Planning application
Marylebone Station Forecourt London
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Change of existing Upper Crust transformed to a AMT retail unit located on the station concourse including installation of a new front and back counter, internal finishes together with new equipment and signage.
As published by the council, reference 26/05638/LBC
Application record
- Reference
- 26/05638/LBC
- Category
- Heritage and listed buildings
- Status
- Decided
- Received
- 18 Aug 2026
- Validated
- 18 Aug 2026
Timeline
Dates from the published record
-
18 Aug 2026
Received by Westminster
-
24 Aug 2026
Added to PlanIndex
-
11 Sep 2026
Status changed to Decided
Previously Pending.
After the decision
Westminster has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Other heritage and listed building applications
In Westminster
-
26/04878/LBC Decided
34 Grosvenor Street London W1K 4QU
Internal works to facilitate the subdivision of 34 Grosvenor Street and 3 Three Kings Yard
-
26/04141/LBC Decided
80E Randolph Avenue London W9 1BG
Replacement of sashes in two front windows at 2nd floor level and one rear window with slimline double glazed timber sashes. (Linked with 26/04142/FULL)
-
26/06288/LBC Awaiting decision
Barness Court 6 - 8 Westbourne Terrace London W2 3UW
Installation of a new riser as per GW10 design comprising a single riser with 7 entries and 9 Taylor valves to be installed. (Linked with 26/06287/FULL)
-
26/06270/LBC Awaiting decision
Maisonette Basement And Ground Floor 101 Hereford Road London W2 5BB
Amalgamation of existing lower ground and ground floor maisonette to with the first floor flat to create a single dwelling and associated internal works including creation of a staircase. (Linked with 26/06269/FULL)
-
26/06230/LBC Awaiting decision
10 Bedford Street London WC2E 9HE
Internal redecoration/refurbishment to the existing Caffe Nero including redecorating throughout, replacing the tiled floor in the customer area, raising the timber floor by 180mm on the left-hand side upon entry to bring interest to the area, for the existing large, boxed window cils on right-hand side upon entry; the one on the far right will be removed to give way for more seating, with the other being adapted to allow for leg space below, and two bespoke decorative chandeliers to be hung in the customer area which will be installed with structural engineer approval.