Skip to content
PlanIndex Get alerts
Menu

Planning application

Land Adjacent To Brook Lane Orrell Wigan

Granted Wigan A/21/91474/FULL Full Details

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of detached building comprising of 9 dwellings, including car parking

As published by the council, reference A/21/91474/FULL

Application record

Reference
A/21/91474/FULL
Type
Full Details
Status
Decided
Decision
Approved with Conditions
Received
30 Apr 2021
Validated
19 May 2021
Decided
19 Aug 2021
Ward
Pemberton
Parish
Wigan South
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 30 Apr 2021

    Received by Wigan

  2. 19 May 2021

    Validated

    Checked as complete and ready for consideration.

  3. 19 Aug 2021

    Decision issued: Approved with Conditions

  4. 15 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

31 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 17 White Street Pemberton Wigan WN5 8JW

    A/22/93456/FULL Submitted 31 Mar 2022 37m away

    Conversion of existing dwelling to create two apartments and one Class E commercial store together with associated external alterations including removal of window opening and replacement window and door to front

    Granted Full applications New dwelling Windows or glazing 11 docs
    Several homes
  • 9-11 White Street Pemberton Wigan WN5 8JW

    A/24/97296/CU Submitted 15 May 2024 43m away

    To retain part sui generis use to the ground floor with a subdivision of the remaining single Class E use into 4 individual Class E units, together with new window in first floor rear elevation

    Granted Full applications Windows or glazing 12 docs
  • Pizza Hut 791 Ormskirk Road Wigan WN5 8HE

    A/26/101307/VAR Submitted 28 Jul 2026 90m away

    85% historically approved · decision due ~22 Sep

    Variation of condition 3 (control of opening hours) of previously approved A/10/74408. To amend opening hours to 09:00 to 02:00 the following day, Monday to Sunday, and at no other times.

    Awaiting decision Amendments 2 docs
  • Fir Tree Fishery 15 Orrell Road Orrell Wigan WN5 8EY

    A/23/96418/FULL Submitted 20 Nov 2023 100m away

    Installation of replacement shop front

    Withdrawn Full applications Windows or glazing 4 docs
  • Masonic Hall Chapel Street Pemberton Wigan WN5 8JP

    A/26/100752/FULL Submitted 10 Apr 2026 101m away

    Installation of canopy to North West elevation, alterations to fenestration including cladding and additional window and door openings, alterations to parking layout following creation of playing field and sensory garden and erection of 2.45 metre high mesh and timber boundary fencing

    Granted Full applications Windows or glazing 6 docs
  • Masonic Hall Chapel Street Pemberton Wigan WN5 8JP

    A/26/100808/ADV Submitted 24 Apr 2026 101m away

    83% historically approved · decision due ~17 Jul

    Installation of 1 fascia sign and 1 'V' shaped free-standing panel sign and removal of 1 fascia sign

    Decided Advertising

In Wigan

  • 65B Church Street Standish Wigan WN6 0JT

    Erection of a two storey/single storey building to be used as a drinking establishment (Sui Generis), with external works, following demolition of existing pharmacy building and one garage

    19 Feb 2026 Full applications
  • A/26/101398/FULL Awaiting decision

    Land At 287 Chaddock Lane Worsley Manchester M28 1DU

    Change of use of land, siting of 2 timber clad containers and erection of wooden chalet to be used as café/food outlet (Use Class E) together with associated parking area, 2.4m high gates and new access from Chaddock Lane

    20 Aug 2026 Full applications
  • Methodist Church 32B Wigan Road Leigh WN7 5AH

    Creation of new internal first floor level and associated internal and external alterations to include replacement windows and refurbishment of existing, installation of new glazed doors with shutters thereto

    24 Jul 2025 Full applications
  • 31 Wigan Lane Wigan WN1 1XR

    Change of use of first and second floors from residential (Use Class C3) to office accommodation (Use Class E), retaining aesthetics clinic (Use Class E) at ground floor

    23 Mar 2026 Full applications
  • Carpet Wizard 436 Ormskirk Road Wigan WN5 9DF

    New openings at ground and first floor to front and sides, canopy to front and render to all elevations

    5 Jan 2026 Full applications