Skip to content
PlanIndex Get alerts
Menu

Planning application

Brendon House Park Road Winchester Hampshire SO23 7BE

Awaiting decision Winchester 26/01499/DIC

Relates to 25/02183/FUL

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Discharge of conditions for 25/02183/FUL- Condition No.s 3, 5, 6, 10, 19, 21 and 22

As published by the council, reference 26/01499/DIC

Application record

Reference
26/01499/DIC
Status
Current
Received
21 Jul 2026
Validated
21 Jul 2026
Ward
ST BARTHOLOMEW WARD
Parish
Winchester Town
Postcode
SO23 7BE

Site history

Applications at this address on the Winchester register

This site has had 3 applications since 2022: 2 approved, 0 refused.

  • 25/02183/FUL Granted

    Brendon House Park Road Winchester Hampshire SO23 7BE

    Part demolition and part conversion of an existing C2 Care Home to three C3 residential dwellings, with the erection of five C3 residential dwellings, with associated access, landscaping and parking (Amended Plans)

    Decided 12 Mar 2026 Full applications
  • 22/02668/TPO Granted

    Brendon House Park Road Winchester Hampshire SO23 7BE

    T1 - Lime - Re-pollard the tree to the previous pollard points. Remove all epicormic growth from around the base of the tree and from the main stem. Proposed works are part of ongoing work to ensure a good/safe clearance is maintained.

    Decided 13 Jan 2023 Trees

Timeline

Dates from the published record

  1. 21 Jul 2026

    Received by Winchester

  2. 26 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 15 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Winchester took a median of 58 days over the applications it decided in the last year.

Cases linked to this one on the register

  • 25/02183/FUL Granted

    Brendon House Park Road Winchester Hampshire SO23 7BE

    Part demolition and part conversion of an existing C2 Care Home to three C3 residential dwellings, with the erection of five C3 residential dwellings, with associated access, landscaping and parking (Amended Plans)

    Decided 12 Mar 2026 Full applications

Documents

Plans, drawings, consultee responses and the officer's report

38 documents on file for this application

  • CONDITION 5 REV C Details in Compliance - Documents · 01 Sep 2026
  • CONDITION 3 REV B Details in Compliance - Documents · 24 Aug 2026
  • CONDITION 5 REV B Details in Compliance - Documents · 24 Aug 2026
  • CONDITION 3 DETAILS Details in Compliance - Documents · 20 Aug 2026
  • CONDITION 5 Details in Compliance - Documents · 20 Aug 2026
  • WCC DRAINAGE ENGINEER Consultee Comment · 19 Aug 2026
  • APPLICATION FORM - WITHOUT PERSONAL DATA Application Form · 21 Jul 2026
  • COVING DETAILS Drawing · 21 Jul 2026
  • ST5 MOULDED STRING COURSE Drawing · 21 Jul 2026
  • EXTERNAL MATERIAL SPECIFICATION Drawing · 21 Jul 2026
  • ELEVATIONS Drawing · 21 Jul 2026
  • GUTTERING DIMENSIONS Drawing · 21 Jul 2026
  • EXTERNAL MATERIAL SPECIFICATION Background Papers · 21 Jul 2026
  • DOOR DETAILS (PLANS AND ELEVATIONS) Drawing · 21 Jul 2026
  • FRONT DOOR DETAILS (SECTION) Drawing · 21 Jul 2026
  • DOOR DETAILS (PLANS AND ELEVATIONS) Drawing · 21 Jul 2026
  • WINDOW DETAILS Drawing · 21 Jul 2026
  • WINDOWS DETAILS Drawing · 21 Jul 2026
  • SLIDING WINDOW (SECTIONS) Drawing · 21 Jul 2026
  • SLIDING WINDOWS (PLANS AND ELEVATIONS) Drawing · 21 Jul 2026
  • VELUX DETAILS Drawing · 21 Jul 2026
  • DOOR DETAILS (SECTIONS) Drawing · 21 Jul 2026
  • CONSTRUCTION PHASE PLAN Background Papers · 21 Jul 2026
  • CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN Background Papers · 21 Jul 2026
  • SAP CALCULATIONS Background Papers · 21 Jul 2026
  • SAP CALCULATIONS Background Papers · 21 Jul 2026
  • SAP CALCULATIONS Background Papers · 21 Jul 2026
  • WATER EFFICIENCY CALCULATOR Background Papers · 21 Jul 2026
  • PART L STATEMENT Background Papers · 21 Jul 2026
  • SAP CALCULATIONS Background Papers · 21 Jul 2026
  • SAP CALCULATIONS Background Papers · 21 Jul 2026
  • RAINFALL AND DRAINAGE DETAILS Background Papers · 21 Jul 2026
  • RAINFALL AND DRAINAGE DETAILS Background Papers · 21 Jul 2026
  • RAINFALL AND DRAINAGE DETAILS Background Papers · 21 Jul 2026
  • DRAINAGE STRATEGY PLAN Drawing · 21 Jul 2026
  • RAINFALL AND DRAINAGE DETAILS Background Papers · 21 Jul 2026
  • SITE SECTIONS Drawing · 21 Jul 2026
  • COVERING LETTER Background Papers · 21 Jul 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Winchester for determination, against a statutory target of eight weeks. Over the last year Winchester's median decision took 58 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Winchester's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres