Skip to content
PlanIndex Get alerts
Menu

Planning application

26/05069/FULL

Stanhope House Stanhope Place London W2 2HH

Awaiting decision Westminster Full Planning Permission Application

Proposal

Replacement of balcony balustrade and cornice flashing repairs. (Linked with 26/05070/LBC)

As published by the council, reference 26/05069/FULL

Timeline

Dates from the published record

  1. 28 Jul 2026

    Received by Westminster

  2. 4 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/05070/LBC Awaiting decision

    Stanhope House Stanhope Place London W2 2HH

    Replacement of balcony balustrade and cornice flashing repairs. (Linked with 26/05069/FULL)

    28 Jul 2026 3m away Heritage and listed buildings
  • 26/03467/FULL Awaiting decision

    2 Hyde Park Place London W2 2LH

    Variation of condition 3 (Code of construction practice) of planning permission dated 18 March 2022 (RN: 20/08337/FULL) for the: Conversion of existing single family dwelling to provide three residential units, with associated internal and external works, demolition and redevelopment of rear lift shaft extension and rear courtyard extension. Excavation of a basement with associated escape stair. NAMELY, to allow the regularisation of the timing mechanism associated with Condition 3 whilst preserving the substantive environmental protections and operational requirements of the Code of Construction Practice in full.

    27 May 2026 45m away Full applications
  • 25/08882/ADFULL Granted

    1 Connaught Place London W2 2ET

    Details of render and mortar specifications pursuant to condition 5 of planning permission dated 20 June 2025 (RN: 25/02641/FULL).

    8 Dec 2025 63m away Full applications
  • 26/01543/ADV Awaiting decision

    Bus Shelter Outside 2-18 Edgware Road London W2 2ET

    Display of a double-sided advertisement panel consisting of 2 LCD screens both measuring 2.1m x 1.34m capable of static and dynamic content display with automatic rotation of images (Bus Shelter O/S No 6 MARBLE ARCH)

    10 Mar 2026 63m away Advertising
  • 25/09388/ADLBC Granted

    1 Connaught Place London W2 2ET

    Details of render and pointing mortar specifications pursuant to condition 4 of listed building consent dated 20 June 2025 (RN: 25/01507/LBC).

    14 Feb 2026 63m away Conditions
  • 08/06487/FULL Granted

    Bain House 16 Connaught Place London W2 2ES

    Installation of air conditioning equipment to external terraces at rear third floor.

    22 Jul 2008 81m away Full applications

In Westminster

  • 26/05054/ADFULL Awaiting decision

    82 Margaret Street London W1W 8LH

    Detailed planting scheme and an associated biodiversity management plan; pursuant to condition 24 of planning permission dated 10th November 2025 (25/02820/FULL)

    28 Jul 2026 Full applications
  • 26/05052/FULL Awaiting decision

    23 York Street London W1U 6PF

    Internal reconfiguration and refurbishment of the existing residential building to improve the layout of six self-contained flats, together with associated internal alterations, minor external alterations to the rear elevation, replacement of windows and doors where shown, and associated mechanical, electrical and fire safety works. (Linked with 26/05053/LBC)

    28 Jul 2026 Full applications
  • 26/05064/ADFULL Awaiting decision

    Development Site At 19 To 24 Dering Street London W1S 1BL

    Detailed of uperstructure works, detailed plans and elevations of the roof, including the proposed equipment and the layout of photovoltaic (PV) panels pursuant to condition 29 of Planning Permission dated 18th October 2024 (RN:23/07483).

    28 Jul 2026 Full applications
  • 26/05078/ADFULL Awaiting decision

    63 Blandford Street London W1U 7HR

    Details of written photographic specification of the materials; exterior of the new extension; new windows, rooflights, and doors; new roof balustrade to rear; and new solar panels pursuant to conditions 4 and 5 of planning permission dated 03 November 2025 (RN: 25/04449/FULL).

    28 Jul 2026 Full applications
  • 26/05075/ADFULL Awaiting decision

    86 Horseferry Road London SW1P 2EE

    Details of a Building Research Establishment methods ('BREEAM') rating of 'Excellent' (or equivalent independent assessment) pursuant to condtion 12 of Planning Permission dated 9th September 2024 (RN:24/04890).

    28 Jul 2026 Full applications