Skip to content
PlanIndex Get alerts
Menu

Planning application

Flat 11 Maybury Court Marylebone Street London W1G 8JE

Awaiting decision Westminster 26/05147/FULL Full applications

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Replacement of existing single-glazed timber-framed windows at Fourth Floor, Flat 11, Maybury Court with new double-glazed timber-framed windows.

As published by the council, reference 26/05147/FULL

Application record

Reference
26/05147/FULL
Category
Full applications
Status
Pending
Received
30 Jul 2026
Validated
6 Aug 2026
Postcode
W1G 8JE

Timeline

Dates from the published record

  1. 30 Jul 2026

    Received by Westminster

  2. 6 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 11 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 1 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 61 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26 Marylebone High Street London W1U 4PJ

    04/06327/FULL Submitted 10 Aug 2004 27m away

    Installation of new shopfront.

    Granted Full applications Windows or glazing 9 docs
  • 26 Marylebone High Street London W1U 4PJ

    04/06329/ADV Submitted 10 Aug 2004 27m away

    Display of externally illuminated projecting sign measuring 300mm x 900mm.

    Granted Advertising 5 docs
  • Flat 56 Melcombe Regis Court 59 Weymouth Street London W1G 8NT

    25/08365/FULL Submitted 17 Nov 2025 27m away

    Replacement of crittal windows with double glazed crittal windows within the mansard roof.

    Refused Full applications Loft or dormer Windows or glazing 17 docs
  • Flat 47 Maybury Court Marylebone Street London W1G 8JF

    26/00320/FULL Submitted 20 Jan 2026 28m away

    87% historically approved · decision due ~28 Apr

    Replacement of existing single glazed timber framed windows at First Floor Flat 47, Maybury Court with new double glazed timber framed windows.

    Awaiting decision Full applications Windows or glazing 22 docs
  • Marylebone High Street London

    25/07400/ADV Submitted 14 Oct 2025 41m away

    Display of illuminated Christmas decorations along Marylebone High Street comprising 16 externally projecting installations each measuring 0.9m x 2m attached to lamp posts and 17 cross-street installations each measuring 13.2m x 1.5m for a temporary period from 19th October to the 31st January 2026

    Granted Advertising 14 docs
  • 56 - 60 Weymouth Street London W1G 6NX

    25/06552/FULL Submitted 12 Sep 2025 50m away

    Installation of a green roof and external rooftop plant / machinery with associated acoustic enclosures, alongside fenestration alterations to accommodate louvres and ductwork, in connection with an MRI diagnostics centre.

    Granted Full applications Windows or glazing 41 docs

In Westminster

  • 26/06024/FULL Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)

    3 Sep 2026 Full applications
  • 26/06017/FULL Awaiting decision

    38 Lauderdale Mansions Lauderdale Road London W9 1NE

    Installation of an external AC Unit / Heat Pump at roof level.

    2 Sep 2026 Full applications
  • 26/05938/FULL Awaiting decision

    24 Vincent Square London SW1P 2NJ

    Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.

    1 Sep 2026 Full applications
  • 26/05935/FULL Awaiting decision

    47 Hereford Road London W2 5AH

    Installation of one number new external condenser unit to the southerly elevation service alley.

    1 Sep 2026 Full applications
  • 26/05959/FULL Awaiting decision

    Basement And Ground Floor 50 New Bond Street London W1S 1BJ

    Installation of three new condensers on the roof, within an existing designated plant area.

    1 Sep 2026 Full applications