Planning application
4 St James's Street London SW1A 1EF
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Alterations to the interior built fabric to improve the retail space.
As published by the council, reference 26/04359/LBC
Application record
- Reference
- 26/04359/LBC
- Category
- Heritage and listed buildings
- Status
- Decided
- Received
- 1 Jul 2026
- Validated
- 1 Jul 2026
- Postcode
- SW1A 1EF
Timeline
Dates from the published record
-
1 Jul 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
9 Aug 2026
Status changed to Decided
Previously Pending.
After the decision
Westminster has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
3 St James's Street London SW1A 1EG
90% historically approved · decision due ~3 Nov
Installation of original gas lantern.
Awaiting decision Heritage and listed buildings 25 docs -
1 Pickering Place London SW1A 1EA
90% historically approved · decision due ~3 Nov
Installation of original gas lantern (1 - 4 Pickering Place)
Awaiting decision Heritage and listed buildings 24 docs -
20 Crown Passage London SW1Y 6PP
89% historically approved · decision due ~19 Jun
Air conditioning condenser unit on the back wall of the property, at intermediate 2nd- 3rd floor level. 3 air conditioning condenser units provide the heating system for the upper 3 floors of the property. They are partially or fully hidden from the view of the properties opposite. 2 units have been present for more than 10 years, the 3rd unit for more than 4 years.
Awaiting decision 2 docsSeveral homes -
20 Crown Passage London SW1Y 6PP
Installation of two air conditioning units to rear elevation. Installation air vent cover at ground floor level to Crown Passage side elevation.
Granted Full applications 20 docs -
19 Crown Passage London SW1Y 6PP
Internal alterations at basement level.
Granted Heritage and listed buildings 16 docs -
Byron House 7 - 9 St James's Street London SW1A 1EE
88% historically approved · decision due ~25 Sep
Variation of conditions 4 and 5 of planning permission dated 16 June 2025 (RN: 25/03133/FULL) for the: Remodelling of existing seventh floor roof extension including enlarged window openings, timber louvres to existing plant area and creation of roof terrace with metal balustrade and planter boxes. NAMELY, to allow extending the hours of operation; making it available for third party use; and allowing for the playing of music.
Awaiting decision Full applications Extension Windows or glazing
Other heritage and listed building applications
In Westminster
-
26/07529/LBC Awaiting decision
69 Eaton Place London SW1X 8DF
Installation of new cast iron water supply pipe on rear courtyard elevation. (Linked with 26/07528/FULL)
-
26/07509/LBC Awaiting decision
Buckingham Palace The Mall London SW1A 1AA
Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07508/FULL)
-
26/07473/LBC Awaiting decision
Flat 3 82 New Cavendish Street London W1G 9TA
Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07472/FULL)
-
26/07471/LBC Awaiting decision
12 Queen Anne's Gate London SW1H 9AA
Excavation of single-storey basement, internal reconfiguration and installation of modern services. (Linked with 26/07470/FULL)
-
26/07461/LBC Awaiting decision
1 Savile Row London W1S 3JR
Minor internal works comprising redecoration and upgrades to lighting, flooring and bathroom and kitchen facilities, together with external works including new lighting and signage.