Planning application
26/04110/FULL
Lords Cricket Ground St John's Wood Road London NW8 8QZ
Proposal
Variation of condition 3 of planning permission dated 5th October 2016 (RN:16/07681/FULL) for the Erection of a temporary single storey roof extension at third floor level for a period of 5 years. Namely, to secure temporary planning consent for a further period of five years.
As published by the council, reference 26/04110/FULL
Timeline
Dates from the published record
-
22 Jun 2026
Received by Westminster
-
15 Jul 2026
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/03132/NMA Awaiting decision
Lords Cricket Ground St John's Wood Road London NW8 8QZ
Amendments to planning permission dated 22 October 2019 (RN: 19/03697/FULL) for the removal of conditions 15 and 21 and variation of Condition 16 of planning permission dated 31 January 2019 (RN: 18/10209/FULL) for the redevelopment of the Warner Stand to allow the floodlights at the stand to be retained permanently, to allow the headframe of the floodlights to remain in-situ outside of the cricket season, to allow unrestricted day use of the floodlights from 10am to 7.30pm (when required by bad light) and an extension of the number of evening uses of the floodlights from 10 to 18 per cricket season with an additional 5 evening matches in an International tournament year (international tournaments to be played not more than every 3 years). Namely, to vary the wording of condition 15 to facilitate the use of the existing floodlights to be used for drone shows scheduled for 20 and 21 November 2026 (with reserve dates in case of bad weather for 12 and 13 February 2027) between the hours of 16.30 and 18.00 (to facilitate safe access to seating) and 18.40-19.40 to facilitate safe egress following the show).
-
26/03131/NMA Awaiting decision
Lords Cricket Ground St John's Wood Road London NW8 8QZ
Amendments to planning permission dated 20 September 2019 (RN: 19/03696/FULL) for the removal of conditions 1 and 4 and variation of condition 2 of planning permission dated 31 January 2019 (18/10206/FULL) to allow the 3 existing retractable floodlights at the Compton, Edrich and Tavern stands to be retained permanently, to allow the headframe of the floodlights to remain in-situ outside of the cricket season, to allow unrestricted day use of the floodlights from 10am to 7.30pm (when required by bad light) and an extension of the number of evening uses of the floodlights from 10 to 18 per cricket season with an additional 5 evening matches in an International tournament year (international tournaments to be played not more than every 3 years). Namely, to vary the wording of condition 1 to facilitate the use of the existing floodlights to be used for drone shows scheduled for 20 and 21 November 2026 (with reserve dates in case of bad weather for 12 and 13 February 2027) between the hours of 16.30 and 18.00 (to facilitate safe access to seating) and 18.40-19.40 to facilitate safe egress following the show).
-
26/04783/ADFULL Awaiting decision
Ground Floor Lords Cricket Ground St John's Wood Road London NW8 8QN
Details of new facades to Allen Stand pursuant to condition 21(A) of planning permission dated 04 April 2024 (RN: 23/08458/FULL)
-
25/07276/ADLBC Granted
Ground Floor Lords Cricket Ground St John's Wood Road London NW8 8QN
Details of a method statement covering either the full or relevant part of the works which are proposed to be undertaken pursuant to condition 3 of listed building dated 4th September 2025 (RN:25/03971/LBC)
-
26/03312/ADFULL Awaiting decision
Ground Floor Lords Cricket Ground St John's Wood Road London NW8 8QN
Details of package of repairs to the terracotta facade of the pavilion pursuant to condition 3 of listed building consent dated 04 April 2024 (RN: 23/08621/LBC)
-
26/03312/ADLBC Awaiting decision
Ground Floor Lords Cricket Ground St John's Wood Road London NW8 8QN
Details of package of repairs to the terracotta facade of the pavilion pursuant to condition 3 of listed building consent dated 04 April 2024 (RN: 23/08621/LBC)
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.