Planning application
26/04798/FULL
60 Queen's Gardens London W2 3AF
Proposal
Erection of fifth floor rear dormer and balcony, along with alterations to layout of fourth and fifth floor. (Linked with 26/04799/LBC)
As published by the council, reference 26/04798/FULL
Timeline
Dates from the published record
-
17 Jul 2026
Received by Westminster
-
20 Jul 2026
Validated
Checked as complete and ready for consideration.
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/04800/LBC Awaiting decision
60 Queen's Gardens London W2 3AF
Internal alterations across the ground floor to fifth floors.
-
26/04799/LBC Awaiting decision
60 Queen's Gardens London W2 3AF
Erection of fifth floor rear dormer and balcony, along with alterations to layout of fourth and fifth floor. (Linked with 26/04798/FULL)
-
25/08339/TCA Awaiting decision
Open Space (east) Queen's Gardens London W2 3BA
1868 - Common lime - Reduce canopy by c. 3m to c. 16m x 4m to alleviate biomechanical stresses. 1870 - London plane - Reduce northern half of canopy by up to 3m to rebalance and reduce suppression on adjacent limes. No reduction to southern half of canopy required. 1872 - Common lime - Reduce northern side of canopy (2no. branches at 6m above ground level only) by 3m to established growth points. 1875 - Common lime - Remove major deadwood 1877 - London plane - Reduce canopy on north side by no more than 3m to c. 6.5m (averaged) from trunk, to rebalance canopy and reduce suppression of adjacent limes. 1880 - Indian chestnut - Reduce principal branch on east side by up to 1.5m to alleviate biomechanical stresses. Crown lift over footpath to maintain 4m clearance.
-
25/05611/LBC Granted
56 Queen's Gardens London W2 3AF
Removal of existing roof slates and boards (retrospective), installation of new natural roof slates, boards and insulation; replacement lead flashings and gutter linings; and replacement skylight.
-
25/05610/FULL Granted
56 Queen's Gardens London W2 3AF
Removal of existing roof slates and boards (retrospective), installation of new natural roof slates, boards and insulation; replacement lead flashings and gutter linings; and replacement skylight.
-
26/01014/ADFULL Granted
56 Queen's Gardens London W2 3AF
Details of plans and sections, photos and manufacturer's spec of the existing and proposed skylight pursuant to condition 4 of planning permission dated 29th September 2025 (RN: 25/05610/FULL)
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.