Planning application
26/01114/ADFULL
6 - 10 Bruton Street London W1J 6PU
Proposal
Details of contaminated land assessment (phases 1-3 only) pursuant to condition 10 (partial) of planning permission dated 19 November 2025 (RN: 24/05241/FULL)
As published by the council, reference 26/01114/ADFULL
Timeline
Dates from the published record
-
23 Feb 2026
Received by Westminster
-
15 Apr 2026
Decision issued: Application Permitted
-
21 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/01116/ADFULL Awaiting decision
6 - 10 Bruton Street London W1J 6PU
Details of pre-demolition audit pursuant to condition 25 (Part A) of planning permission dated 19 November 2025 (RN: 24/05241/FULL)
-
26/01117/ADFULL Awaiting decision
6 - 10 Bruton Street London W1J 6PU
Details of whole life carbon assessment (part A) pursuant to condition 24 (partial) of planning permission dated 19 November 2025 (RN: 24/05241/FULL)
-
26/01115/ADFULL Awaiting decision
6 - 10 Bruton Street London W1J 6PU
Details of energy assessment demonstrating that the proposed development will maximise regulated carbon dioxide emission savings and as a minimum will achieve savings not less than 22% for emissions beyond the Target Emissions Rate of Part L of Building Regulations 2021 L of Building Regulations 20 pursuant to condition 26 of planning permission dated 19 November 2025 (RN: 24/05241/FULL)
-
26/01288/ADFULL Awaiting decision
6 - 10 Bruton Street London W1J 6PU
Details to demonstrate that demolition on the site will only occur immediately prior to development of the new building pursuant to Condition 37 of planning permission dated 19 November 2025 (RN: 24/05241/FULL)
-
26/02698/ADFULL Awaiting decision
6 - 10 Bruton Street London W1J 6PU
Partial discharge of council's Code of Construction Practice; pursuant to condition 3 (part a) of planning permission dated 19th November 2025 (RN 24/05241/FULL)
-
06/09111/TELCOM Decided
Payphone Outside 10 Bruton Street London W1J 6PY
Resite one K6 style telephone kiosk.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.