Planning application
24 - 26 Spring Street London W2 1JA
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Variation of conditions 1 and 5 (part 3 only) of planning permission dated 27th February 2025 (RN 24/08975/FULL) for the installation of new mechanical plant equipment to the rear elevation. NAMELY, reflecting necessary acoustic attenuation to the mechanical plant installation permitted by this permission and partially discharge Condition 5, Part 3, to demonstrate compliance with the noise levels required by this same permission, specifically in Condition 8, which requires compliance with the approved Noise Impact Assessment.
As published by the council, reference 26/05137/FULL
Application record
- Reference
- 26/05137/FULL
- Category
- Full applications
- Status
- Pending
- Received
- 30 Jul 2026
- Validated
- 30 Jul 2026
- Postcode
- W2 1JA
Timeline
Dates from the published record
-
30 Jul 2026
Received by Westminster
-
9 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 24 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 61 days over the applications it decided in the last year.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Basement And Ground Floor 17 - 18 Spring Street London W2 1JA
87% historically approved · decision due ~8 Oct
Shopfront alterations including alterations to entrance. (Linked to 26/05359/LBC)
Awaiting decision Full applications Windows or glazing -
Basement And Ground Floor 17 - 18 Spring Street London W2 1JA
90% historically approved · decision due ~8 Oct
Shopfront alterations including alterations to entrance. (Linked to 26/05358/FULL)
Awaiting decision Heritage and listed buildings Windows or glazing -
22 Spring Street London W2 1JA
Shopfront improvements including; New painted hardwood shopfront, 1no main entrance door and 1no fixed side door as existing; New traditional manually operated awning (Linked with 25/06383/COADV).
Granted Full applications Windows or glazing 15 docs -
22 Spring Street London W2 1JA
Fascia sign - new ppc aluminium fascia sign with 3D aluminium / acrylic backlit signage letters; Projecting sign - new internally illuminated ppc aluminium projecting sign with cutout acrylic letters (Linked with 25/06382/COFULL)
Granted Advertising 3 docs -
24 - 26 Spring Street London W2 1JA
Display of non-illuminated temporary hoarding measuring 2.4m x 1.2m, 2.4m x 15.9m, 2.4m x 6.4m, for a temporary period from 24 July 2025 to 24 October 2025. (Retrospective)
Granted Advertising 13 docs -
24 - 26 Spring Street London W2 1JA
87% historically approved · decision due ~28 May
Variation of condition 1 (approved plans) and discharge of condition 5 part 3 of planning permission dated 27th February 2025 (RN 24/08975/FULL) for the installation of new mechanical plant equipment to the rear elevation. NAMELY,variation to approved drawings and to demonstrate accordance with the attenuation measures detailed within the original and approved ACA Acoustic Impact Assessment and, therefore, achieve compliance with Condition 8 of the operative planning permission.
Awaiting decision Full applications 14 docs
Other full applications applications
In Westminster
-
26/06024/FULL Awaiting decision
House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA
Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)
-
26/06017/FULL Awaiting decision
38 Lauderdale Mansions Lauderdale Road London W9 1NE
Installation of an external AC Unit / Heat Pump at roof level.
-
26/05938/FULL Awaiting decision
24 Vincent Square London SW1P 2NJ
Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.
-
26/05935/FULL Awaiting decision
47 Hereford Road London W2 5AH
Installation of one number new external condenser unit to the southerly elevation service alley.
-
26/05959/FULL Awaiting decision
Basement And Ground Floor 50 New Bond Street London W1S 1BJ
Installation of three new condensers on the roof, within an existing designated plant area.