Planning application
Millingford Industrial Estate Bridge Street Golborne
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Redevelopment of existing industrial estate and erection of new building for B2 General Industrial, B8 open storage and distribution and Class E (g)(i) administrative functions together with installation of wash bay, cycle store and shelter, associated car parking, hard and soft landscaping and boundary treatments including new fence and gates
As published by the council, reference A/22/93633/MAJOR
Application record
- Reference
- A/22/93633/MAJOR
- Type
- Major application
- Status
- Decided
- Decision
- Granted As published: Approved with Conditions
- Received
- 27 Apr 2022
- Validated
- 6 Jul 2022
- Decided
- 18 May 2023
- Ward
- Golborne And Lowton West
- Parish
- Golborne And Lowton Township
- Decision by
- Delegated Decision
Site history
Applications at this address on the Wigan register
This site has had 3 applications since 2022: 2 approved, 0 refused.
-
A/23/96546/CON Decided
Millingford Industrial Estate Bridge Street Golborne
Condition Discharge application to discharge conditions 19 (Surface Water) and 20 (Site Investigation) in respect of application : A/22/93633/MAJOR.
-
A/22/94623/ADV Granted
Millingford Industrial Estate Bridge Street Golborne
Installation of 3 new non-illuminated fascia signs and 1 non-illuminated replacement free standing double sided sign
Timeline
Dates from the published record
-
27 Apr 2022
Received by Wigan
-
6 Jul 2022
Validated
Checked as complete and ready for consideration.
-
18 May 2023
Decision issued: Approved with Conditions
-
18 Sep 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
1 later application on the register refers to this one:
-
A/23/96546/CON Decided
Millingford Industrial Estate Bridge Street Golborne
Condition Discharge application to discharge conditions 19 (Surface Water) and 20 (Site Investigation) in respect of application : A/22/93633/MAJOR.
Who's behind it
Company information only, from the register and Companies House
STOAS ARCHITECTS LTD Agent, an architecture practice registered in Birmingham
Active · incorporated 2015 · Birmingham
52 applications on PlanIndex · across 17 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
The council's own list, drawings first
77 documents on file for this application
Drawings (27)
- Proposed floor plans
- Proposed floor plans
- Proposed ground floor plan in context
- Proposed access gates & fencing elevations
- Proposed elevations
- Proposed roof plan
- Proposed site layout plan
- Proposed site plan
- Proposed site layout plan
- Proposed boundary treatment plan
- Proposed demolition plan
- Proposed wash bay details
- Proposed boundary treatment plan
- Proposed ev charging details
- Proposed cycle & smokers shelter
- First floor heating layout
- Ground floor heating layout
- Typical drainage details
- Flow control and attenaution details
- Typical drainage details
- Topographical survey
- Site landscaping
- External lighting layout
- Existing site location and layout plan
- Existing drainage plans
- Existing draiange plans
- Existing boundary treatment plan
Everything on file (77)
- UU redacted version
- A.22.93633.MAJOR
- Web Decision Notice A.22.93633. MAJOR
- 20-2596-P100 Rev B - Proposed Floor Plans
- Planning Application _- A_22_93633_MAJOR
- RE_ A_22_93633_MAJOR
- G22023 Final Report - August 2022 - Compressed
- A_22_93633_Major
- 8246-C-101 T1 Drainage and Levels Strategy
- 20-2596-P002 Rev J - Proposed Site Layout Plan
- 8246-C-104 T0 Typical Drainage Details - Sheet 1 of 2
- 8246-C-103 T1 Flow Control and Attenaution details
- 22.11.25 - UU Holding Objection Response
- 8246-C-105 T1 Typical Drainage Details - Sheet 2 of 2
- 20-2596-P005 Rev E - Proposed Boundary Treatment Plan
- G22023 Final Report - August 2022 - Compressed
- Proposed Site Plan
- 20-2596-P007 Rev B - Existing Drainage Plans
- network rail 93633
- reply A_22_93633_MAJOR
- WNT69105-926(02) RSK ADAS Bat Survey Report. Golborne. August 2022.
- UNKNOWN
- UNKNOWN
- UNKNOWN
- UNKNOWN
- FW_ A_22_93633_MAJOR - URN_2011_0773_PLA_02_
- FW_ Response_ A_22_93633_MAJOR - MILLINGFORD INDUSTRIAL ESTATE
- ADAS_1051447_Pickerings Hire_Golborne_APS_Rev A_March 2022-compressed
- 6of9 - G22023 Phase 1 Report - April 2022-pages-130-135
- 4709 - 220321yc ~ External Lighting Report
- 2of9 - G22023 Phase 1 Report - April 2022-pages-13-27
- 15501_OGL - PH Golborne - Topographical Survey
- 9of9 - G22023 Phase 1 Report - April 2022-pages-153-155
- 20-2596-P003 Rev B - Proposed Demolition Plan
- 20-2596-P100 Rev A - Proposed Floor Plans
- 20-2596 Drawing Register P01 - 26.04.2022
- BXMW_HAR_Harrowby_Smoking_Vaping_Shelter_Specification_Sheet
- CW0191-RPT-001A Millingford Industrial Estate LVIA 16.06.2022
- 7of9 - G22023 Phase 1 Report - April 2022-pages-136-141
- 12824A-30-R01-03-F - FRA
- CIS - 11-0773-02, Bridge Street
- G22023 - 22-27300 - Land Contamination Results
- 20-2596-P402 - Proposed Wash Bay Details
- P5004-R1-V3 Millingford Industrial Estate, Golborne, Warrington - NA
- A.22.93633.MAJ Leigh Journal 14.07.2022
- 20-2596-P005 Rev D - Proposed Boundary Treatment Plan
- 20-2596-P006 - Proposed EV Charging Details
- 4709-SK220630.JA - First Floor Heating Layout
- 8of9 - G22023 Phase 1 Report - April 2022-pages-142-152
- RSK ADAS WNT69105-926 (03)_Biodiversity Net Gain Assessment. Pickering Hire. June 2022.
- 4709-Pickerings Golborne Lighting calculation
- 20-2596-P400 - Proposed Access Gates & Fencing Elevations
- 20220222 - Golborne, Millingford Industrial Estate TS FINAL2
- 4709-SK220701.JA - Ground Floor Heating Layout
- HO-LS-GOL Rev A - Site Landscaping
- 20-2596-P007 Rev A - Existing Draiange Plans
- 20-2596-P004 Rev B - Existing Boundary Treatment Plan
- 1of9 - G22023 Phase 1 Report - April 2022-pages-1-12
- 20-2596-P401 - Proposed Cycle & Smokers Shelter
- 20-2596 Design & Access Statement
- WNT69105-926 (00) ADAS PEA-PRA. Pickerings Depot Warrington. March 2022 Rev 1
- 20-2596-P002 Rev H - Proposed Site Layout Plan
- 4of9 - G22023 Phase 1 Report - April 2022-pages-45-117
- 20-2596 Drawing Register P01 - 05.07.2022
- 20-2596-P101 - Proposed Roof Plan
- 4709-E-700-P1-External Lighting Layout
- 3of9 - G22023 Phase 1 Report - April 2022-pages-28-44
- 20-2596-P001 Rev B - Existing Site Location and Layout Plan
- 20-2596 Drawing Register P01 - 14.06.2022
- 5of9 - G22023 Phase 1 Report - April 2022-pages-118-129
- 20-2596-P102 Rev A - Proposed Ground Floor Plan in Context
- BXMW_WAR_Wardale - Sepcification Sheet
- Application Form - LPA - Revised 05.07.2022_Redacted
- Heat Pump Schedule
- P5004-R2-V2 Millingford Industrial Estate, Golborne - Air Quality Assessment
- 20-2596-P300 Rev B - Proposed Elevations
- 20-2596 Drawing Register P01 - 16.06.2022
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you the drawings on every job in your area. 14 days free.
What this grant of permission means
Wigan granted permission on 18 May 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Millingford Industrial Estate Bridge Street Golborne
Condition Discharge application to discharge conditions 19 (Surface Water) and 20 (Site Investigation) in respect of application : A/22/93633/MAJOR.
Decided Conditions 41 docs -
Millingford Industrial Estate Bridge Street Golborne
Installation of 3 new non-illuminated fascia signs and 1 non-illuminated replacement free standing double sided sign
-
Land At Rear Of 18 To 32 School Street Golborne Warrington WA3 3BD
Erection of two detached dwellings together with access, parking and landscaping
-
C And F Sheet Metal Nook Lane Golborne Warrington WA3 3NE
82% historically approved · decision due ~14 Dec
Extension to the existing workshop, together with refurbishment works, including alterations to the external cladding
Awaiting decision Full applications Extension 7 docs -
38 Millfield Park Golborne WA3 3XS
Certificate of lawfulness for a proposed single storey rear extension
Small domestic -
All Saints Catholic Club High Street Golborne Warrington WA3 3BG
82% historically approved · decision due ~23 Apr
Conversion of existing social club (Sui Generis) to a special educational needs school (Use Class F(a)), together with the installation of play equipment on outdoor area
Other full applications
In Wigan
-
A/26/101274/FULL Granted
Land At Fleming Drive Ashton-in-makerfield WN4 8TX
Two storey detached four bed dwelling with integral garage, new boundary treatments including hard and soft landscaping thereto
-
A/26/101486/FULL Granted
49 Queen Street Orrell Wigan WN5 0AE
Change of use of land and conversion of the existing attached double garage to create a separate self-contained one-bedroom dwelling (Use Class C3), including installation of new windows and doors, associated internal alterations and associated boundary treatments
-
A/26/101406/FULL Withdrawn
40 Manchester Road Tyldesley Manchester M29 8DP
Change of use from dwelling to two self-contained one-bed flats.
-
A/25/100127/FULL Granted
Chamberlains Farm Crow Orchard Road Standish Wigan WN6 8RP
Creation of a menage in an existing equestrian grazing paddock
-
A/26/100304/FULL Granted
Douglas Valley Breakers Bradley Lane Standish Wigan WN6 0YR
Change of use from vehicle breakers yard (sui generis use) to gym (Use Class E(d)) together with extension of existing upper floor and installation of mezzanine level (retrospective)