Planning application
26/00174/HCS
Land Adj To Ramblers Hawthorn Close Micheldever Hampshire
Proposal
Extinguishment of Highway Rights over the area shaded red on the plan below
As published by the council, reference 26/00174/HCS
Timeline
Dates from the published record
-
5 Jan 2026
Received by Winchester
-
2 Feb 2026
Decision issued: That no objection be raised
-
26 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About this record
Reading the register
This page mirrors an entry on the statutory planning register that Winchester is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.
Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.
Nearby applications
Within 500 metres
-
26/00372/DIC Awaiting decision
Elm Trees Hawthorn Close Micheldever Winchester Hampshire SO21 3DQ
25/00682/HOU - Discharge of conditions 6,3 and 5.
-
26/00144/LIS Granted
Fardels Duke Street Micheldever Winchester Hampshire SO21 3DF
Change of material used for roof
-
25/02356/TPC Granted
Northbrook Hall Duke Street Micheldever Winchester Hampshire SO21 3DF
We have recently been granted Planning Permission to install solar panels on the south facing roof of Northbrook Hall, which stands in the conservation area of Micheldever. In order to gain the full benefits of the system we wish to prune back the crab apple tree which sits to the south of the building. I attach a photo of the tree in front of the building. The tree was one of a pair of trees that were planted, presumably for decorative purposes, on the strip of land between the Hall and Duke Street. The second tree, a cherry ( to the left of the crab apple in the picture) suffered a substantial break a few years ago and has so far failed to regenerate. I understand that it is now unlikely to do so. Pillar Apple - Reduce crown of Apple to previous reduction points. (Amended) It should be noted that this part of Duke Street has a large number of very tall mature hard wood trees which of course would not be affected at all. We would suggest that the environmental benefits of a more efficient solar panel installation would outweigh the very minor change to the tree population of the immediate area.
-
21/02570/DIC Granted
Perrys Acre Duke Street Micheldever SO21 3DF
Discharge of conditions 3 and 5 of planning application 20/00776/LIS and conditions 3 and 4 of planning application 20/00775/HOU
-
21/02143/TPC Granted
Rose Cottage Duke Street Micheldever Winchester Hampshire SO21 3DF
(In garden) - T1 Apple, T2 Apple, T3 Honey Locust, T4 Weeping Pear, T5 Magnolia - canopy reduction of 2-3meters, leaving cut no larger than 40mm. (In Northbrook Hall next door) - T6 Ash, T7 Birch - reduce overhanging branches into garden by 2-3 meters.
-
26/00435/LDP Withdrawn
Sloe House Sloe Lane Micheldever Winchester Hampshire SO21 3DA
The construction of a steel framed workshop situated 2m's from the boundary with an eaves height of 2.5m and ridge height of 4m with a dual pitch roof. Size 10m x12m. Construction of hard standing for building 12m x 15m.