Planning application

25 - 26 Albemarle Street London W1S 4HX

Awaiting decision Westminster 26/05607/FULL Full applications

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Variation of condition 7 of planning permission dated 2nd July 2025 (RN:25/02629/FULL) for the Installation of a glazed retractable roof with associated works on the existing rear first floor roof terrace. Namely, to increase customer capacity on the terrace from 16 to 30 persons at any time.

As published by the council, reference 26/05607/FULL

Application record

Reference
26/05607/FULL
Category
Full applications
Status
Pending
Received
17 Aug 2026
Validated
17 Aug 2026
Postcode
W1S 4HX

Site history

Applications at this address on the Westminster register

This site has had 2 applications since 2026.

  • 26/04007/NMA Withdrawn

    25 - 26 Albemarle Street London W1S 4HX

    Amendments to planning permission dated 2nd July 2025 (RN 25/02629/FULL) for, "Installation of a glazed retractable roof with associated works on the existing rear first floor roof terrace"; NAMELY, to varying the wording of Condition 7 to increase the customer capacity on the rear first floor terrace from 16 to 30 persons.

    Submitted 17 Jun 2026 Amendments

Timeline

Dates from the published record

  1. 17 Aug 2026

    Received by Westminster

  2. 22 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 12 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 61 days over the applications it decided in the last year.

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 85 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 25 - 26 Albemarle Street London W1S 4HX

    26/04007/NMA Submitted 17 Jun 2026 0m away

    92% historically approved · decision due ~12 Aug

    Amendments to planning permission dated 2nd July 2025 (RN 25/02629/FULL) for, "Installation of a glazed retractable roof with associated works on the existing rear first floor roof terrace"; NAMELY, to varying the wording of Condition 7 to increase the customer capacity on the rear first floor terrace from 16 to 30 persons.

    Withdrawn Amendments Windows or glazing
  • 23 Grafton Street London W1S 4EY

    26/00555/NMA Submitted 30 Jan 2026 25m away

    Amendments to planning permission dated 17 June 2025 (RN: 25/01604/FULL) for Phased development including replacement of rear basement roof slab and creation of a rear extension at ground floor. Removal of rear ground floor toilet block and external fire escape stairs. Demolition of existing, altered mansard roof and construction of a new mansard roof with dormer windows and concealed plant enclosure. Extension of existing lift to serve fourth floor. Replacement of third floor rear windows with double glazed sash windows. Minor internal reconfigurations. Continued use of ground floor as retail (Use Class E(a)) and basement, first, second, third and fourth as office (Use Class E(g)). NAMELY, to retain ground floor rear door, retain existing floor slab and rear void, retain ground-floor landing stairs in existing arrangement, and amendment of Condition 11 to require details of waste and recycling to be submitted for approval prior to occupation.

    Granted Amendments Extension Loft or dormer +2 18 docs
  • 23 Grafton Street London W1S 4EY

    26/00554/LBC Submitted 30 Jan 2026 25m away

    90% historically approved · decision due ~27 Mar

    Phased development including retention of rear basement roof slab (previously proposed for demolition and replacement), infilling of void creating an internal lightwell and the creation of a rear extension at ground floor. Removal of rear ground floor toilet block and external fire escape stairs. Demolition of existing, altered mansard roof and construction of a new mansard roof with dormer windows and concealed plant enclosure. Extension of existing lift to serve fourth floor. Replacement of third floor rear windows with double glazed sash windows. Minor internal reconfigurations.

    Awaiting decision Heritage and listed buildings Extension Loft or dormer +2 47 docs
  • 23 Grafton Street London W1S 4EY

    26/01670/ADFULL Submitted 13 Mar 2026 30m away

    87% historically approved · decision due ~8 May

    Detailed drawings of the alterations to party walls and buttress pursuant to part conditions 10a of planning permission dated 17th June 2025 (RN 25/01604/FULL)

    Awaiting decision Full applications 12 docs
  • 23 Grafton Street London W1S 4EY

    26/01669/ADLBC Submitted 13 Mar 2026 30m away

    90% historically approved · decision due ~8 May

    Detailed drawings of All new windows and doors pursuant to part conditions 4b of listed building consent dated 17th June 2025 (RN 25/01605/LBC)

    Awaiting decision Conditions Windows or glazing 13 docs
  • 23 Grafton Street London W1S 4EY

    25/09056/ADFULL Submitted 15 Dec 2025 30m away

    87% historically approved · decision due ~9 Feb

    Details of waste storage pursuant to condition 11 of planning permission dated 17 June 2025 (RN: 25/01604/FULL)

    Awaiting decision Full applications 5 docs

In Westminster

  • 26/06024/FULL Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)

    3 Sep 2026 Full applications
  • 26/06017/FULL Awaiting decision

    38 Lauderdale Mansions Lauderdale Road London W9 1NE

    Installation of an external AC Unit / Heat Pump at roof level.

    2 Sep 2026 Full applications
  • 26/05938/FULL Awaiting decision

    24 Vincent Square London SW1P 2NJ

    Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.

    1 Sep 2026 Full applications
  • 26/05935/FULL Awaiting decision

    47 Hereford Road London W2 5AH

    Installation of one number new external condenser unit to the southerly elevation service alley.

    1 Sep 2026 Full applications
  • 26/05959/FULL Awaiting decision

    Basement And Ground Floor 50 New Bond Street London W1S 1BJ

    Installation of three new condensers on the roof, within an existing designated plant area.

    1 Sep 2026 Full applications