Planning application
64 - 65 St James's Street London SW1A 1NF
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Details of how waste is to be stored on site, pursuant to condition 18 of planning permission dated 2nd September 2021 (RN 21/02158/FULL)
As published by the council, reference 26/02528/ADFULL
Application record
- Reference
- 26/02528/ADFULL
- Type
- Approval of Details (Full PP)
- Status
- Pending
- Received
- 17 Apr 2026
- Validated
- 17 Apr 2026
- Ward
- St James's
- Postcode
- SW1A 1NF
Site history
Applications at this address on the Westminster register
This site has had 3 applications since 2022: 2 approved, 0 refused.
-
26/00434/NMA Granted
64 - 65 St James's Street London SW1A 1NF
Amendments to planning permission dated 2 September 2021 (RN: 21/02158/FULL) for: Demolition of the existing mansard roof and removal of plant and escape stair; erection of new double mansard roof extension and rear extension for additional commercial floorspace (Use Class E); and installation of new escape stair, rear balconies, roof terrace and associated works namely; increase in height of internal stair core roof; solid hinged access hatch with integrated glazed AOV replaced with sliding glazed access rooflight and separate glazed AOV.
-
22/04890/NMA Granted
64 - 65 St James's Street London SW1A 1NF
Amendments to planning permission dated 2 September 2021 (RN: 21/02158/FULL) for 'Demolition of the existing mansard roof and removal of plant and escape stair; erection of new double mansard roof extension and rear extension for additional commercial floorspace (Use Class E); and installation of new escape stair, rear balconies, roof terrace and associated works'. Namely, reduction in height of the internal stair core roof to line through with the height of the lift overruns, removal of the 3rd floor oversailing balcony and associated fixed screen and door to the new infill extension and replacement of existing rear façade windows above Blue Ball Yard entrance within existing openings.
Timeline
Dates from the published record
-
17 Apr 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 12 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 64 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Palmer Tabor Properties Agent
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 89 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
64 - 65 St James's Street London SW1A 1NF
Amendments to planning permission dated 2 September 2021 (RN: 21/02158/FULL) for 'Demolition of the existing mansard roof and removal of plant and escape stair; erection of new double mansard roof extension and rear extension for additional commercial floorspace (Use Class E); and installation of new escape stair, rear balconies, roof terrace and associated works'. Namely, reduction in height of the internal stair core roof to line through with the height of the lift overruns, removal of the 3rd floor oversailing balcony and associated fixed screen and door to the new infill extension and replacement of existing rear façade windows above Blue Ball Yard entrance within existing openings.
Granted Amendments Extension Loft or dormer +2 27 docs -
64 - 65 St James's Street London SW1A 1NF
Amendments to planning permission dated 2 September 2021 (RN: 21/02158/FULL) for: Demolition of the existing mansard roof and removal of plant and escape stair; erection of new double mansard roof extension and rear extension for additional commercial floorspace (Use Class E); and installation of new escape stair, rear balconies, roof terrace and associated works namely; increase in height of internal stair core roof; solid hinged access hatch with integrated glazed AOV replaced with sliding glazed access rooflight and separate glazed AOV.
Granted Amendments Extension Loft or dormer +2 27 docs -
Target House 66 St James's Street London SW1A 1NE
Installation of three air conditioning units and louvre acoustic screen at roof level.
Granted Full applications 6 docs -
Target House 66 St James's Street London SW1A 1NE
Display of externally illuminated projecting sign.
Granted Advertising 4 docs -
Target House 66 St James's Street London SW1A 1NE
Replacement of existing roof mounted air conditioning equipment.
Granted Full applications 10 docs -
Target House 66 St James's Street London SW1A 1NE
Details of acoustic screen and relationship to parapet wall pursuant to Condition 7 of planning permission dated 28 January 2008 (RN: 07/09938).
Granted Full applications 3 docs
Other full applications
In Westminster
-
26/06295/FULL Awaiting decision
15 Warwick Way London SW1V 1QT
Installation of a new shopfront.
-
26/06297/FULL Awaiting decision
15 Warwick Way London SW1V 1QT
Alterations to rear elevation at basement level.
-
26/03576/FULL Decided
15A Devonshire Terrace London W2 3DW
Erection of an infill extension to basement courtyard to form new bedroom and internal alterations. (Linked with 26/03577/LBC)
-
26/06202/FULL Awaiting decision
106 Blandford Street London W1U 8AG
Installation of two roof-mounted anchor posts. (Linked to 26/06203/LBC)
-
26/04986/FULL Decided
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.