Planning application
10 Alma Square London NW8 9QD
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Alterations to front boundary wall.
As published by the council, reference 26/04624/FULL
Application record
- Reference
- 26/04624/FULL
- Category
- Full applications
- Status
- Decided
- Received
- 10 Jul 2026
- Validated
- 14 Jul 2026
- Ward
- Abbey Road
- Postcode
- NW8 9QD
Timeline
Dates from the published record
-
10 Jul 2026
Received by Westminster
-
14 Jul 2026
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
11 Sep 2026
Status changed to Decided
Previously Pending.
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
Westminster has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
5 Alma Square NW8 9QD
Reconfiguration of the upper ground floor one-bedroom flat and the amalgamation of the first floor and second-floor one-bedroom flats to create a three-bedroom maisonette.
Granted Full applications New dwelling 19 docs -
8 Alma Square NW8 9QD
1 x London plane (front): crown reduce to previous, most recent reduction points.
Granted Trees 9 docs -
First Floor Flat 2 Nugent Terrace London NW8 9QB
87% historically approved · decision due ~26 May
Amalgamation of two existing flats into a single dwelling; erection of first-floor extension with balcony and stairs down to new rear terrace and associated new railings; installation of air source heat pumps to rear flat roof; replacement of windows and doors; installation of solar panels to roof; installation of rooflights.
Awaiting decision Full applications New dwelling Extension +3 42 docsDomestic -
12 Alma Square NW8 9QA
Amalgamation of two self-contained flats into a single family dwelling; replacement of windows with double-glazed painted timber units and installation of five conservation-style rooflights.
Granted Full applications New dwelling Loft or dormer +1 24 docsDomestic -
16 Hill Road London NW8 9QG
100% historically approved · decision due ~1 Jul
2 x sycamores (front) the trees were last pruned in December 2022. In the past you have given permission for the pruning of both trees back to the previous points of pruning. Our request this time is for Tree 2 to be pruned as before but for Tree 1 to be reduced in height to the same level as tree 2 and as per the trees in Alma square - photo marked A enclosed. A photo of Tree 1 and Tree 2 also enclosed - Marked B.
Awaiting decision Trees 1 doc -
Top Flat 27 Alma Square NW8 9PY
Mansard roof extension to top floor flat.
Refused Full applications Extension Loft or dormer 30 docs
Other full applications
In Westminster
-
26/06295/FULL Awaiting decision
15 Warwick Way London SW1V 1QT
Installation of a new shopfront.
-
26/06297/FULL Awaiting decision
15 Warwick Way London SW1V 1QT
Alterations to rear elevation at basement level.
-
26/03576/FULL Decided
15A Devonshire Terrace London W2 3DW
Erection of an infill extension to basement courtyard to form new bedroom and internal alterations. (Linked with 26/03577/LBC)
-
26/06202/FULL Awaiting decision
106 Blandford Street London W1U 8AG
Installation of two roof-mounted anchor posts. (Linked to 26/06203/LBC)
-
26/04986/FULL Decided
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.