Skip to content
PlanIndex Get alerts
Menu

Planning application

Trafalgar Square London

Awaiting decision Westminster 26/05306/FULL Full applications

Relates to 26/05307/LBC

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Public safety improvements including automated moveable bollards and CCTV to the southern boundary of Trafalgar Square (Linked to 26/05307/LBC).

As published by the council, reference 26/05306/FULL

Application record

Reference
26/05306/FULL
Category
Full applications
Status
Pending
Received
5 Aug 2026
Validated
5 Aug 2026

Site history

Applications at this address on the Westminster register

This site has had 4 applications since 2026.

  • 26/05307/LBC Awaiting decision

    Trafalgar Square London

    Public safety improvements including automated moveable bollards and CCTV to the southern boundary of Trafalgar Square (Linked to 26/05306/FULL)

    Submitted 5 Aug 2026 Heritage and listed buildings
  • 26/01502/LBC Awaiting decision

    Trafalgar Square London

    Temporary installation of 'Lady in Blue' by Tschabalala Self on the Fourth Plinth between September 2026 and September 2028. (Linked with 26/01501/FULL).

    Submitted 9 Mar 2026 Heritage and listed buildings
  • 26/01501/FULL Awaiting decision

    Trafalgar Square London

    Temporary installation of 'Lady in Blue' by Tschabalala Self on the Fourth Plinth between September 2026 and September 2028. (Linked with 26/01502/LBC)

    Submitted 9 Mar 2026 Full applications

Timeline

Dates from the published record

  1. 5 Aug 2026

    Received by Westminster

  2. 11 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 30 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 61 days over the applications it decided in the last year.

Cases linked to this one on the register

  • 26/05307/LBC Awaiting decision

    Trafalgar Square London

    Public safety improvements including automated moveable bollards and CCTV to the southern boundary of Trafalgar Square (Linked to 26/05306/FULL)

    Submitted 5 Aug 2026 Heritage and listed buildings

1 later application on the register refers to this one:

  • 26/05307/LBC Awaiting decision

    Trafalgar Square London

    Public safety improvements including automated moveable bollards and CCTV to the southern boundary of Trafalgar Square (Linked to 26/05306/FULL)

    Submitted 5 Aug 2026 Heritage and listed buildings

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 85 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Westminster

  • 26/06024/FULL Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)

    3 Sep 2026 Full applications
  • 26/06017/FULL Awaiting decision

    38 Lauderdale Mansions Lauderdale Road London W9 1NE

    Installation of an external AC Unit / Heat Pump at roof level.

    2 Sep 2026 Full applications
  • 26/05938/FULL Awaiting decision

    24 Vincent Square London SW1P 2NJ

    Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.

    1 Sep 2026 Full applications
  • 26/05935/FULL Awaiting decision

    47 Hereford Road London W2 5AH

    Installation of one number new external condenser unit to the southerly elevation service alley.

    1 Sep 2026 Full applications
  • 26/05959/FULL Awaiting decision

    Basement And Ground Floor 50 New Bond Street London W1S 1BJ

    Installation of three new condensers on the roof, within an existing designated plant area.

    1 Sep 2026 Full applications