Planning application
72 Harley Street London W1G 7HG
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Replacement of fire doors at lower ground, ground and first floors.
As published by the council, reference 26/00216/LBC
Application record
- Reference
- 26/00216/LBC
- Type
- Listed Building Consent Application
- Status
- Decided
- Decision
- Granted As published: Application Permitted
- Received
- 15 Jan 2026
- Validated
- 15 Jan 2026
- Decided
- 2 Mar 2026
- Ward
- Marylebone
- Decision by
- Delegated Decision
- Postcode
- W1G 7HG
Site history
Applications at this address on the Westminster register
This site has had 3 applications since 2006: 3 approved, 0 refused.
-
06/09775/ADLBC Granted
72 Harley Street London W1G 7HG
Detailed drawings showing screening to the air-conditioning plant pursuant to Condition 2 of listed building consent dated 30 November 2006 (RN: 06/07893).
-
06/09774/ADFULL Granted
72 Harley Street London W1G 7HG
Detailed drawings showing screening to the air-conditioning plant pursuant to Condition 3 of planning permission dated 30 November 2006 (RN: 06/07892).
Timeline
Dates from the published record
-
15 Jan 2026
Received by Westminster
-
2 Mar 2026
Decision issued: Application Permitted
-
20 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Howard de Walden Estates Limited Agent, a developer registered in London
Active · incorporated 1963 · London
37 applications on PlanIndex · 91% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Westminster granted permission on 2 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
72 Harley Street London W1G 7HG
Detailed drawings showing screening to the air-conditioning plant pursuant to Condition 2 of listed building consent dated 30 November 2006 (RN: 06/07893).
Granted Conditions 5 docs -
72 Harley Street London W1G 7HG
Detailed drawings showing screening to the air-conditioning plant pursuant to Condition 3 of planning permission dated 30 November 2006 (RN: 06/07892).
Granted Full applications 4 docs -
70 Harley Street London W1G 7HF
88% historically approved · decision due ~30 Mar
Alterations to fourth floor flat, works including replacement of windows with Slimlite double glazing windows; layout alterations; and associated works. (Linked with 26/00203/LBC)
Awaiting decision Full applications Windows or glazing 21 docs -
70 Harley Street London W1G 7HF
90% historically approved · decision due ~30 Mar
Alterations to fourth floor flat, works including replacement of windows with Slimlite double glazing windows; replacement of fire doors; layout alterations; and associated works. (Linked to 26/00202/FULL)
Awaiting decision Heritage and listed buildings Windows or glazing 18 docs -
76 Harley Street London W1G 7HH
Details of a full schedule of works, specifications, and method statements, of works to the historic fabric associated with building regulations pursuant to Condition 1 (partial discharge- damp proofing only) of listed building consent dated 17 January 2008 (RN: 07/02370).
Granted Conditions 4 docs -
76 Harley Street London W1G 7HH
Partial demolition of rear wing at basement level, including infilling of lightwell; installation of a scissor lift in front basement lightwell with associated alterations to front railings; in connection with use of basement for medical purposes (Class D1).
Refused Full applications Demolition 12 docs
Other heritage and listed building applications
In Westminster
-
26/06288/LBC Decided
Barness Court 6 - 8 Westbourne Terrace London W2 3UW
Installation of a gas pipework to south elevation and wall. (Linked with 26/06287/FULL)
-
26/07529/LBC Awaiting decision
69 Eaton Place London SW1X 8DF
Installation of new cast iron water supply pipe on rear courtyard elevation. (Linked with 26/07528/FULL)
-
26/07509/LBC Awaiting decision
Buckingham Palace The Mall London SW1A 1AA
Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07508/FULL)
-
26/07473/LBC Awaiting decision
Flat 3 82 New Cavendish Street London W1G 9TA
Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07472/FULL)
-
26/07471/LBC Awaiting decision
12 Queen Anne's Gate London SW1H 9AA
Excavation of single-storey basement, internal reconfiguration and installation of modern services. (Linked with 26/07470/FULL)