Planning application

26/01472/ADFULL

40 - 46 Brook Street West End London W1K 5DB

Granted Westminster Approval of Details (Full PP)

Proposal

Detailed design and construction method statements for all of the ground floor structures, foundations and basements and for any other structures below ground level, including piling, any other temporary or permanent installations and for site investigations which accommodate the location and of the Crossrail structures including temporary works and mitigate the effects on Crossrail, of ground movement arising from development; and method statement to include arrangements to secure that, during any period when concurrent construction is taking place of both the permitted development and of the Crossrail structures and tunnels in or adjacent to the site of the approved development, the construction of the Crossrail structures and tunnels is not impeded, pursuant to Conditions 45 and 46 of planning permission dated 19 April 2023 (RN: 22/04610/FULL) (PART APPROVAL - HOTEL PHASE ONLY)

As published by the council, reference 26/01472/ADFULL

Timeline

Dates from the published record

  1. 9 Mar 2026

    Received by Westminster

  2. 25 Mar 2026

    Decision issued: Application Permitted

  3. 21 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25/06401/LBC Granted

    40 - 46 Brook Street West End London W1K 5DB

    Minor works to the external party wall between 40-46 Brook Street and 48 Brook Street, minor works to the parapet of 48 Brook Street and other associated works.

    8 Sep 2025 4m away Heritage and listed buildings
  • 25/08003/ADLBC Awaiting decision

    10 South Molton Street London W1K 5QJ

    detailed drawings and method statements of all works to restore and/or relocate any chimneypieces and fire grates pursuant to condition 8 of listed building consent dated 1st September 2025 (RN:25/03046).

    4 Nov 2025 39m away Conditions
  • 26/02557/ADLBC Awaiting decision

    10 South Molton Street London W1K 5QJ

    Detailed drawings of new windows pursuant of Condition 3 a (Part 2) of listed building consent dated 1st September 2025 (RN:25/03046).

    17 Apr 2026 39m away Conditions
  • 25/06509/ADLBC Granted

    10 South Molton Street London W1K 5QJ

    Details of roof level plant and screening pursuant to condition 3a (part 4) of listed building consent dated 01 September 2025 (RN: 25/03046/LBC)

    11 Sep 2025 39m away Conditions
  • 26/02295/ADLBC Awaiting decision

    10 South Molton Street London W1K 5QJ

    Details of passageway / design of gates to passageway pursuant to conditions 3a5 and 3b of listed building consent dated 27 June 2025 (RN: 25/03046/LBC) [Linked to 26/02301/ADFULL]

    7 Apr 2026 39m away Conditions
  • 25/06294/ADLBC Granted

    10 South Molton Street London W1K 5QJ

    Detailed drawings of the internal wall linings where proposed for walls with existing historic panelling and/or cornices pursuant to condition 3 (A) (8) of listed building dated 1st September 2025 (RN:25/03046/LBC)

    4 Sep 2025 39m away Conditions

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications