359/EIASCR

Application record

Reference
20/01359/EIASCR
Type
EIA Screening
Status
Permitted
Decision
Granted As published: No Objection
Received
9 Jun 2020
Validated
9 Jun 2020
Decided
30 Jun 2020
Ward
Bray
Parish
Bray Parish
Decision by
Delegated

Site history

Applications at this address on the Windsor and Maidenhead register

This site has had 2 applications since 2020: 2 approved, 0 refused.

  • 20/01362/TPO Granted

    Land From Pumping Station At Junction of River Gardens Old Mill Lane To Pumping Station Upper Bray Road Bray Maidenhead

    Fell 3 mature Lime trees, one each at the northen end of G9, G5 and G4 as identified on the Tree Constraints Plan and on the proposed Tree Works Plan. Lower level epicormic growth to be removed from 2 trees on either side of a gap at the northern end of G3 and 2 trees at the southern end of G9.

    Decided 21 Jul 2020 Trees

Timeline

Dates from the published record

  1. 9 Jun 2020

    Received by Windsor and Maidenhead

  2. 30 Jun 2020

    Decision issued: No Objection

  3. 12 Oct 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

21 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Windsor and Maidenhead granted permission on 30 June 2020, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Land From Pumping Station At Junction of River Gardens Old Mill Lane To Pumping Station Upper Bray Road Bray Maidenhead

    20/01362/TPO Submitted 10 Jun 2020 150 yards away

    Fell 3 mature Lime trees, one each at the northen end of G9, G5 and G4 as identified on the Tree Constraints Plan and on the proposed Tree Works Plan. Lower level epicormic growth to be removed from 2 trees on either side of a gap at the northern end of G3 and 2 trees at the southern end of G9.

    Granted Trees 8 docs
  • Bray Allotments High Street Bray Maidenhead

    20/03003/TCA Submitted 10 Nov 2020 150 yards away

    (G1) - Group of Leyland Cypress, Ash and Sycamore - Tip reduce the lateral limbs back by approximately 1.5m. Crown lift to give 1 metre clearance from the sheds.

    Granted Trees 6 docs
  • Trais Fluors Brayfield Road Bray Maidenhead SL6 2BW

    21/02728/TCA Submitted 7 Sep 2021 200 yards away

    (T1) Plane - Crown lift to a height of 5.5-6m over the driveway and tip reduce lower branches to north to provide a 2m clearance from cables. (T2) Norway Maple - Crown lift to a height of 5.5 over the driveway and tip reduce lower branches to west to provide a 3.5m clearance from side of the adjacent house. (T3) Sweet Chestnut - Remove ivy from stem to enable inspection of any decay. (T4) Hornbeam - Removed and replace. (T5) Sweet Chestnut - Remove ivy and dead wood and crown lift to a height of 5.5 -6m over ground level.(T6) Lime - Crown lift to a height of 5.5 -6m over ground level. (T9) Strawberry Tree - Tip reduce lower branches adjacent to garage and over driveway to provide a clearance of 0.5m from the building. T10 Hornbeam - Remove tree.

    Granted Trees 7 docs
  • Trais Fluors Brayfield Road Bray Maidenhead SL6 2BW

    25/02107/TCA Submitted 18 Aug 2025 200 yards away

    T1 - Conifer - Reduce height by 3m, T2 - Sycamore - Reduce 1 x low branch growing over driveway, T3 - Sweet Chestnut - Remove epicormic growth around stem to crown break and over driveway, T4 - Sycamore - Remove low growth around stem on driveway side, Reduce canopy growing towards neighbours house to give 2m clearance, T5 - London plane - Prune to give 2m clearance to neighbouring house, T6 - Arbutus - Prune to give 0.5m clearance to phone line.

    Granted Trees 11 docs
  • Careless Corner Brayfield Road Bray Maidenhead SL6 2BN

    21/00129/FULL Submitted 18 Jan 2021 200 yards away

    Garage conversion, part first floor, part two storey side/rear extension, alterations to fenestration and sub division of the property into two semi detached dwellings.

    Refused Full applications Extension Windows or glazing 23 docs
  • Careless Corner Brayfield Road Bray Maidenhead SL6 2BN

    22/00689/FULL Submitted 11 Mar 2022 200 yards away

    Garage conversion with raising of the ridge and 1no. rear dormer, two storey side/rear extension, alterations to fenestration and sub division of the property into two semi-detached dwellings.

    Refused Full applications Extension Loft or dormer +1 18 docs

In Windsor and Maidenhead

  • 26/02453/PIP Awaiting decision

    Wych Elms Oakley Green Road Oakley Green Windsor SL4 4QF

    Erection of dwellinghouse.

    Received 6 Oct, published by the council 12 Oct 2026 Outline
  • 26/02369/EIASCR Awaiting decision

    Land On The East Side of Royal Windsor Way Eton Windsor SL4 6DU

    Screening Opinion from the Council under Regulation 6 of the Environmental Impact Assessment Regulations 2017 ("the EIA Regulations"), to confirm whether or not there is a requirement for an Environmental Impact Assessment ("EIA") in relation to the Construction and operation of an agri-photovoltaics facility up to 5 MWp capacity with associated works, equipment and infrastructure.

    Received 25 Sep, published by the council 4 Oct 2026 Outline
  • 26/01966/PIP Refused

    Snapper Holyport Road Maidenhead SL6 2HA

    3 no. dwellings with landscaping and hardstanding following demolition of existing dwelling

    Received 7 Aug, published by the council 16 Aug 2026 Outline
  • 26/02219/OUT Awaiting decision

    Land Adjacent To Morland House Hungerford Lane Shurlock Row Reading

    Outline application for Access only to be considered at this stage with all other matters to be reserved for the construction of 8 no. dwellings.

    Received 8 Sep, published by the council 24 Sep 2026 Outline
  • 26/01442/EIASCO Decided

    Horton Quarry And Landfill Horton Road Horton Slough

    EIA Scoping Opinion Request letter and supporting EIA Scoping Report under Regulation 15 of The Town and Country Planning (Environmental Impact Assessment) Regulations 2017 in respect for further development of Horton Quarry and Landfill.

    Received 9 Jun, published by the council 25 Jul 2026 Outline