Skip to content
PlanIndex Get alerts
Menu

Planning application

Liptrot Farm Sandy Lane Lowton Warrington WA3 1BA

Awaiting decision Wigan A/24/098053/FULL Full Details

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of an agricultural building

As published by the council, reference A/24/098053/FULL

Application record

Reference
A/24/098053/FULL
Type
Full Details
Status
Registered
Received
21 Oct 2024
Validated
30 Jan 2025
Ward
Lowton East
Parish
Golborne And Lowton Township
Postcode
WA3 1BA

Timeline

Dates from the published record

  1. 21 Oct 2024

    Received by Wigan

  2. 30 Jan 2025

    Validated

    Checked as complete and ready for consideration.

  3. 24 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 27 March 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Wigan took a median of 87 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Wigan for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Liptrot Farm Sandy Lane Lowton Warrington WA3 1BA

    A/24/098235/FULL Submitted 27 Nov 2024 140m away

    79% historically approved · decision due ~27 Mar

    Agricultural building

    Awaiting decision Full applications 16 docs
  • 5 Green House Close Lowton Warrington WA3 1AD

    A/21/91724/HH Submitted 25 May 2021 161m away

    To extend dwelling - single storey flat roofed rear extension

    Granted Householder Extension 7 docs
    Small domestic
  • 20 Chapel Walk Lowton Warrington WA3 1EE

    A/26/101186/HH Submitted 3 Jul 2026 267m away

    86% historically approved · decision due ~11 Sep

    Single storey rear extension together with external alterations to fenestration including render to all elevations

    Decided Householder Extension Windows or glazing 5 docs
    Small domestic
  • 5 St Nicholas Road Lowton Warrington WA3 1DY

    A/21/91615/FULL Submitted 18 May 2021 275m away

    Erection of detached dwellinghouse following the demolition of the existing single storey side extension at 5 St Nicholas Road, together with the sub-division of garden areas and the installation of associated access and hard and soft landscaping

    Granted Full applications Extension Demolition 15 docs
    Small domestic
  • Unit D3A Walter Leigh Way Moss Industrial Estate Leigh WN7 3PT WN7 3PT

    A/26/101081/CON Submitted 15 Jun 2026 366m away

    83% historically approved · decision due ~10 Aug

    Condition Discharge application to discharge Condition No.3 (Gas Risk Assessment), Condition No.4 (Land Contamination Risk Assessment), Condition No.6 (Landscaping Details), Condition No.10 (Construction, Highway, Environmental Management Plan), Condition No.11 (Construction, Training and Employment Management Plan), Condition No.12 (Finished Floor Levels), Condition No.14 (Wall Mounted Cycle Hangers), Condition No.15 (Waste and Recycle Bins), Condition No.16 (Materials Schedule) and Condition No.20 (Wall Mounted EV Charging Points) in respect of approved application A/24/97357/MAJOR

    Decided 18 docs
  • A7 Walter Leigh Way Moss Industrial Estate Leigh WN7 3PT

    A/21/91714/NMAS Submitted 3 Jun 2021 366m away

    Working Amendment application for previously approved application A/07/70201 - To erect 2no. blocks of industrial units comprising of 6no. in total for B1, B2 & B8 purposes, together with laying out of 38no. associated car parking spaces

    Withdrawn Amendments 4 docs

In Wigan

  • 65B Church Street Standish Wigan WN6 0JT

    Erection of a two storey/single storey building to be used as a drinking establishment (Sui Generis), with external works, following demolition of existing pharmacy building and one garage

    19 Feb 2026 Full applications
  • A/26/101398/FULL Awaiting decision

    Land At 287 Chaddock Lane Worsley Manchester M28 1DU

    Change of use of land, siting of 2 timber clad containers and erection of wooden chalet to be used as café/food outlet (Use Class E) together with associated parking area, 2.4m high gates and new access from Chaddock Lane

    20 Aug 2026 Full applications
  • Methodist Church 32B Wigan Road Leigh WN7 5AH

    Creation of new internal first floor level and associated internal and external alterations to include replacement windows and refurbishment of existing, installation of new glazed doors with shutters thereto

    24 Jul 2025 Full applications
  • 31 Wigan Lane Wigan WN1 1XR

    Change of use of first and second floors from residential (Use Class C3) to office accommodation (Use Class E), retaining aesthetics clinic (Use Class E) at ground floor

    23 Mar 2026 Full applications
  • Carpet Wizard 436 Ormskirk Road Wigan WN5 9DF

    New openings at ground and first floor to front and sides, canopy to front and render to all elevations

    5 Jan 2026 Full applications