Skip to content
PlanIndex Get alerts
Menu

Planning application

Knightsbridge London

Awaiting decision Westminster 26/05591/OBS

Relates to 26/05456/ADV

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Installation of Christmas decorations comprising two internally illuminated cross-street decorations across Knightsbridge and associated decorative displays including illuminated lanterns with garlands mounted to lampposts and ground-mounted decorative features, on a temporary basis until 18 January 2027. Your ref: CA/26/04311. Linked to Westminster City Council application ref. 26/05456/ADV.

As published by the council, reference 26/05591/OBS

Application record

Reference
26/05591/OBS
Status
Pending
Received
12 Aug 2026
Validated
12 Aug 2026

Site history

Applications at this address on the Westminster register

This site has had 4 applications since 2025.

  • 26/05456/ADV Awaiting decision

    Knightsbridge London

    Display of Christmas decorations comprising up to 10 internally illuminated lantern and garland displays mounted to existing lampposts and three internally illuminated ground-mounted decorative features within Knightsbridge, on a temporary basis from 20 October 2026 until 18 January 2027. (Linked to RBKC application ref. 26/04311 and Westminster OBS ref. 26/05591/OBS).

    Submitted 11 Aug 2026 Advertising
  • 26/01609/ADV Awaiting decision

    Knightsbridge London

    Display of a double-sided advertisement panel consisting of 2 LCD screens both measuring 2.1m x 1.34m capable of static and dynamic content display with automatic rotation of images on bus shelter N outside the Lanesborough Hotel.

    Submitted 11 Mar 2026 Advertising
  • 25/04431/ADV Decided

    Knightsbridge London

    Display of five non illuminated lampposts column banners measuring 2.03 x 0.76m along Knightsbridge (outside 153 Knightbridge)

    Decided 13 Jul 2026 Advertising

Timeline

Dates from the published record

  1. 12 Aug 2026

    Received by Westminster

  2. 18 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 7 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 65 days over the applications it decided in the last year.

Cases linked to this one on the register

  • 26/05456/ADV Awaiting decision

    Knightsbridge London

    Display of Christmas decorations comprising up to 10 internally illuminated lantern and garland displays mounted to existing lampposts and three internally illuminated ground-mounted decorative features within Knightsbridge, on a temporary basis from 20 October 2026 until 18 January 2027. (Linked to RBKC application ref. 26/04311 and Westminster OBS ref. 26/05591/OBS).

    Submitted 11 Aug 2026 Advertising

1 later application on the register refers to this one:

  • 26/05456/ADV Awaiting decision

    Knightsbridge London

    Display of Christmas decorations comprising up to 10 internally illuminated lantern and garland displays mounted to existing lampposts and three internally illuminated ground-mounted decorative features within Knightsbridge, on a temporary basis from 20 October 2026 until 18 January 2027. (Linked to RBKC application ref. 26/04311 and Westminster OBS ref. 26/05591/OBS).

    Submitted 11 Aug 2026 Advertising

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster's median decision took 65 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Westminster's portal will say. Our guide explains the common types.