Skip to content
PlanIndex Get alerts
Menu

Planning application

144 Praed Street London W2 1HU

Granted Westminster 26/00727/ADFULL Approval of Details (Full PP)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Details of Construction Logistics Plan (in consultation with Transport for London) pursuant to condition 4 of planning permission dated 9 August 2024 (RN: 22/08247/FULL)

As published by the council, reference 26/00727/ADFULL

Application record

Reference
26/00727/ADFULL
Type
Approval of Details (Full PP)
Status
Decided
Decision
Granted As published: Application Permitted
Received
6 Feb 2026
Validated
6 Feb 2026
Decided
10 Apr 2026
Ward
Hyde Park
Decision by
Delegated Decision
Postcode
W2 1HU

Site history

Applications at this address on the Westminster register

This site has had 6 applications since 2022: 2 approved, 0 refused.

  • 26/07243/NMA Awaiting decision

    144 Praed Street London W2 1HU

    Amendments to planning permission dated 09 August 2024 (RN: 22/08247/FULL) for the replacement of the mansard roof with a sheer brickwork extension, new mansard roof extension and rooftop plant enclosure to provide additional hotel accommodation (Class C1); alterations to facade fenestration and shopfronts; installation of a green wall to the side (north-east); and associated works. NAMELY, to amend Condition 13 to require details of the modular green wall to be submitted prior to commencement of the relevant part of the development.

    Submitted 22 Oct 2026 Amendments
  • 26/05924/ADFULL Awaiting decision

    144 Praed Street London W2 1HU

    Details of consultation with London Underground pursuant to condition 3 of planning permission dated 09.08.2024 (RN: 22/08247/FULL).

    Submitted 31 Aug 2026
  • 26/03466/ADFULL Awaiting decision

    144 Praed Street London W2 1HU

    Detailed modular green wall to include details of the construction, depth and specification of the substrate, the number, size, species and density of the proposed planting, and details of sustainable irrigation and maintenance, including a bio-diversity management plan pursuant to condition 13 of planning permission dated 9th August 2024 (RN:22/08247).

    Submitted 27 May 2026 Full applications
  • 26/02093/FULL Awaiting decision

    144 Praed Street London W2 1HU

    Variation of condition 1 of planning permission dated 9th August 2024 (RN:22/08247/FULL) for the Replacement of mansard roof with sheer brickwork extension, new mansard roof extension and roof top plant enclosure to provide additional hotel accommodation (Class C1). Alterations to façade fenestration and shopfronts to the building, installation of green wall to side (north east) and associated works. NAMELY, To secure amendments to the roof scape of the approved hotel, including new dormers will be introduced to serve the new 7th floor hotel bedrooms; extension of firefighting lift and staircase housing by 1 storey; consented roof plant enclosure is moved up a storey and pulled back from the roof perimeter and architectural metal railings proposed to screen the plant.

    Submitted 30 Mar 2026 Full applications
  • 22/03681/FULL Granted

    144 Praed Street London W2 1HU

    Rooftop apparatus comprising; 3 support poles supporting 6 pole mounted antennas, 1x 300mm dish, 1 x200mm diameter dish, 4 cabinets and ancillary works thereto for a temporary period of 12 months.

    Decided 1 Aug 2022 Full applications

Timeline

Dates from the published record

  1. 6 Feb 2026

    Received by Westminster

  2. 10 Apr 2026

    Decision issued: Application Permitted

  3. 21 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Snow&Co Agent

4 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Westminster granted permission on 10 April 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Ground Front 144 Praed Street London W2 1HU

    26/05161/ADV Submitted 30 Jul 2026 50 yards away

    82% historically approved · decision due ~20 Oct

    Display of halo illuminated fascia sign measuring 0.45m x 4.58m and externally illuminated hanging sign measuring 0.60m x 0.53m.

    Decided Advertising
  • 144 Praed Street London W2 1HU

    26/05924/ADFULL Submitted 31 Aug 2026 50 yards away

    89% historically approved · decision due ~17 Nov

    Details of consultation with London Underground pursuant to condition 3 of planning permission dated 09.08.2024 (RN: 22/08247/FULL).

    Awaiting decision
  • 144 Praed Street London W2 1HU

    26/07243/NMA Submitted 22 Oct 2026 50 yards away

    93% historically approved · decision due ~17 Dec

    Amendments to planning permission dated 09 August 2024 (RN: 22/08247/FULL) for the replacement of the mansard roof with a sheer brickwork extension, new mansard roof extension and rooftop plant enclosure to provide additional hotel accommodation (Class C1); alterations to facade fenestration and shopfronts; installation of a green wall to the side (north-east); and associated works. NAMELY, to amend Condition 13 to require details of the modular green wall to be submitted prior to commencement of the relevant part of the development.

    Awaiting decision Amendments Extension Loft or dormer +1
  • 144 Praed Street London W2 1HU

    26/03466/ADFULL Submitted 27 May 2026 50 yards away

    88% historically approved · decision due ~22 Jul

    Detailed modular green wall to include details of the construction, depth and specification of the substrate, the number, size, species and density of the proposed planting, and details of sustainable irrigation and maintenance, including a bio-diversity management plan pursuant to condition 13 of planning permission dated 9th August 2024 (RN:22/08247).

    Awaiting decision Full applications 8 docs
  • 144 Praed Street London W2 1HU

    26/02093/FULL Submitted 30 Mar 2026 50 yards away

    88% historically approved · decision due ~25 May

    Variation of condition 1 of planning permission dated 9th August 2024 (RN:22/08247/FULL) for the Replacement of mansard roof with sheer brickwork extension, new mansard roof extension and roof top plant enclosure to provide additional hotel accommodation (Class C1). Alterations to façade fenestration and shopfronts to the building, installation of green wall to side (north east) and associated works. NAMELY, To secure amendments to the roof scape of the approved hotel, including new dormers will be introduced to serve the new 7th floor hotel bedrooms; extension of firefighting lift and staircase housing by 1 storey; consented roof plant enclosure is moved up a storey and pulled back from the roof perimeter and architectural metal railings proposed to screen the plant.

    Awaiting decision Full applications Extension Loft or dormer +1 31 docs
  • 144 Praed Street London W2 1HU

    22/03681/FULL Submitted 6 Jun 2022 50 yards away

    Rooftop apparatus comprising; 3 support poles supporting 6 pole mounted antennas, 1x 300mm dish, 1 x200mm diameter dish, 4 cabinets and ancillary works thereto for a temporary period of 12 months.

    Granted Full applications 29 docs

In Westminster

  • 26/07508/FULL Awaiting decision

    Buckingham Palace The Mall London SW1A 1AA

    Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)

    Received 4 Nov, published by the council 5 Nov 2026 Full applications
  • 26/07460/FULL Awaiting decision

    1 Hanover Square London W1S 1HA

    Installation of new public art sculptures and seating; hard and soft landscaping; installation of an area of raised terrace decking on St George Street measuring 43m x 2.6m for the placing of tables, chairs and banquette benches in connection with restaurant use; and associated external alterations and enabling works.

    Received 3 Nov, published by the council 5 Nov 2026 Full applications
  • 26/07451/FULL Awaiting decision

    Flat 1 31 South Audley Street London W1K 2PG

    Replacement of windows, Installation of an external condenser to the rear elevation including Internal refurbishment. (linked with 26/07452/LBC)

    Received 2 Nov, published by the council 4 Nov 2026 Full applications
  • 26/07443/FULL Awaiting decision

    150 Great Portland Street London W1W 6QD

    Installation of three air conditioning condenser units to the lower ground floor rear courtyard, incluidng erection of a plunge pool. (retrospective)

    Received 2 Nov, published by the council 4 Nov 2026 Full applications
  • 26/06234/FULL Decided

    40 Grosvenor Place London SW1X 7HJ

    Use of lower ground floor of Unit 3 and ground floor of Unit 2 as gym (Class E(d)) and/ or office (Class E(g))

    Received 11 Sep, published by the council 18 Sep 2026 Full applications