Skip to content
PlanIndex Get alerts
Menu

Planning application

26/01292/HOU

2 The Post House Dever Close Micheldever Winchester Hampshire SO21 3SR

Awaiting decision Winchester Householder Application

Proposal

Installation of 14 solar panels to the front roof, and 4 panels on the rear roof.

As published by the council, reference 26/01292/HOU

Timeline

Dates from the published record

  1. 22 Jun 2026

    Received by Winchester

  2. 26 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Winchester for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About householder applications

How this application type works

Householder applications cover work to an existing house and its garden: extensions, loft and garage conversions, porches, outbuildings and similar alterations within the boundary of the home. They cannot be used to create a separate dwelling or change what the building is used for. Councils aim to decide them within eight weeks, and immediate neighbours are usually notified and given a chance to comment.

More on householder applications in our guide

Nearby applications

Within 500 metres

  • 25/02041/TPC Granted

    Rosemary Cottage 55 Church Street Micheldever Winchester Hampshire SO21 3DB

    Remove Dogwood at the rear of the garden as it is pushing the fence over.

    7 Oct 2025 48m away Trees
  • 26/00642/TPC Granted

    Haig House Church Street Micheldever Winchester Hampshire SO21 3DB

    T1 - Sweet Chestnut - Our client would like to apply for a long term application for a period of up to 10 years, to pollard his Sweet Chestnut tree annually back to previously pruned points. The tree has been managed by our client for the duration of the clients ownership of the property circa 20 years and the tree is in good health.

    25 Mar 2026 86m away Trees
  • 21/02143/TPC Granted

    Rose Cottage Duke Street Micheldever Winchester Hampshire SO21 3DF

    (In garden) - T1 Apple, T2 Apple, T3 Honey Locust, T4 Weeping Pear, T5 Magnolia - canopy reduction of 2-3meters, leaving cut no larger than 40mm. (In Northbrook Hall next door) - T6 Ash, T7 Birch - reduce overhanging branches into garden by 2-3 meters.

    10 Aug 2021 241m away Trees
  • 26/01076/LDP Awaiting decision

    North Barn Sloe Lane Micheldever Winchester Hampshire SO21 3DA

    Siting of Mobile Caravan Structure to Provide Ancillary Annexe Accommodation.

    21 May 2026 281m away Lawful development
  • 25/02356/TPC Granted

    Northbrook Hall Duke Street Micheldever Winchester Hampshire SO21 3DF

    We have recently been granted Planning Permission to install solar panels on the south facing roof of Northbrook Hall, which stands in the conservation area of Micheldever. In order to gain the full benefits of the system we wish to prune back the crab apple tree which sits to the south of the building. I attach a photo of the tree in front of the building. The tree was one of a pair of trees that were planted, presumably for decorative purposes, on the strip of land between the Hall and Duke Street. The second tree, a cherry ( to the left of the crab apple in the picture) suffered a substantial break a few years ago and has so far failed to regenerate. I understand that it is now unlikely to do so. Pillar Apple - Reduce crown of Apple to previous reduction points. (Amended) It should be noted that this part of Duke Street has a large number of very tall mature hard wood trees which of course would not be affected at all. We would suggest that the environmental benefits of a more efficient solar panel installation would outweigh the very minor change to the tree population of the immediate area.

    20 Nov 2025 282m away Trees
  • 26/00435/LDP Withdrawn

    Sloe House Sloe Lane Micheldever Winchester Hampshire SO21 3DA

    The construction of a steel framed workshop situated 2m's from the boundary with an eaves height of 2.5m and ridge height of 4m with a dual pitch roof. Size 10m x12m. Construction of hard standing for building 12m x 15m.

    4 Mar 2026 329m away Lawful development

In Winchester

  • 26/00905/HOU Granted

    13 Chestnut Avenue Littleton Winchester Hampshire SO22 6PL

    Single storey rear extension.

    29 Apr 2026 Householder
  • 26/01528/HOU Awaiting decision

    Ladywell House Ladywell Lane Alresford Hampshire SO24 9DF

    Replacement detached garage

    24 Jul 2026 Householder
  • 26/01099/HOU Granted

    12 Honeysuckle Close Badger Farm Winchester Hampshire SO22 4QQ

    Retrospective Planning application for rear conservatory.

    27 May 2026 Householder
  • 26/01098/HOU Granted

    Athgarvan House Pearson Lane Shawford Winchester Hampshire SO21 2AA

    A two story front extension

    26 May 2026 Householder
  • 26/00947/HOU Granted

    Juvenca Lodge Little Bull Lane Waltham Chase Southampton Hampshire SO32 2LT

    Single storey pitched side extension to existing detached garage to include 2 rooflights.

    6 May 2026 Householder