Planning application

Land At Leigh Trading Estate Norweb Way Off Butts Street Leigh WN7 3EQ

Granted Wigan A/21/91109/MAJOR Major application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Construction of building containing 3 industrial units (use class B2) with associated hardstanding and parking areas.

As published by the council, reference A/21/91109/MAJOR

Application record

Reference
A/21/91109/MAJOR
Type
Major application
Status
Decided
Decision
Approved with Conditions
Received
10 Mar 2021
Validated
19 Apr 2021
Decided
23 Jun 2021
Ward
Leigh South
Parish
Leigh Township
Decision by
Delegated Decision
Postcode
WN7 3EQ

Timeline

Dates from the published record

  1. 10 Mar 2021

    Received by Wigan

  2. 19 Apr 2021

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jun 2021

    Decision issued: Approved with Conditions

  4. 24 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Butts Mill Butts Street Leigh WN7 3AE

    A/20/88565/CON Submitted 23 Jan 2020 262m away

    83% historically approved · decision due ~19 Mar

    Condition Discharge application to discharge condition number 3 in respect of application A/15/80863/LB

    Awaiting decision Conditions 4 docs
  • Vacant Land Rothay Street Leigh WN7 2DS

    A/24/98161/CON Submitted 8 Nov 2024 318m away

    Discharge of Conditions application in respect of Condition 7 (footpath) in respect of previously approved application : A/21/91926/MAJOR

    Decided Conditions 3 docs
  • Vacant Land Rothay Street Leigh WN7 2DS

    A/24/97856/CON Submitted 6 Sep 2024 318m away

    Condition Discharge application to discharge Condition No.6 (Ground Investigation) in respect of application A/21/91926/MAJOR

    Decided Conditions 8 docs
  • 14 Hurst Street Leigh WN7 3AF

    A/24/97504/HH Submitted 26 Jun 2024 322m away

    Two storey side extension

    Refused Householder Extension 7 docs
    Domestic
  • Vacant Land Rothay Street Leigh WN7 2DS

    A/21/91926/MAJOR Submitted 25 Jun 2021 358m away

    Erection of two storey building to contain 10 apartments together with parking and landscaping with access from Tweed Street

    Granted Full applications New dwelling 44 docs
    Major scheme
  • 190 Chapel Street Leigh WN7 2DW

    A/22/94324/CU Submitted 30 Aug 2022 383m away

    Change of use of ground floor and basement to food & drinking establishment, together with external alterations to front, side and rear elevations

    Granted Full applications 10 docs

In Wigan

  • 65B Church Street Standish Wigan WN6 0JT

    Erection of a two storey/single storey building to be used as a drinking establishment (Sui Generis), with external works, following demolition of existing pharmacy building and one garage

    19 Feb 2026 Full applications
  • A/26/101398/FULL Awaiting decision

    Land At 287 Chaddock Lane Worsley Manchester M28 1DU

    Change of use of land, siting of 2 timber clad containers and erection of wooden chalet to be used as café/food outlet (Use Class E) together with associated parking area, 2.4m high gates and new access from Chaddock Lane

    20 Aug 2026 Full applications
  • Methodist Church 32B Wigan Road Leigh WN7 5AH

    Creation of new internal first floor level and associated internal and external alterations to include replacement windows and refurbishment of existing, installation of new glazed doors with shutters thereto

    24 Jul 2025 Full applications
  • 31 Wigan Lane Wigan WN1 1XR

    Change of use of first and second floors from residential (Use Class C3) to office accommodation (Use Class E), retaining aesthetics clinic (Use Class E) at ground floor

    23 Mar 2026 Full applications
  • Carpet Wizard 436 Ormskirk Road Wigan WN5 9DF

    New openings at ground and first floor to front and sides, canopy to front and render to all elevations

    5 Jan 2026 Full applications