Proposal
Amendments to planning permission dated 25 May 2023 (RN: 22/07991/FULL) for: refurbishment of the existing building including relocation and provision of mechanical plant at eighth floor level and roof level, installation of photovoltaic panels and new lift overrun at roof level. Alterations to the Carlton House Terrace elevation to facilitate wheelchair access. Replacement of existing windows on the building and installation of acoustic louvres to the west facade at eighth floor level. Alterations to the building undercroft including a new entrance lobby and facade lighting and CCTV. Provision of a new cycle and waste store and loading bay. External alterations to the adjacent piazza area including the installation of bollards, raised external area and the demised area for external seating and external lighting to the stair and passage to Carlton House Terrace; namely to include a roof step-over ladder and to amend PV panel layout.
As published by the council, reference 26/03875/NMA
Timeline
Dates from the published record
-
12 Jun 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About amendments applications
How this application type works
An amendment application changes a permission that already exists. Non-material amendments cover small adjustments with no wider effect, while minor material amendments, usually made by varying a condition, allow modest design changes without a fresh application. Anything beyond that needs a new permission, so the scope here is deliberately narrow.
Nearby applications
Within 500 metres
-
26/00280/TCA Granted
10 Spring Gardens London SW1A 2BN
T1 1 x Platanus x hispanica: Crown lift by 2m, pruning low hanging branches secondary branches only, leaving a well-balanced crown. Reduce back off adjacent wall/building to give 2m clearance. Reduce Previously reduced, overextended, low lateral branches, growing over the paved area to the East by approximately 1.5-2m shaping into upper crown. Remove Massaria infected branches with a diameter of up to 100mm and remove deadwood. T2 1 x Platanus x hispanica: Crown lift by 2m, pruning low hanging branches secondary branches only, leaving a well-balanced crown. Reduce Previously reduced, overextended, low lateral branches, growing over the paved area to the East by approximately 1.5-2m shaping into upper crown. Remove Massaria infected branches with a diameter of up to 100mm and remove deadwood. T3 1 x Platanus x hispanica: Crown lift by 2m, pruning low hanging branches secondary branches only, leaving a well-balanced crown. Reduce back off adjacent wall/building to give 2m clearance. Reduce Over-extended branch adjacent to the National Insitute for Health Building by 1.5m to balance crown. Remove Massaria infected branches with a diameter of up to 100mm and remove deadwood.
-
25/09212/FULL Awaiting decision
10 Spring Gardens London SW1A 2BN
New hard and soft landscaping of the piazza area in front of 10 Spring Gardens and partial replacement of the existing steps (towards The Mall) to provide a new ramped access.
-
06/01409/ADV Refused
2 Spring Gardens London SW1A 2TS
Retention of two flags (1 each on Spring Gardens and Cockspur Street elevations).
-
08/06241/ADV Withdrawn
2 Spring Gardens London SW1A 2TS
Display of three exterior banners inside the fascia portion of the facade to Cockspur Street and Spring Gardens elevations for a temporary period.
-
25/06921/LBC Awaiting decision
66 Trafalgar Square London WC2N 5DS
Installation of brackets for hanging flower baskets and associated cabling. (Retrospective)
-
25/06920/FULL Awaiting decision
66 Trafalgar Square London WC2N 5DS
Installation of brackets for hanging flower baskets and associated cabling. (Retrospective)
Other amendments applications
In Westminster
-
26/04962/NMA Awaiting decision
Serpentine Gallery Kensington Gardens Exhibition Road London W2 3XA
Amendments to planning permission dated 27 February 2025 (RN: 24/08940/FULL) for the installation of temporary art sculpture from 24 March 2025 to 09 September 2025; NAMELY to extend the temporary planning consent until 21st March 2027.
-
26/04951/NMA Awaiting decision
43 - 45 Portman Square London W1H 6LY
Amendments to planning permission dated 22 April 2026 (25/06153/FULL) for: Variation of Condition 1 of planning permission dated 7 April 2025 (24/04987/FULL) for: Partial demolition of the existing roof and removal of plant equipment; construction of a roof extension providing new office (Class E) floorspace with associated external amenity spaces and plant equipment; refurbishment of the existing building, including infilling of the existing atrium; alterations to the existing façade; provision of cycle parking spaces and end of journey facilities, and all associated and ancillary works NAMELY; to amend the wording of Condition 27 to allow basement demolition work to proceed.
-
26/04873/NMA Awaiting decision
Orbis House 5 Mansfield Street London W1G 9NG
Amendments to planning permission dated 05 September 2024 (RN: 24/01895/FULL) for: new courtyard surface including walk-on rooflight; window and door alterations; new window to Mansfield Mews at second floor level; new rooflights; repairs to roof and external brickwork; erection of new staircase in front area lightwell; partial infill of rear lightwell at ground floor level; erection of roof terrace; installation of PV panels at roof level; and associated works namely; to allow provision of guarding system to provide safe access for maintenance across the roof; alteration at south elevation omitting window SFW11 from the new WC, remove the existing RWP from the internal courtyard corner, removal of the existing plastic section of a redundant vent pipe at lower level and retain original lead; new cast iron rain water pipes at west elevation; and internal layout alterations at basement, ground, 2nd, 3rd floors. (Linked with 26/04876/LBC)
-
26/04870/NMA Awaiting decision
34 Park Street London W1K 2JD
Amendments to planning permission dated 8 May 2026 (25/07808/FULL) for general refurbishment and M&E upgrade of the office building namely; roof walkable skylight, GF meeting room wall mounted TV, garden bench and planters, fire lobbies, L4 glass partition, reception to hall door swing change, front lightwell electric cupboard change, wall panelling on LGF and L5, LGF modular screen, LGF courtyard window door infill, and LGF cove lighting.
-
26/04816/NMA Awaiting decision
Ebury Bridge Estate Ebury Bridge Road London SW1W 8PX
Amendments to planning permission dated 21 July 2023 (RN:23/00331/COOUT) for a mixed use development in outline for residential floorspace and ancillary residential facilities (Class C3) non-residential floorspace comprising flexible retail (Classes A1 - A4), community (Class D1), leisure (Class D2) and workspace (Class B1) floorspace; provision of basement; new pedestrian and vehicular access; and associated amenity space, open space, plant, landscaping, car and cycle parking, refuse storage, servicing area, and other associated infrastructure works; and detailed planning consent for Blocks 7 and 8 comprising residential floorspace and ancillary residential facilities (Class C3); provision of a basement; new pedestrian and vehicular access; and associated amenity space landscaping, car and cycle parking, refuse storage, servicing area, and other associated infrastructure works, namely amendments to the approved Masterplan Phasing to incorporate enabling works and piling in Phase 2a and 3a.