Skip to content
PlanIndex Get alerts
Menu

Planning application

24 Chester Street London SW1X 7BL

Granted Westminster 26/00077/FULL Full Planning Permission Application

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of two storey rear extension at ground and lower ground floor level and associated works.

As published by the council, reference 26/00077/FULL

Application record

Reference
26/00077/FULL
Type
Full Planning Permission Application
Status
Decided
Decision
Granted As published: Application Permitted
Received
7 Jan 2026
Validated
30 Jan 2026
Decided
2 Apr 2026
Ward
Knightsbridge & Belgravia
Decision by
Delegated Decision
Postcode
SW1X 7BL

Site history

Applications at this address on the Westminster register

This site has had 2 applications since 2026: 2 approved, 0 refused.

  • 26/00078/LBC Granted

    24 Chester Street London SW1X 7BL

    Erection of two storey rear extension at ground and lower ground floor level and associated works.

    Decided 2 Apr 2026 Heritage and listed buildings

Timeline

Dates from the published record

  1. 7 Jan 2026

    Received by Westminster

  2. 30 Jan 2026

    Validated

    Checked as complete and ready for consideration.

  3. 2 Apr 2026

    Decision issued: Application Permitted

  4. 20 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

The Hyde Edwards Consultancy Agent

2 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

41 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Westminster granted permission on 2 April 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 24 Chester Street London SW1X 7BL

    26/00078/LBC Submitted 7 Jan 2026 50 yards away

    Erection of two storey rear extension at ground and lower ground floor level and associated works.

    Granted Heritage and listed buildings Extension 34 docs
  • 31 Chester Street London SW1X 7BL

    26/06948/LBC Submitted 12 Oct 2026 50 yards away

    90% historically approved · decision due ~7 Dec

    Internal alterations to the existing staircase and external alterations to the existing steps.

    Awaiting decision Heritage and listed buildings
  • 23 Chester Street London SW1X 7BL

    25/06021/FULL Submitted 22 Aug 2025 50 yards away

    Installation of new lift shaft up the rear elevation of the building.

    Withdrawn Full applications 15 docs
  • 23 Chester Street London SW1X 7BL

    25/06250/LBC Submitted 2 Sep 2025 50 yards away

    Installation of new lift shaft up the rear elevation of the building.

    Withdrawn Heritage and listed buildings 11 docs
  • 9 Little Chester Street London SW1X 7AL

    26/00916/ADFULL Submitted 13 Feb 2026 50 yards away

    88% historically approved · decision due ~10 Apr

    Details plans and elevations of all new external doors, windows and rooflights pursuant to condition 5 of planning permission dated 31 July 2024 (RN: 23/07308/FULL)

    Awaiting decision Full applications Loft or dormer Windows or glazing 5 docs
  • 12 Chester Street London SW1X 7BB

    26/02886/LBC Submitted 1 May 2026 50 yards away

    90% historically approved · decision due ~26 Jun

    Replacement of existing rear extension at first, second and third with a new rear extension (first to third floor level) with flat roof. Erection of an extension at rear ground floor level. Removal of the existing kitchen rooflight and extension of existing terrace at first floor level. Replacement of existing windows and French doors with new; and alterations to French door width at rear first floor level.

    Awaiting decision Heritage and listed buildings Extension Loft or dormer +1 12 docs

In Westminster

  • 26/05200/FULL Decided

    1 The Court House 165 Seymour Place London W1H 4PU

    Installation of waterproofing system to the existing lead flat roofs

    Received 3 Aug, published by the council 28 Aug 2026 Full applications
  • 26/07508/FULL Awaiting decision

    Buckingham Palace The Mall London SW1A 1AA

    Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)

    Received 4 Nov, published by the council 5 Nov 2026 Full applications
  • 26/07470/FULL Awaiting decision

    12 Queen Anne's Gate London SW1H 9AA

    Excavation of single-storey basement. (Linked with 26/07471/LBC).

    Received 3 Nov, published by the council 5 Nov 2026 Full applications
  • 26/07466/FULL Awaiting decision

    65 Albion Gate Albion Street W2 2LA

    Replacement of first-floor front elevation windows and balcony door with double-glazed steel-framed units.

    Received 3 Nov, published by the council 5 Nov 2026 Full applications
  • 26/07460/FULL Awaiting decision

    1 Hanover Square London W1S 1HA

    Installation of new public art sculptures and seating; hard and soft landscaping; installation of an area of raised terrace decking on St George Street measuring 43m x 2.6m for the placing of tables, chairs and banquette benches in connection with restaurant use; and associated external alterations and enabling works.

    Received 3 Nov, published by the council 5 Nov 2026 Full applications