Planning application
Land North Of Mosley Common North Of The Guided Busway Tyldesley
Works: New dwelling Extension Major scheme
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Hybrid Planning Application on land to the north of the guided busway ('Northern Parcel') - this comprises: (i) Full planning permission for a multi-phased, severable residential development, located in the North-West of the site (Use Class C2/C3), vehicular access off Mort Lane, temporary and permanent public open space, children's play space, and the provision of new and enhancements to existing footpaths and cycleways, and, where applicable, the re-routing, upgrading and extension of the Public Rights of Way network. (ii) Outline planning permission (with all matters reserved apart from an access point off City Road) for a multi-phased, severable residential development (Use Class C2/C3), a new bus stop and travel hub on the Guided Busway, a community hub (Use Class E, F1(a-g), F2(a-d), sui generis comprising drinking establishments with expanded food provision and hot takeaways), new parkland, public open space and children's play space, outdoor sports facilities and the provision of new and enhancements to existing footpaths and cycleways and, where applicable, the re-routing, upgrading and extension of the Public Rights of Way network and the creation of new Public Rights of Way
As published by the council, reference A/23/95156/MAJES
Application record
- Reference
- A/23/95156/MAJES
- Type
- Major with Env Statement
- Status
- Decided
- Decision
- Granted As published: Approved with Conditions
- Received
- 21 Feb 2023
- Validated
- 21 Feb 2023
- Decided
- 2 Oct 2024
- Ward
- Tyldesley And Mosley Common
- Decision by
- Committee Decision
Site history
Applications at this address on the Wigan register
This site has had 19 applications since 2023: 1 approved, 0 refused.
-
A/26/101646/CON Awaiting decision
Land North Of Mosley Common North Of The Guided Busway Tyldesley
Condition Discharge application to discharge Condition No.9 (Ecological Enhancements) in respect of approved application A/25/099009/RMMAJ
-
A/26/101526/CON Decided
Land North Of Mosley Common North Of The Guided Busway Tyldesley
Condition Discharge application to discharge Condition No.24 - Phases 2, 4, 5 and 6 (Public Wayfinding Signage) in respect of approved application A/25/098937/VARMAJ
-
A/26/101196/CON Withdrawn
Land North Of Mosley Common North Of The Guided Busway Tyldesley
Condition Discharge application to PART discharge Condition No.53 Parts I to V Phase 2, 4, 5 and 6 (CEMP and HMP) in respect of approved application A/25/098937/VARMAJ
-
A/26/101185/CON Decided
Land North Of Mosley Common North Of The Guided Busway Tyldesley
Condition Discharge application to discharge Condition No.14 (Cycle & Refuse Storage) and Condition No.44 (Parking) in respect of approved application A/25/098937/VARMAJ
-
A/26/101141/RMMAJ Awaiting decision
Land North Of Mosley Common North Of The Guided Busway Tyldesley
Application for the approval of reserved matters (with details of appearance, landscaping, layout and scale) pursuant to ref. A/25/098937/VARMAJ for the erection of 207 dwellings with associated landscaping, public open space, LEAP, internal access roads, car parking and other associated works
-
A/26/101069/CON Decided
Land North Of Mosley Common North Of The Guided Busway Tyldesley
Condition Discharge application to discharge Condition No.14 (Cycle and Refuse Storage - Phase 2) and Condition No.44 (Car Parking - Phase 2) in respect of approved application A/25/098937/VARMAJ
-
A/26/101055/CON Decided
Land North Of Mosley Common North Of The Guided Busway Tyldesley
Condition Discharge application to discharge Condition No.10 (Piling Risk Method Statement - Phases 4, 5 and 6) in respect of approved application A/25/098937/VARMAJ
-
A/26/101056/CON Decided
Land North Of Mosley Common North Of The Guided Busway Tyldesley
Condition Discharge application to discharge Condition No.16 - Phase 2 (Drainage), Condition No.30 - Phase 2 (On-Site Open Space and Play Equipment) and Condition No.60 - Phase 2 (Habitat Management and Monitoring Plan) in respect of approved application A/25/098937/VARMAJ
-
A/26/101013/CON Decided
Land North Of Mosley Common North Of The Guided Busway Tyldesley
Condition Discharge application to discharge Condition No.9 - Phases 4, 5 and 6 (Tree Protection Measures) in respect of approved application A/25/098937/VARMAJ
-
A/26/100949/CON Decided
Land North Of Mosley Common North Of The Guided Busway Tyldesley
Condition Discharge application to discharge Condition No.57 Phase 2, 4, 5 and 6 (Invasive Species Management Plan) in respect of approved application A/25/098937/VARMAJ
Timeline
Dates from the published record
-
21 Feb 2023
Received by Wigan
-
2 Oct 2024
Decision issued: Approved with Conditions
-
24 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Peel L And P Investments North Limited Applicant, registered in Manchester
Active · incorporated 1923 · Manchester
2 applications on PlanIndex · across 2 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
379 documents on file for this application
- A.25.98658.NMAS & Appendix
- Section 106 Agreement 26.09.2024_Redacted
- 95156 Web DN
- PCU Response 03.05.24_Redacted
- 240208-Article 31_R
- 1_Redacted
- Binder 2_Redacted 95156
- Binder 1_Redacted 95156
- RE_ Planning Application Consultation A_23_95156_MAJES minerals_Redacted
- TfGM Final
- Consultation Response _A23_95156MAJES(30112023)
- PROW Comments
- A2395156 - Mosley Common - C
- A_23_95156_MAJES URN_2016_0561_PLA_09_Redacted GMP
- A_23_95155_A_23_95156 (Final Comments)
- 95156 January 24
- HSL-240102093334-266-FinalOutcome
- RE_ 95156_95155 - Mosley Common - Redacted
- RE_ 95155_95156 - Land North of Mosley Common BNG Opportunities_Redacted
- A_23_95156_MAJES (north) and A_23_95155_OUTMES (south) - Mosley Common
- Urban and Landscape Design Comments A.23.95156.MAJES
- Coal Authority Response 23-11-2023 100641926
- conservation
- 458381 Natural England Response
- 95156 December 23
- 95156 December 23 EPROT Response
- UNKNOWN
- FW_ Planning Application Consultation A_23_95156_MAJES Minerals and Waste Response
- UNKNOWN
- UNKNOWN
- Biodiversity Metric 3.1 Phase 1 Site 20231027
- Environment Agency Response to A_23_95156_MAJES
- 8794.011 V4.0 BNG Assessment
- FW_ National Highways Response - A_23_95155_OUTMES & A_23_95156_MAJES
- A_23_95156_MAJES 3RD RECONSULTATION_ TCA Response
- National Highways Response - A_23_95155_OUTMES & A_23_95156_MAJES
- wigan A_23_95156_MAJES Land North Of Mosley Common Ntwk Rail Response
- Re_ Planning Application Consultation A_23_95156_MAJES HSE Response
- 15-930-R4-2 - Mosley Common - Remediation and Enabling Works Strategy - October 2023
- 01941_Mosley Common_PP_N02_Land Use & Green Infrastructure_P2
- 8794.01.001 Mosley Common - Arboricultural Impact Assessment (V.3 Oct 2023)
- NS018_SL_010a - Phase 1 Floor Plans - 30 October 2023
- NS018_SL_012a - Phase 1 Overall Site Layout - 30 October 2023
- NS018_Mosley Common Wigan - Phase 1 DAS Addendum - 2 November 2023 Reduced
- NS018_SL_101f - Phase 1 Coloured Site Layout - 01 November 2023
- Appendix 1 Updated Application, Supplementary and Parameter Plans
- NS018_SL_002a - Phase 1 S38 Boundary - 30 October 2023
- NS018_SL_002a - Phase 1 S38 Boundary - 30 October 2023
- 01941_Mosley Common_PP_N01_Access_P2
- 01941_Mosley Common_S_05_Proposed Demolition_P2
- M21015 - 06 TN
- 01941_Mosley Common_Design Code_Part 1
- NS018_SL_013 - Phase 1 Garden Area Plan - 30 October 2023
- 01941_Mosley Common_S_02_Topography_P2
- 01941_Mosley Common_PP_N03_Building Heights_P2
- NS018_SL_011a - Phase 1 Floor Plans - 30 October 2023
- 100 DRAINAGE STRATEGY-LAYOUT 100-1J
- NS018_SL_003a - Phase 1 Surface Materials - 30 October 2023
- 01941_Mosley Common_S_06_EIA Study Area Boundary_P2
- REFA - FULL DRAINAGE STATEMENT REV C
- NS018_SL_005a - Phase 1 Refuse Storage - 30 October 2023
- M21015 - 05A TN Highways TTHC (311023)
- NS018_SL_007a - Phase 1 Building Heights - 30 October 2023
- Mosley Common - Energy Statement - FHS
- 101 PROPOSED FLOOR AND ROAD LEVELS-101-1E
- Mosley Common - Planning Statement Addendum November 2023
- NS018_SL_009a - Phase 1 Floor Plans - 30 October 2023
- G8794.037 TEP Proposed Masterplan and Wildlife Site Information
- Appendix 3 1030279-CDL-XX-XX-RP-Y-45200_P04 - Technical Appendix 11.1
- 1030279-CDL-XX-XX-RP-AS-45220-P03 Noise impact assessment
- NS018_SL_004a - Phase 1 Boundary Treatments Plan - 30 October 2023
- 01941_Mosley Common_Phasing Plan_SK_01_Rev H_231103
- 01941_Mosley Common_S_01_Application Boundary_P2
- Hybrid Application Form 13_11_2023
- P22-1386_EN_0002_D Phase 1 Landscape Masterplan 2023 11 01.sfs
- NS018_SS_101a - Phase 1 - Street Scenes 1 - 01 November 2023
- 01941_Mosley Common_S_07_Northern Application Boundary_P2
- 01941_Mosley Common_S_04_Key Features and Easements_P2
- 8794.014 TEP Response to LWT Comments Ecological Technical Note
- NS018_SL_006a - Phase 1 Building Materials Plan - 18 October 2023
- PEEZ3007 Mosley Common - Supplementary Information Note A 131123 (1)
- Mosley Common - Covering Letter - Hybrid Application_Revised Information 13_11_2023
- NS018_SS_102a - Phase 1 - Street Scenes 2 - 01 November 2023
- 01941_Mosley Common_Design Code_Part 3
- NS018_SL_001k - Phase 1 Site Layout - 25 October 2023
- Mosley Common - Planning Statement Addendum November 2023
- House Type Pack - 30 October 2023
- 01941_Mosley Common_Design Code_Part 2
- 01941_Mosley Common_S_03_Public Rights of Way_P2
- A_23_95156_MAJES RECONSULTATION_ LAND NORTH OF MOSLEY COMMON_ TCA Response
- UNKNOWN
- Re_ A_23_95156_MAJES United Utilitites response
- M21015 - 04C TN (low res)
- UNKNOWN
- A2395156MAJES Applicant Response to Consultee Comments
- FLOW SW CALCULATIONS - NORTH NETWORK
- FLOW SW CALCULATIONS - SOUTH NETWORK
- CIS - Hybrid Application - North of Mosley Common_Northern Parcel
- 100 DRAINAGE STRATEGY-LAYOUT 100-1H
- Mosley Common - Applicant Response to Coal Authority_e3p
- 8794.013v2 TEP Response to Consultee Comments Ecological Technical Note
- National Highways Response - A_23_95155_OUTMES & A_23_95156_MAJES
- Salford Council response 81310_LPACON_Letter
- FW_ A_23_95156_MAJES
- Planning application_ A_23_95156_MAJES & A_23_95155_OUTMES
- RE_ Planning Application Consultation A_23_95156_MAJES
- PEEZ3007 MC ES V3 Non-Technical Summary B 210223
- PEEZ3007 Chapter 16 Summary of ES and Schedule of Mitigation D 210223
- UNKNOWN
- UNKNOWN
- UNKNOWN
- Biodiversity Metric 3.1
- Biodiversity Metric 3.1
- Drainage Strategy and Maintenance Plan
- Natural Capital Assessment
- Natural England Consultation Response to A_23_95156_MAJES
- FW_ _EXTERNAL_ Planning Application Consultation A_23_95156_MAJES
- A.23.95156.MAJES Leigh Journal 09.03.2023
- Covering Letter_Redacted
- Hybrid Application Form (28 02 23)_Redacted
- Sustainability, Energy & Carbon Reduction Strategy
- PEEZ3007 MC ES V1 Figure 7.8 National Landscape Character
- PEEZ3007 MC ES V1 Chapter 7 Landscape and Visual B 170223
- Health Impact Assessment
- PEEZ3007 MC ES V1 Figure 14.6 Water Constraints (Fluvial and Tidal Flood Risk)
- NS018_SL_003 - Phase 1 Surface Materials - 26 January 2023
- House Type Pack - 23 February 2023
- Design and Access Statement (Part 1 of 11)
- PEEZ3007 MC ES V2 Appendix 13.4 Desk Based Preliminary Risk Assessment (Part 15 of 25)
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A3.3 (Part 5 of 5)
- NS018_SS_102 - Street Scenes 2 - 26 January 2023
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A3.2 (Part 16 of 23)
- PEEZ3007 MC ES V2 Appendix 8.9 CIEEM and Ecological Impact Assessment
- PEEZ3007 MC ES V2 Appendix 13.5 Desk Based Coal Mining Risk Assessment (Part 10 of 11)
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A3.2 (Part 4 of 23)
- PEEZ3007 MC ES V1 Chapter 13 Ground Conditions and Contamination B 200223
- PEEZ3007 MC ES V2 Appendix 13.4 Desk Based Preliminary Risk Assessment (Part 9 of 25)
- PEEZ3007 MC ES V1 Chapter 16 Summary of ES and Schedule of Mitigation B 210223
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A3.2 (Part 7 of 23)
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A3.2 (Part 22 of 23)
- NS018_VS_007 - View 7 - 23 January 2023
- PEEZ3007 MC ES V2 Appendix 14.1 Legislation and Policy
- PEEZ3007 MC ES V2 Appendix 13.1 Phase I Geoenvironmental Site Assessment
- PEEZ3007 MC ES V2 Appendix 13.2 Phase II Geoenvironmental Site Assessment (Part 5 of 7)
- PEEZ3007 MC ES V2 Contents Page
- Remediation and Enabling Works Strategy (Part 1 of 3)
- PEEZ3007 MC ES V1 Figure 14.4 Water Constraints (Groundwater Source Protection Zone (England))
- PEEZ3007 MC ES V1 Chapter 6 Socio-Economics and Human Health B 200223
- PEEZ3007 MC ES V2 Appendix 13.4 Desk Based Preliminary Risk Assessment (Part 16 of 25)
- NS018_SL_001g - Phase 1 Site Layout - 26 January 2023
- Design and Access Statement (Part 6 of 11)
- PEEZ3007 MC ES V1 Figure 4.2 Public Rights of Way (01941_S_03-P1)
- PEEZ3007 MC ES V1 Chapter 3 EIA Study Area Context B 200223
- PEEZ3007 MC ES V1 Figure 13.1 Location of the Former Opencast Mines within Phase 1
- Archaeological Desk-Based Assessment (Part 1 of 2)
- PEEZ3007 MC ES V1 Figure 4.7 Parameter Plan Building Heights (01941_PP_03-P1)
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A3.2 (Part 9 of 23)
- NS018_VS_003 - View 3 - 23 January 2023
- Section 106 Agreement - Drafts Heads of Term
- PEEZ3007 MC ES V2 Appendix 10.1 Legislative and Planning Policy Context
- PEEZ3007 MC ES V2 Appendix 13.3 Ground Gas Addendum Report
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report F1.1
- PEEZ3007 MC ES V2 Appendix 13.4 Desk Based Preliminary Risk Assessment (Part 10 of 25)
- PEEZ3007 MC ES V2 Appendix 13.4 Desk Based Preliminary Risk Assessment (Part 19 of 25)
- PEEZ3007 MC ES V1 Figure 7.7 Access and Water
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A3.2 (Part 14 of 23)
- Framework Travel Plan
- Design and Access Statement (Part 10 of 11)
- PEEZ3007 MC ES V2 Appendix 6.1 Socio Economic and Human Health Data and Policy Review
- PEEZ3007 MC ES V2 Appendix 13.5 Desk Based Coal Mining Risk Assessment (Part 3 of 11)
- 01941_Mosley Common_S_06_EIA Study Area Boundary_P1
- Performance Specification for the Consolidation of Abandoned Coal Minings (Part 2 of 2)
- PEEZ3007 MC ES V2 Appendix 13.5 Desk Based Coal Mining Risk Assessment (Part 5 of 11)
- 01941_Mosley Common_S_01_Application Boundary_P1
- Design Code (Part 1 of 3)
- PEEZ3007 MC ES V1 Figure 11.2 Noise and Vibration Sensitive Receptors
- PEEZ3007 MC ES V2 Appendix 13.2 Phase II Geoenvironmental Site Assessment (Part 2 of 7)
- Statement of Community Involvement
- PEEZ3007 MC ES V1 Chapter 8 Biodiversity B 200223
- PEEZ3007 MC ES V2 Appendix 13.4 Desk Based Preliminary Risk Assessment (Part 24 of 25)
- NS018_SL_009 - Phase 1 Ground Floor Plans - 14 February 2023
- PEEZ3007 MC ES V2 Appendix 13.5 Desk Based Coal Mining Risk Assessment (Part 8 of 11)
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A3.2 (Part 13 of 23)
- PEEZ3007 MC ES V1 Chapter 11 Noise and Vibration B 200223
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report F3.3 - 3.8
- 01941_Mosley Common_S_03_Public Rights of Way_P1
- Transport Assessment (Part 1 of 3)
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A3.2 (Part 23 of 23)
- PEEZ3007 MC ES V2 Appendix 2.5 Agricultural Land Classification Report
- Phase 1 Landscape Masterplan
- Landscape Design Code
- PEEZ3007 MC ES V2 Appendix 13.4 Desk Based Preliminary Risk Assessment (Part 23 of 25)
- Design and Access Statement (Part 2 of 11)
- PEEZ3007 MC ES V2 Appendix 7.2 Viewpoint Photographs
- PEEZ3007 MC ES V1 Contents Page
- PEEZ3007 MC ES V2 Appendix 13.4 Desk Based Preliminary Risk Assessment (Part 14 of 25)
- PEEZ3007 MC ES V1 Figure 14.7 Water Constraints (Surface Water Flood Risk)
- 01941_Mosley Common_S_02_Topography_P1
- PEEZ3007 MC ES V1 Figure 7.9 City & Borough Landscape Character
- Utility Feasibility Report
- NS018_SL_005 - Refuse Storage - 26 January 2023
- Archaeological Desk-Based Assessment (Part 2 of 2)
- PEEZ3007 MC ES V1 Figure 11.5 Grid Noise Map Night-time - With Through Route
- PEEZ3007 MC ES V2 Appendix 7.5 Verified Views
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A3.3 (Part 1 of 5)
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A3.2 (Part 5 of 23)
- NS018_VS_001 - View 1 - 23 January 2023
- Design and Access Statement (Part 4 of 11)
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A3.2 (Part 17 of 23)
- PEEZ3007 MC ES V1 Chapter 14 Flood Risk Drainage and Water Resources B 200223
- PEEZ3007 MC ES V1 Figure 4.5 Parameter Plan Access and Movement (01941_PP_01-P1)
- 01941_Mosley Common_PP_N01_Access_P1
- NS018_SS_101 - Street Scenes 1 - 26 January 2023
- PEEZ3007 MC ES V2 Appendix 10.6 References
- NS018_VS_005 - View 5 - 23 January 2023
- PEEZ3007 MC ES V2 Appendix 2.2 Scoping Opinion
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A3.2 (Part 15 of 23)
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A3.2 (Part 1 of 23)
- PEEZ3007 MC ES V2 Appendix 11.1 Noise and Vibration Technical Appendix
- Heritage Statement
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report F3.1
- PEEZ3007 MC ES V2 Appendix 13.2 Phase II Geoenvironmental Site Assessment (Part 1 of 7)
- Education Briefing Report
- Performance Specification for the Consolidation of Abandoned Coal Minings (Part 1 of 2)
- PEEZ3007 MC ES V1 Figure 7.5 Environmental Designations
- Materials Management Strategy (Part 1 of 2)
- PEEZ3007 MC ES V1 Chapter 4 Development Specification E 200223
- NS018_SL_010 - Phase 1 First Floor Plans - 26 January 2023
- PEEZ3007 MC ES V1 Figure 4.3 Key Features and Easements (01941_S_04-P1)
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A7.1
- PEEZ3007 MC ES V2 Appendix 13.4 Desk Based Preliminary Risk Assessment (Part 8 of 25)
- PEEZ3007 MC ES V2 Appendix 13.4 Desk Based Preliminary Risk Assessment (Part 2 of 25)
- PEEZ3007 MC ES V2 Appendix 13.4 Desk Based Preliminary Risk Assessment (Part 22 of 25)
- PEEZ3007 MC ES V1 Chapter 1 Introduction B 210223
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A3.2 (Part 19 of 23)
- Materials Management Strategy (Part 2 of 2)
- NS018_SL_012 - Phase 1 Overall Site Layout - 14 February 2023
- Transport Assessment (Part 2 of 3)
- PEEZ3007 MC ES V1 Figure 11.3 Grid Noise Map Daytime - With Through Route
- Design and Access Statement (Part 3 of 11)
- PEEZ3007 MC ES V2 Appendix 13.2 Phase II Geoenvironmental Site Assessment (Part 4 of 7)
- PEEZ3007 MC ES V2 Appendix 13.5 Desk Based Coal Mining Risk Assessment (Part 4 of 11)
- PEEZ3007 MC ES V1 Figure 11.6 Grid Noise Map Night-time - Without Through Route
- Archaeological Evaluation Report (Phase One)
- PEEZ3007 MC ES V2 Appendix 10.4 Modelling Methodology
- PEEZ3007 MC ES V1 Figure 14.2 Water Constraints British Geological Survey - Bedrock Geology
- PEEZ3007 MC ES V2 Appendix 13.5 Desk Based Coal Mining Risk Assessment (Part 1 of 11)
- PEEZ3007 MC ES V1 Figure 14.5 Water Constraints (Designated Ecological Sites)
- PEEZ3007 MC ES V2 Appendix 13.4 Desk Based Preliminary Risk Assessment (Part 3 of 25)
- Energy Strategy Statement
- PEEZ3007 MC ES V1 Chapter 15 Assessment of Cumulative Effects B 210223
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A3.2 (Part 6 of 23)
- PEEZ3007 MC ES V2 Appendix 13.4 Desk Based Preliminary Risk Assessment (Part 13 of 25)
- 01941_Mosley Common_S_04_Key Features and Easements_P1
- PEEZ3007 MC ES V2 Appendix 13.4 Desk Based Preliminary Risk Assessment (Part 20 of 25)
- NS018_SL_002 - Phase 1 S38 Boundary - 26 January 2023
- 22J245 -2D - Rev B Topographical Survey Information
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report F3.3
- PEEZ3007 MC ES V1 Chapter 12 Climate Change B 200223
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A3.2 (Part 21 of 23)
- PEEZ3007 MC ES V2 Appendix 13.4 Desk Based Preliminary Risk Assessment (Part 4 of 25)
- Design and Access Statement (Part 11 of 11)
- Build Phase Environmental Risk Mitigation Strategy
- PEEZ3007 MC ES V1 Figure 14.1 Water Constraints (Surface Water Features)
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A3.1
- PEEZ3007 MC ES V2 Appendix 13.5 Desk Based Coal Mining Risk Assessment (Part 11 of 11)
- PEEZ3007 MC ES V1 Figure 7.10 Viewpoint Location Plan
- NS018_SL_006 - Phase 1 Building Materials Plan - 26 January 2023
- PEEZ3007 MC ES V2 Appendix 8.6 Breeding Bird Survey
- PEEZ3007 MC ES V2 Appendix 13.4 Desk Based Preliminary Risk Assessment (Part 11 of 25)
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report F3.10
- PEEZ3007 MC ES V2 Appendix 13.4 Desk Based Preliminary Risk Assessment (Part 5 of 25)
- Design and Access Statement (Part 5 of 11)
- PEEZ3007 MC ES V2 Appendix 13.5 Desk Based Coal Mining Risk Assessment (Part 7 of 11)
- PEEZ3007 MC ES V2 Appendix 10.5 Construction Dust Assessment
- PEEZ3007 MC ES V1 Figure 4.6 Parameter Plan Land Use and Green Infrastructure (01941_PP_02-P1)
- PEEZ3007 MC ES V2 Appendix 8.4 Great Crested Newt Survey
- PEEZ3007 MC ES V2 Appendix 7.1 Assessment Methodology
- NS018_VS_002 - View 2 - 23 January 2023
- PEEZ3007 MC ES V1 Chapter 2 Approach to EIA B 210223
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A3.3 (Part 2 of 5)
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report F3.11
- NS018_VS_006 - View 6 - 23 January 2023
- Biodiversity Net Gain Assessment
- PEEZ3007 MC ES V2 Appendix 14.2 Guidance
- PEEZ3007 MC ES V2 Appendix 10.7 Glossary
- Remediation and Enabling Works Strategy (Part 3 of 3)
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A3.2 (Part 8 of 23)
- PEEZ3007 MC ES V2 Appendix 1.1 Statement of Technical Competence
- PEEZ3007 MC ES V1 Figure 14.3 Water Constraints (British Geological Survey - Superficial Deposits)
- PEEZ3007 MC ES V1 Figure 14.8 Water Constraints (Reservoir Flood Risk)
- PEEZ3007 MC ES V1 Chapter 5 Consideration of Alternatives B 200223
- PEEZ3007 MC ES V2 Appendix 2.4 Schedule of Responses to Scoping Opinion
- Agricultural Land Quality
- PEEZ3007 MC ES V1 Figure 11.4 Grid Noise Map Daytime - Without Through Route
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report F3.9
- PEEZ3007 MC ES V1 Figure 4.4 Proposed Demolition (01941_S_05-P1)
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report F3.12
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A7.2
- PEEZ3007 MC ES V2 Appendix 13.4 Desk Based Preliminary Risk Assessment (Part 18 of 25)
- PEEZ3007 MC ES V2 Appendix 8.5 Bat Survey Report
- PEEZ3007 MC ES V2 Appendix 8.1 Ecology Desk Study
- PEEZ3007 MC ES V2 Appendix 8.8 Arboricultural Implications Assessment
- NS018_SL_007 - Phase 1 Building Heights - 26 January 2023
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A3.2 (Part 20 of 23)
- NS018_SL_011 - Phase 1 Second Floor Plans - 26 January 2023
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A3.2 (Part 12 of 23)
- Mineral Safeguarding Assessment
- NS018_SL_004 - Boundary Treatments Plan - 26 January 2023
- PEEZ3007 MC ES V1 Figure 15.1 Approved Projects Plan
- Transport Assessment (Part 3 of 3)
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report F3.2
- 01941_Mosley Common_S_05_Proposed Demolition_P1
- NS018_SL_101d - Phase 1 Coloured Site Layout - 26 January 2023
- Flood Risk Assessment & Outline Drainage
- Drainage Strategy and Maintenance Plan
- PEEZ3007 MC ES V1 Figure 7.6 Planning Designations
- Specialist Housing Needs Assessment
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A3.3 (Part 3 of 5)
- PEEZ3007 MC ES V1 Figure 10.3 Monitoring Locations
- PEEZ3007 MC ES V2 Appendix 7.3 Schedule of Likely Landscape Effects
- PEEZ3007 MC ES V2 Appendix 13.4 Desk Based Preliminary Risk Assessment (Part 7 of 25)
- Written Scheme of Investigation (Phase One)
- 100 DRAINAGE STRATEGY-LAYOUT 100-1G
- Design Code (Part 2 of 3)
- PEEZ3007 MC ES V1 Figure 1.1 EIA Study Area Boundary (01941_S_06-P1)
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A3.2 (Part 3 of 23)
- PEEZ3007 MC ES V2 Appendix 13.4 Desk Based Preliminary Risk Assessment (Part 21 of 25)
- PEEZ3007 MC ES V2 Appendix 10.3 Professional Experience
- Planning and Affordable Housing Statement
- 01941_Mosley Common_PP_N03_Building Heights_P1
- PEEZ3007 MC ES V1 Figure 7.2 Bare Earth ZTV
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A3.2 (Part 10 of 23)
- PEEZ3007 MC ES V2 Appendix 13.4 Desk Based Preliminary Risk Assessment (Part 6 of 25)
- PEEZ3007 MC ES V1 Figure 10.1 Modelled Receptor Locations
- PEEZ3007 MC ES V2 Appendix 7.4 Schedule of Likely Visual Effects
- Design and Access Statement (Part 7 of 11)
- PEEZ3007 MC ES V1 Figure 7.3 Visual Barrier ZTV
- PEEZ3007 MC ES V2 Appendix 13.5 Desk Based Coal Mining Risk Assessment (Part 6 of 11)
- Remediation and Enabling Works Strategy (Part 2 of 3)
- PEEZ3007 MC ES V1 Figure 11.1 Baseline Noise Survey Locations
- Noise Impact Assessment (Phase One)
- PEEZ3007 MC ES V1 Figure 7.1 Location and Study Area
- PEEZ3007 MC ES V2 Appendix 13.4 Desk Based Preliminary Risk Assessment (Part 17 of 25)
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report F3.13
- NS018_VS_004 - View 4 - 23 January 2023
- Design and Access Statement (Part 8 of 11)
- PEEZ3007 MC ES V1 Chapter 9 Transport B 200223
- PEEZ3007 MC ES V1 Figure 1.2 Application Boundary (01941_S_01-P1)
- Design Code (Part 3 of 3)
- PEEZ3007 MC ES V2 Appendix 13.4 Desk Based Preliminary Risk Assessment (Part 1 of 25)
- PEEZ3007 MC ES V2 Appendix 8.7 Water Vole and Otter Survey
- 01941_Mosley Common_S_07_Northern Application Boundary_P1
- PEEZ3007 MC ES V2 Appendix 13.4 Desk Based Preliminary Risk Assessment (Part 25 of 25)
- PEEZ3007 MC ES V2 Appendix 2.3 Response to Scoping Opinion
- PEEZ3007 MC ES V1 Figure 10.2 Air Quality Management Area
- NS018_SL_102d - Rendered Site Layout - 14 February 2023
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A3.2 (Part 18 of 23)
- PEEZ3007 MC ES V2 Appendix 13.5 Desk Based Coal Mining Risk Assessment (Part 9 of 11)
- Social Value Baseline
- PEEZ3007 MC ES V2 Appendix 10.2 EPUK & IAQM Planning for Air Quality Guidance
- PEEZ3007 MC ES V2 Appendix 13.2 Phase II Geoenvironmental Site Assessment (Part 6 of 7)
- 01941_Mosley Common_PP_N02_Land Use & Green Infrastructure_P1
- PEEZ3007 MC ES V2 Appendix 8.2 Phase 1 Habitat Survey
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A3.2 (Part 11 of 23)
- PEEZ3007 MC ES V1 Figure 7.4 Landform
- PEEZ3007 MC ES V2 Appendix 8.3 Hedgerow Regulations Assessment
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A3.2 (Part 2 of 23)
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report A3.3 (Part 4 of 5)
- Arboricultural Impact Assessment in Support of Hybrid Planning
- PEEZ3007 MC ES V1 Figure 4.1 Topography (01941_S_02-P1)
- PEEZ3007 MC ES V2 Appendix 13.2 Phase II Geoenvironmental Site Assessment (Part 7 of 7)
- PEEZ3007 MC ES V2 Appendix 13.5 Desk Based Coal Mining Risk Assessment (Part 2 of 11)
- PEEZ3007 MC ES V1 Chapter 10 Air Quality B 200223
- Design and Access Statement (Part 9 of 11)
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report F3.14
- PEEZ3007 MC ES V2 Appendix 2.1 EIA Scoping Report
- PEEZ3007 MC ES V2 Appendix 13.2 Phase II Geoenvironmental Site Assessment (Part 3 of 7)
- PEEZ3007 MC ES V2 Appendix 13.4 Desk Based Preliminary Risk Assessment (Part 12 of 25)
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Wigan granted permission on 2 October 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Wigan
-
A/26/101008/FULL Refused
2 Mabel Street Wigan WN5 9EJ
Change of use from a 4 bed dwelling house (Use Class C3) into a 4 bed HMO for 4 occupants (Use Class C4) and installation of permanent vehicle crossing
-
A/25/098671/FULL Granted
19 Sefton Road Wigan WN3 6QU
Change of use to create 1 dwelling and 2 flats (Use Class C3) together with dormers to rear, replacement windows and external render to all elevations
-
A/26/101007/FULL Granted
23 Wenlock Road Leigh WN7 3LN
Erection of detached dwelling with associated parking, landscaping and extension to existing driveway following demolition of existing dwelling and garage
-
A/26/101122/FULL Granted
162 - 164 Manchester Road Ince Wigan WN2 2EA
Subdivision of existing retail unit (Use Class E) to create two retail units at ground floor (Use Class E) and one retail unit at first floor (Use Class E) together with new shop fronts, installation of new window openings at first floor to rear and new entrance to rear. Retrospective application
-
A/22/93798/FULL Granted
The New Fleece Hotel 9 - 11 Warrington Road Ashton-In-Makerfield Wigan WN4 9PL
Two storey rear extension to create 2 residential apartments comprising a 1 bed studio and a 1 x 3 bedroom unit, together with rooflights to front elevation