Planning application
Hawkhurst Farm East Lancashire Road Glazebury Warrington WA3 5QE
Works: Demolition Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of new dwellinghouse with associated landscaping and new garden wall and gates, following demolition of existing ancillary storage building and removal of storage containers
As published by the council, reference A/25/099601/FULL
Application record
- Reference
- A/25/099601/FULL
- Type
- Full Details
- Status
- Decided
- Decision
- Approved with Conditions
- Received
- 2 Sep 2025
- Validated
- 24 Sep 2025
- Decided
- 16 Jun 2026
- Ward
- Astley
- Parish
- Tyldesley And Astley Township
- Decision by
- Delegated Decision
- Postcode
- WA3 5QE
Timeline
Dates from the published record
-
2 Sep 2025
Received by Wigan
-
24 Sep 2025
Validated
Checked as complete and ready for consideration.
-
16 Jun 2026
Decision issued: Approved with Conditions
-
24 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
22 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Hawkhurst Farm East Lancashire Road Glazebury Warrington WA3 5QE
Listed building consent for the erection of new dwellinghouse with associated landscaping and new garden wall and gates, following demolition of existing ancillary storage building and removal of storage containers
Granted Heritage and listed buildings Demolition 11 docsDomestic
Other full applications applications
In Wigan
-
A/26/100480/FULL Refused
65B Church Street Standish Wigan WN6 0JT
Erection of a two storey/single storey building to be used as a drinking establishment (Sui Generis), with external works, following demolition of existing pharmacy building and one garage
-
A/26/101398/FULL Awaiting decision
Land At 287 Chaddock Lane Worsley Manchester M28 1DU
Change of use of land, siting of 2 timber clad containers and erection of wooden chalet to be used as café/food outlet (Use Class E) together with associated parking area, 2.4m high gates and new access from Chaddock Lane
-
A/25/099404/FULL Granted
Methodist Church 32B Wigan Road Leigh WN7 5AH
Creation of new internal first floor level and associated internal and external alterations to include replacement windows and refurbishment of existing, installation of new glazed doors with shutters thereto
-
A/26/100661/FULL Granted
31 Wigan Lane Wigan WN1 1XR
Change of use of first and second floors from residential (Use Class C3) to office accommodation (Use Class E), retaining aesthetics clinic (Use Class E) at ground floor
-
A/26/100267/FULL Granted
Carpet Wizard 436 Ormskirk Road Wigan WN5 9DF
New openings at ground and first floor to front and sides, canopy to front and render to all elevations