Skip to content
PlanIndex Get alerts
Menu

Planning application

Lock 11 Wigan Flight Leeds And Liverpool Canal Wigan

Granted Wigan A/26/101410/VARLB

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

To vary condition 2 (plans) of Listed Building Consent A/25/099840/LB- to allow installation of railings around the mechanical winding gear and to remove the existing heel grips and counterweight from both bottom gate quadrants

As published by the council, reference A/26/101410/VARLB

Application record

Reference
A/26/101410/VARLB
Status
Decided
Decision
Granted As published: Approved with Conditions
Received
24 Aug 2026
Validated
24 Aug 2026
Decided
16 Oct 2026
Ward
Ince
Parish
Wigan North

Timeline

Dates from the published record

  1. 24 Aug 2026

    Received by Wigan

  2. 1 Sep 2026

    Added to PlanIndex

  3. 16 Oct 2026

    Decision issued: Approved with Conditions

  4. 16 Oct 2026

    Status changed to Decided

    Previously Registered.

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

  • LL 058 008 LLC LOCK 11 LOCATION PLAN VER1 Location Plan · 01 Sep 2026
  • A.26.101410.VARLB WIGAN OBSERVER 08.09.2026 Admin Document · 01 Sep 2026
  • APPLICATIONFORMREDACTED Application Form · 24 Aug 2026
  • LL-058-008 LLC LOCK 11 HERITAGE STATEMENT VER 2 Supporting Report · 24 Aug 2026
  • LL-058-008 LLC LOCK 11 DESIGN & ACCESS VER 2 Supporting Report · 24 Aug 2026
  • 5619-P-004-# LL-058-008 LOCK 11 HANDRAIL ELEVATION Plans and Drawings · 24 Aug 2026
  • 5619-P-003-# LL-058-008 LOCK 11 WINDING MECHANISM Plans and Drawings · 24 Aug 2026
  • 5619-P-002-# LL-058-008 LOCK 11 PROPOSED ARRANGEMENT Plans and Drawings · 24 Aug 2026
  • 5619-P-001-# LL-058-008 LOCK 11 EXISTING ARRANGEMENT Plans and Drawings · 24 Aug 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Wigan granted permission on 16 October 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Wigan's portal will say. Our guide explains the common types.