Planning application
Nairnside 2 Poles Lane Otterbourne SO21 2DS
Works: Extension Loft or dormer Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Two Storey Extension, Single Storey Rear Extension and loft conversion with dormer
As published by the council, reference 21/01061/HOU
Application record
- Reference
- 21/01061/HOU
- Type
- Householder Application
- Status
- Decided
- Decision
- Granted As published: Application Permitted
- Received
- 20 Apr 2021
- Validated
- 20 Apr 2021
- Decided
- 16 Jun 2021
- Ward
- BADGER FARM AND OLIVERS BATTERY WARD
- Parish
- Otterbourne Parish Council
- Decision by
- Delegated Decision
- Postcode
- SO21 2DS
Timeline
Dates from the published record
-
20 Apr 2021
Received by Winchester
-
16 Jun 2021
Decision issued: Application Permitted
-
22 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
1 later application on the register refers to this one:
-
21/02356/NMA Granted
Nairnside 2 Poles Lane Otterbourne Winchester Hampshire SO21 2DS
Ref: 21/01061/HOU Raising the height of the single storey extension by 200mm and reducing the size of the bathroom window
Who's behind it
Company information only, from the register and Companies House
Applecore PDM Ltd Agent, registered in Southampton
Active · incorporated 2020 · Southampton
124 applications on PlanIndex · across 17 councils · 92% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Winchester granted permission on 16 June 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About householder applications
Householder applications cover work to an existing house and its garden, such as extensions, lofts and outbuildings, and cannot create a separate dwelling or change what the building is used for. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Arnage Norlands Drive Otterbourne SO21 2DT
G1 - 2No. Lime Tree, to raise the crown over the footpath 2.75m and highway to approximately 5 meters, back to best practice pruning in accordance with BS3998(2010). Removing the epicormic growth on the stems of the trees and major deadwood (diameter greater than 50mm) from over the footpath and highway. Tree causing an obstruction, wish to carry out some health and safety measures
Granted Trees 4 docs -
Arnage Norlands Drive Otterbourne Winchester Hampshire SO21 2DT
One of the lime trees within our property boundary is sprouting shoots at low / ground level, creating an obstruction along the pavement. We would like permission to cut this back 2 metres from ground level so that pedestrians can pass easily. Also want to pull off the Ivy which is starting to grow up that tree. (see original application)
Granted Trees 3 docs -
8 Poles Lane Otterbourne SO21 2DS
Please find attached a Certificate of Lawfulness for an Existing Use or Development (CLEUD) confirming that the planning permission 15/01613/FUL has been lawfully implemented in accordance with condition no. 1. The date of the decision was 9th September 2015 so needed to be implemented by 9th September 2018. The application's description obtained approval for the construction of a ground floor side extension and a first-floor rear extension. Please find attached existing and approved plans. I have implemented the planning application by reason of the construction of the boot room, that formed part of the proposal and is cited on the decision notice. Evidence of the presence of the boot room is shown in the photographs also attached. I have also added the ground floor cloakroom and utility room as shown on the approved plans.
Granted Lawful development Extension 6 docs -
1 Oakwood Close Otterbourne SO21 2EB
Tulip Tree (T1) - Crown lifting up to 4.5m with branches up to 75mm, Removal of long lever arm branch approximately 6m high. Tip proof 1 branch on the western side canopy. Removal of dead and dying branches. Yew Tree (T2) - Crown reduction by 1.5m and crown lift to 3.5m. Remove epicormic growth.
Granted Trees 4 docs -
Nairnside 2 Poles Lane Otterbourne Winchester Hampshire SO21 2DS
Ref: 21/01061/HOU Raising the height of the single storey extension by 200mm and reducing the size of the bathroom window
Granted Amendments Extension Windows or glazing 3 docsSmall domestic -
1 Oakwood Close Otterbourne SO21 2EB
Tulip tree (T1) fell because of excessive shading resulting in loss of other trees and shrubs in the vicinity. Do not want to replant due to close proximity of Yew tree (T2).
Refused Trees 4 docs
Other householder applications
In Winchester
-
26/02132/HOU Awaiting decision
24 Cranworth Road Winchester Hampshire SO22 6SE
Side extension replacing existing conservatory, reconfiguration of windows to provide new doors, new patio and removal of chimney stack.
-
26/02131/HOU Awaiting decision
Dawson New Farm Road Alresford Hampshire SO24 9QP
Erection of a single-storey side and front extension and installation of Velux windows in the existing roof.
-
26/02119/HOU Awaiting decision
49 Church Lane Colden Common Winchester Hampshire SO21 1TW
Proposed rear extension and roof conversion
-
26/02108/HOU Awaiting decision
Little Fontley Fontley Road Titchfield Fareham Hampshire PO15 6QS
Enlargement of existing dormer window to east facing elevation of main roof
-
26/02098/HOU Awaiting decision
Zeina Winchester Road Waltham Chase Southampton Hampshire SO32 2LX
Front porch