Skip to content
PlanIndex Get alerts
Menu

Planning application

24 - 26 Spring Street London W2 1JA

Awaiting decision Westminster 26/05137/FULL Full applications

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Variation of conditions 1 and 5 (part 3 only) of planning permission dated 27th February 2025 (RN 24/08975/FULL) for the installation of new mechanical plant equipment to the rear elevation. NAMELY, reflecting necessary acoustic attenuation to the mechanical plant installation permitted by this permission and partially discharge Condition 5, Part 3, to demonstrate compliance with the noise levels required by this same permission, specifically in Condition 8, which requires compliance with the approved Noise Impact Assessment.

As published by the council, reference 26/05137/FULL

Application record

Reference
26/05137/FULL
Category
Full applications
Status
Pending
Received
30 Jul 2026
Validated
30 Jul 2026
Postcode
W2 1JA

Timeline

Dates from the published record

  1. 30 Jul 2026

    Received by Westminster

  2. 9 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 24 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 61 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Basement And Ground Floor 17 - 18 Spring Street London W2 1JA

    26/05358/FULL Submitted 7 Aug 2026 0m away

    87% historically approved · decision due ~8 Oct

    Shopfront alterations including alterations to entrance. (Linked to 26/05359/LBC)

    Awaiting decision Full applications Windows or glazing
  • Basement And Ground Floor 17 - 18 Spring Street London W2 1JA

    26/05359/LBC Submitted 7 Aug 2026 0m away

    90% historically approved · decision due ~8 Oct

    Shopfront alterations including alterations to entrance. (Linked to 26/05358/FULL)

    Awaiting decision Heritage and listed buildings Windows or glazing
  • 22 Spring Street London W2 1JA

    25/06382/COFUL Submitted 8 Sep 2025 0m away

    Shopfront improvements including; New painted hardwood shopfront, 1no main entrance door and 1no fixed side door as existing; New traditional manually operated awning (Linked with 25/06383/COADV).

    Granted Full applications Windows or glazing 15 docs
  • 22 Spring Street London W2 1JA

    25/06383/COADV Submitted 8 Sep 2025 0m away

    Fascia sign - new ppc aluminium fascia sign with 3D aluminium / acrylic backlit signage letters; Projecting sign - new internally illuminated ppc aluminium projecting sign with cutout acrylic letters (Linked with 25/06382/COFULL)

    Granted Advertising 3 docs
  • 24 - 26 Spring Street London W2 1JA

    25/05218/ADV Submitted 25 Jul 2025 35m away

    Display of non-illuminated temporary hoarding measuring 2.4m x 1.2m, 2.4m x 15.9m, 2.4m x 6.4m, for a temporary period from 24 July 2025 to 24 October 2025. (Retrospective)

    Granted Advertising 13 docs
  • 24 - 26 Spring Street London W2 1JA

    26/02224/FULL Submitted 2 Apr 2026 36m away

    87% historically approved · decision due ~28 May

    Variation of condition 1 (approved plans) and discharge of condition 5 part 3 of planning permission dated 27th February 2025 (RN 24/08975/FULL) for the installation of new mechanical plant equipment to the rear elevation. NAMELY,variation to approved drawings and to demonstrate accordance with the attenuation measures detailed within the original and approved ACA Acoustic Impact Assessment and, therefore, achieve compliance with Condition 8 of the operative planning permission.

    Awaiting decision Full applications 14 docs

In Westminster

  • 26/06024/FULL Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)

    3 Sep 2026 Full applications
  • 26/06017/FULL Awaiting decision

    38 Lauderdale Mansions Lauderdale Road London W9 1NE

    Installation of an external AC Unit / Heat Pump at roof level.

    2 Sep 2026 Full applications
  • 26/05938/FULL Awaiting decision

    24 Vincent Square London SW1P 2NJ

    Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.

    1 Sep 2026 Full applications
  • 26/05935/FULL Awaiting decision

    47 Hereford Road London W2 5AH

    Installation of one number new external condenser unit to the southerly elevation service alley.

    1 Sep 2026 Full applications
  • 26/05959/FULL Awaiting decision

    Basement And Ground Floor 50 New Bond Street London W1S 1BJ

    Installation of three new condensers on the roof, within an existing designated plant area.

    1 Sep 2026 Full applications