Planning application
Central Park Montrose Avenue Wigan WN5 9XL
Works: New dwelling Demolition Major scheme
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Following the demolition of two blocks, erection of two single storey new build education blocks, renovation of an existing education block including new canopy to side and external alterations with associated works to form playgrounds including free-standing canopy and relocated play equipment, erection of new substation, car parking, minibus drop-off, lighting columns/bollards and upgraded site boundary fence, and biodiversity planting
As published by the council, reference A/24/97281/MAJPSI
Application record
- Reference
- A/24/97281/MAJPSI
- Type
- Major Public Sector Infrastructure
- Status
- Decided
- Decision
- Granted As published: Approved with Conditions
- Received
- 13 May 2024
- Validated
- 6 Jun 2024
- Decided
- 22 Nov 2024
- Ward
- Pemberton
- Parish
- Wigan South
- Decision by
- Delegated Decision
- Postcode
- WN5 9XL
Site history
Applications at this address on the Wigan register
This site has had 8 applications since 2023: 2 approved, 0 refused.
-
A/26/101612/CON Decided
Central Park Montrose Avenue Wigan WN5 9XL
Condition Discharge application to PART discharge Condition No.4 (CEMP - Works Programme and Site Hours) in respect of approved application A/24/97281/MAJPSI
-
A/26/101617/CON Awaiting decision
Central Park Montrose Avenue Wigan WN5 9XL
Condition Discharge application to discharge Condition No.29 (CT&EMP - Phase 3) in respect of approved application A/24/97281/MAJPSI
-
A/26/101364/CON Awaiting decision
Central Park Montrose Avenue Wigan WN5 9XL
Condition Discharge application to discharge Condition No.5 (Construction & Environment Management Plan - Phase3) in respect of approved application A/24/97281/MAJPSI
-
A/26/101214/CON Awaiting decision
Central Park Montrose Avenue Wigan WN5 9XL
Condition Discharge application to PART discharge Condition No.10 (Contamination) and Condition No.11 (Contamination) and to FULLY discharge Condition No.3 (Materials) in respect of approved application A/24/97281/MAJPSI
-
A/26/101020/MAJOR Awaiting decision
Central Park Montrose Avenue Wigan WN5 9XL
Installation of temporary modular classroom block on the multi use games area
-
A/25/099037/CON Decided
Central Park Montrose Avenue Wigan WN5 9XL
Condition Discharge application to Part Discharge Condition 10.1 (Contamination) and Condition 12.1 (Gas Migration) and to Fully Discharge Condition 20 (Hard and Soft Landscaping) and Condition 21 (Hard and Soft Landscaping) in respect of application A/24/97281/MAJPSI
-
A/23/95358/LA Granted
Central Park Montrose Avenue Wigan WN5 9XL
Application for demolition of former high school buildings
Timeline
Dates from the published record
-
13 May 2024
Received by Wigan
-
6 Jun 2024
Validated
Checked as complete and ready for consideration.
-
22 Nov 2024
Decision issued: Approved with Conditions
-
7 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
5 later applications on the register refer to this one:
-
A/26/101612/CON Decided
Central Park Montrose Avenue Wigan WN5 9XL
Condition Discharge application to PART discharge Condition No.4 (CEMP - Works Programme and Site Hours) in respect of approved application A/24/97281/MAJPSI
-
A/26/101617/CON Awaiting decision
Central Park Montrose Avenue Wigan WN5 9XL
Condition Discharge application to discharge Condition No.29 (CT&EMP - Phase 3) in respect of approved application A/24/97281/MAJPSI
-
A/26/101364/CON Awaiting decision
Central Park Montrose Avenue Wigan WN5 9XL
Condition Discharge application to discharge Condition No.5 (Construction & Environment Management Plan - Phase3) in respect of approved application A/24/97281/MAJPSI
-
A/26/101214/CON Awaiting decision
Central Park Montrose Avenue Wigan WN5 9XL
Condition Discharge application to PART discharge Condition No.10 (Contamination) and Condition No.11 (Contamination) and to FULLY discharge Condition No.3 (Materials) in respect of approved application A/24/97281/MAJPSI
-
A/25/099037/CON Decided
Central Park Montrose Avenue Wigan WN5 9XL
Condition Discharge application to Part Discharge Condition 10.1 (Contamination) and Condition 12.1 (Gas Migration) and to Fully Discharge Condition 20 (Hard and Soft Landscaping) and Condition 21 (Hard and Soft Landscaping) in respect of application A/24/97281/MAJPSI
Who's behind it
Company information only, from the register and Companies House
Michael Hyde and Associates Ltd Agent, registered in Bolton
Liquidation · incorporated 1974 · Bolton
29 applications on PlanIndex · across 6 councils · 93% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordWigan Council - Places Directorate Applicant
2 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
126 documents on file for this application
- A-24-97281
- A.24.97281.MAJPSI Web DN
- 2024-11-08 Submitted Drawings List
- 1WG02-MHA-SA-ZZ-DR-A-01014-S2-P12_BoundaryTreatmentPlan
- 1WG02-MHA-SA-ZZ-DR-A-01013-S2-P01_WorksPhasesOverviewForPlanning
- 1WG02-MHA-SA-ZZ-DR-A-01004-S3-P14_SiteProposedBlockPlan
- From agent revisions Rec 8-11-24
- From agent revised phasing and draft conditions 4-11-24
- GMEU 25-10-24
- GMEU 1-7-24
- 1WG02-MHA-SA-ZZ-DR-A-90020-S2-P04_ProposedSubStationLayout
- UU Reference Number 03950478
- 1WG02-MHA-SA-ZZ-DR-A-01104-S2-P10_BoundaryTreatmentPlan
- 1WG02-MHA-SA-ZZ-DR-A-01004-S3-P13_SiteProposedBlockPlan
- 1WG02-MHA-SA-ZZ-DR-A-01008-S3-P05_SiteVehicleTracking
- 2024-08-21 Drawing List
- 2024-08-15 Drawing List
- 1WG02-MHA-SA-ZZ-DR-A-01004-S3-P13_SiteProposedBlockPlan
- LLFA Final comments 6-8-24
- Trees 24-7-24
- Noise further clarification 6-8-24
- Drainage hydraulic calcs further info 6-8-24
- EP
- 1WG02-MHA-SA-ZZ-DR-A-04002-S2-P01_MontroseAvenueStreetScene
- 2024-07-25 Boundary Treatment Brief
- HSR-AJP-XX-00-DR-C-0420-P01 PRELIMINARY MEWP AREA PLAN & CONSTRUCTION DETAILS
- 1WG02-MHA-SA-ZZ-DR-A-01104-S2-P09_BoundaryTreatmentPlan
- 1WG02-MHA-SA-ZZ-DR-A-90020-S3-P03_ProposedSubStationLayout
- 1WG02-MHA-B0-ZZ-DR-A-03001-S2-P08_B0 GA Southern Elevations
- 1WG02-MHA-B0-ZZ-DR-A-03003-S2-P08_B0 GA Northern Elevations
- 1WG02-MHA-B0-ZZ-DR-A-03002-S2-P07_B0 GA Eastern Elevations
- 1WG02-MHA-SA-ZZ-DR-A-01004-S2-P12_SiteProposedBlockPlan
- Transport 23-7-24
- 1WG02-MHA-SA-ZZ-DR-A-01104-S2-P08_BoundaryTreatmentPlan
- 1WG02-MHA-B0-00-DR-A-02002-S2-P10_B0 GA Floor Plan
- 1WG02-MHA-B0-ZZ-DR-A-03004-S2-P09_B0 GA Western Elevations
- 1WG02-MHA-B0-ZZ-DR-A-02000-S2-P05_B0 GA Isometric Views
- 1WG02-MTW-SA-ZZ-DR-L-10001-Rev P02-Soft Landscape Proposals, Hope School & College
- 1WG02-MTW-SA-ZZ-SH-L-30001-P02 Outline 5 Year Landscape Maintenance Schedule Hope School ( 19.06.24)
- 1WG02-MTW-SA-ZZ-SH-L-30001-P02 5 Year Landscape MaintSchedule
- From agent - Consultee Feedback - 12-7-24
- 1G02-MTW-SA-ZZ-SP-L-20001-P02 Outline Planting Specification, Hope School & College ( 19.06.24)
- Re_ A_24_97281_MAJPSI Untd Utilities Response
- A_24_97281_MAJPSILA Trees response
- LLFA
- Transport Policy 97281
- Response_ A_24_97281_MAJPSI - CENTRAL PARK_ MONTROSE EA Response
- Coal Authority 97281
- GMFRS - CENTRAL PARK MONTROSE AVENUE GMF Response
- EP Landfill
- 1WG02-MHA-SA-ZZ-DR-A-80101-S2-P01_PrimarySchoolFixedPlaygroundEquipment
- 1WG02-RDG-B7-00-DR-M-571000 Ventilation Design B7
- PB0317-5231 Appendix 3 Tree Survey Plan
- 1WG02-RDG-B0-XX-DR-M-57001 Ventilation Design B0
- 1WG02-MHA-B0-00-DR-A-36001-S0-P01_DoubleClassroomCanopyTypicalArrangement
- 1WG02-MHA-SA-ZZ-DR-A-01009-S2-P02_SiteCarParkingStrategy
- 4202-01 Transport Assessment
- WHB-PRA-022023 Preliminary Bat Roost Report
- HSR-AJP-XX-00-RP-C-3000_P02 - FRA & DRAINAGE STRATEGY REPORT - PART 3 of...
- Full application form-completed_Redacted
- 1WG02-MHA-B7-RF-DR-A-02003-S2-P04_B7GARoofPlan
- 1WG02-MHA-B0-ZZ-DR-A-04001-S2-P04_B0GASections
- 1WG02-MHA-SA-ZZ-DR-A-01002-S2-P04_SiteExistingBlockPlan
- ZG-DWG-0002274936-EX2-R03-090423 External Lighting Assessment
- 075409-CUR-00-XX-RP-GE-001-S2-P01 Ground Investigation Report
- 1WG02-MHA-SA-ZZ-DR-A-90010-S2-P1_BinandCycleStorePropsoal
- 1WG02-MHA-B7-ZZ-DR-A-03003-S2-P04_B7GANorthernElevation
- 1WG02-MHA-SA-ZZ-DR-A-01012-S2-P03_SiteClearanceBlockPlan
- HSR-AJP-XX-00-DR-C-0401-P02 PRELIMINARY LEVELS PLAN X EXISTING LEVELS PLAN
- WHB-PRA-062020 Preliminary Bat Roost Report
- HSR-AJP-XX-00-RP-C-3000_P02 - FRA & DRAINAGE STRATEGY REPORT - PART 1 of...
- 1WG02-MHA-B4-ZZ-DR-A-02001-S2-P04_B4GAExistingFloorPlans
- 1WG02-RDG-B4-00-DR-M-571000 Ventilation Design B4 Level 0
- 1WG02-MHA-B0-00-DR-A-36002-S2-P01_SingleClassroomCanopyTypicalArrangement
- 1WG02-MHA-ZZ-ZZ-RP-A-DB001-S2-P02_DesignAccessStatement
- 1WG02-RDG-B7-RF-DR-M-501000 Ventilation Design B7 Roof
- PB0317-5231 Appendix 4 Tree Constraints Plan
- 1WG02-MHA-B4-ZZ-DR-A-03101-S2-P04_B4GASouthernElevations
- 1WG02-MHA-B4-ZZ-DR-A-02101-S2-P06_B4GAProposedFloorPlans
- 6548r2 - Air Quality Assessment
- 1WG02-MHA-B0-ZZ-DR-A-03004-S2-P08_B0GAWesternElevations
- NP-009164 Noise Impact Assessment
- HSR-AJP-XX-00-DR-C-1530 Standard External Works Details
- HSR-AJP-XX-00-DR-C-0900 Drainage Strategy
- 1WG02-MHA-B7-ZZ-DR-A-03004-S2-P06_B7GAWesternElevation
- 1WG02-MHA-B7-00-DR-A-02000-S2-P04_B7GAIsometricViews
- 1WG02-MHA-B7-ZZ-DR-A-04001-S2-P03_B7GASections
- CEMP Construction and Environmental Management Plan
- 1WG02-MHA-SA-ZZ-DR-A-90020-S2-P01_ProposedSubStationLayout
- 1WG02-MHA-B0-ZZ-DR-A-02000-S2-P04_B0GAIsometricViews
- 1WG02-RDG-B4-01-DR-M-571000 Ventilation Design B4 Level 1
- 1WG02-MHA-SA-ZZ-DR-A-01001-S2-P02_LocationPlan
- 1WG02-RDG-B0-RF-DR-M-50001 Ventilation Design B0 Roof
- 1WG02-MHA-B7-00-DR-A-02002-S2-P05_B7GAFloorPlan
- PB0317-5231 Appendix 2 Hope Central Park Wigan treed ata BS5837
- BNG Hope School - Statutory Biodiversity Metric Condition Assessments
- 1WG02-MHA-SA-ZZ-DR-A-01008-S2-P03_SiteVehicleTracking
- PB0317-5231 Appendix 1 Site Location
- 1WG02-MHA-B4-ZZ-DR-A-02010-S2-P04_B4GAExistingRoofPlan
- WHB-PRA-082023 Preliminary Bat Roost Report
- HSR-AJP-XX-00-RP-C-3000_P02 - FRA & DRAINAGE STRATEGY REPORT - PART 2 of...
- BNG Hope School The Statutory Biodiversity Metric Calculation Tool
- 1WG02-MHA-B7-ZZ-DR-A-03002-S2-P05_B7GAEasternElevation
- 1WG02-MHA-B0-00-DR-A-02002-S2-P08_B0GAFloorPlan
- 1WG02-MHA-B0-ZZ-DR-A-03001-S2-P07_B0GASouthernElevations
- 1WG02-MHA-SA-ZZ-DR-A-04001-S2-P3_ProposedSiteSections
- 1WG02-MHA-B7-ZZ-DR-A-03001-S2-P05_B7GASouthernElevation
- 1WG02-MHA-SA-ZZ-DR-A-01104-S2-P06_SiteBoundaryTreatmentPlan
- HSR-AJP-XX-00-DR-C-0400-P05 PRELIMINARY LEVELS PLAN
- BNG Report Central Park Campus May 2024
- 1WG02-MHA-B4-ZZ-DR-A-03103-S2-P04_B4GAEasternAndWesternElevations
- 1WG02-MHA-B4-ZZ-DR-A-02201-S2-P04_B4GADemolitionPlans
- PB0317-5231 Tree Protection Plan Proposed
- 1WG02-MHA-B0-ZZ-DR-A-03003-S2-P07_B0GANorthernElevations
- 1WG02-MHA-SA-ZZ-DR-A-01003-S2-P03_SiteDemolitionsBlockPlan
- 1WG02-MHA-B4-ZZ-DR-A-03104-S2-P03_B4GADemolitionElevations
- A.24.97281.MAJPSI LA Wigan Observer 18 June 2024
- 1WG02-MHA-B0-RF-DR-A-02003-S2-P05_B0GARoofPlan
- 1WG02-MHA-SA-ZZ-DR-A-01005-S2-P02_SiteExistingTopographyAndBuildingHeights
- PB0317-5231 Arboricultural Impact Assessment
- 1WG02-MHA-SA-ZZ-DR-A-01011-S2-P01_TemporaryAccessRoad
- 1WG02-MHA-B4-ZZ-DR-A-03102-S2-P04_B4GANorthernElevations
- 1WG02-MHA-SA-ZZ-DR-A-01004-S2-P09_SiteProposedBlockPlan
- 1WG02-MHA-B0-ZZ-DR-A-03002-S2-P07_B0GAEasternElevations
- 1WG022-MHA-ZZ-ZZ-SH-A-DB004-P3_PlanningSubmissionDocuments
- PB0317-5231 Root Protection Calculations
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Wigan granted permission on 22 November 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Central Park Montrose Avenue Wigan WN5 9XL
86% historically approved · decision due ~13 Oct
Condition Discharge application to discharge Condition No.5 (Construction & Environment Management Plan - Phase3) in respect of approved application A/24/97281/MAJPSI
Awaiting decision Conditions 7 docs -
Central Park Montrose Avenue Wigan WN5 9XL
81% historically approved · decision due ~21 Sep
Installation of temporary modular classroom block on the multi use games area
Awaiting decision Full applications 10 docsMajor scheme -
Central Park Montrose Avenue Wigan WN5 9XL
86% historically approved · decision due ~8 Sep
Condition Discharge application to PART discharge Condition No.10 (Contamination) and Condition No.11 (Contamination) and to FULLY discharge Condition No.3 (Materials) in respect of approved application A/24/97281/MAJPSI
Awaiting decision Conditions 7 docs -
Central Park Montrose Avenue Wigan WN5 9XL
Condition Discharge application to PART discharge Condition No.4 (CEMP - Works Programme and Site Hours) in respect of approved application A/24/97281/MAJPSI
Decided -
Central Park Montrose Avenue Wigan WN5 9XL
86% historically approved · decision due ~2 Dec
Condition Discharge application to discharge Condition No.29 (CT&EMP - Phase 3) in respect of approved application A/24/97281/MAJPSI
Awaiting decision -
Central Park Montrose Avenue Wigan WN5 9XL
Condition Discharge application to Part Discharge Condition 10.1 (Contamination) and Condition 12.1 (Gas Migration) and to Fully Discharge Condition 20 (Hard and Soft Landscaping) and Condition 21 (Hard and Soft Landscaping) in respect of application A/24/97281/MAJPSI
Decided Conditions 25 docs
Other full applications
In Wigan
-
A/26/101008/FULL Refused
2 Mabel Street Wigan WN5 9EJ
Change of use from a 4 bed dwelling house (Use Class C3) into a 4 bed HMO for 4 occupants (Use Class C4) and installation of permanent vehicle crossing
-
A/25/098671/FULL Granted
19 Sefton Road Wigan WN3 6QU
Change of use to create 1 dwelling and 2 flats (Use Class C3) together with dormers to rear, replacement windows and external render to all elevations
-
A/26/101007/FULL Granted
23 Wenlock Road Leigh WN7 3LN
Erection of detached dwelling with associated parking, landscaping and extension to existing driveway following demolition of existing dwelling and garage
-
A/26/101122/FULL Granted
162 - 164 Manchester Road Ince Wigan WN2 2EA
Subdivision of existing retail unit (Use Class E) to create two retail units at ground floor (Use Class E) and one retail unit at first floor (Use Class E) together with new shop fronts, installation of new window openings at first floor to rear and new entrance to rear. Retrospective application
-
A/22/93798/FULL Granted
The New Fleece Hotel 9 - 11 Warrington Road Ashton-In-Makerfield Wigan WN4 9PL
Two storey rear extension to create 2 residential apartments comprising a 1 bed studio and a 1 x 3 bedroom unit, together with rooflights to front elevation